Top-rated paving pros.

Get matched with top paving pros in Shawnee, OK

Enter your zip and get matched with up to 5 pros

Need a pro for your paving service project in Shawnee, OK?

Select your specific project to find the pro for you.

Find Paving pros in Shawnee

Avatar for Freeman's Landscaping
Freeman's Landscaping
4.6(
131
)

Serving Shawnee, OK and surrounding areas

Approved

Super Service Award Winner

In business since 1999

Free estimates

Warranties offered

"We have a shaded backyard and have had problems for years getting grass to grow. Mike and his crew came and prepared the soil, put down new beautiful sod, created a new flower bed and landscaped it. The result is absolutely beautiful. They are dependable and leave everything clean. I can’t recommend them enough!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+31

Response time3 days
10 neighbors recently requested a quote
Recommended by87%of homeowners
...
Showing 1-10 of 77
Paving Services questions, answered by experts

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

Asphalt dries and cures best between 50 and 85 degrees Fahrenheit. This range allows moisture to evaporate quickly without causing the asphalt to cool too fast, which can negatively affect the drying process. However, keep in mind that other weather conditions can also affect curing and drying times, such as precipitation and humidity.

Chip seal layers gravel and a liquid bitumen one at a time on-site, while asphalt directly pours a pre-combined mixture. Asphalt must be sealed, but it will last up to four times as long as chip seal driveways. Aesthetically, chip seal has a natural, rustic look compared to the traditional asphalt slab.

Professional installers often include a deep layer of crushed gravel under permeable pavers to allow more runoff to soak through into the soil below. Many installations will include multiple layers of gravel, with coarser aggregate at the base and finer aggregate that sits on top of that bottom layer. Above the gravel, you’ll often find coarse sand that helps reduce paver shifting over time. Some permeable paver designs include a water collection system set into the gravel layer to route runoff to a safe area for disposal.

If your driveway is cracked, you can repave it with a process called asphalt overlay. Overlay is more cost-effective than a full replacement but is better suited for minor cracks and issues. If you have major cracks or other problems like water pooling, asphalt overlay isn’t your best bet. Plus, paving over a cracked driveway only extends the lifetime by about 10 years, whereas replacing it would start the clock over completely to give you up to 30 years.

The Shawnee, OK homeowners’ guide to paving services

From average costs to expert advice, get all the answers you need to get your job done.