Top-rated above ground pool installation pros.

Best above ground pool installation pros near Monroeville, OH

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Monroeville, OH?

Select your specific project to find the pro for you.

Top-Rated Above ground pool installation pros in Monroeville - Updated Nov 2026

Avatar for American Home Shield – Home Warranty
American Home Shield – Home Warranty
3.5(
5,689
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Monroeville, OH and surrounding areas

In business since 1971

Credit card accepted

"One oven doesn't work at all ( my choice, see above), the "working" oven was never calibrated properly so using it is hit or miss. It's time to call American Home Shield to see about replacing the entire unit. I'm waiting to finish other home projects before calling them. I don't know if I'll request Greenway again."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Recommended by65%of homeowners
Schaade Services
5.0(
1
)
Above Ground Swimming Pool or Accessories - Repair or ServiceSwimming Pool - Above Ground, Build or Install - Have Materials

Serving Monroeville, OH and surrounding areas

In business since 2023

Free estimates

Credit card accepted

With years of experience in the construction industry, we are the experts you need to take care of your home or business. We handle all of your handyman needs with great care. We will treat your home as we would treat our own. Give Schaade Services a call today, we look forward to working with you!

Response time1 day
Anthony Buga
New to Angi
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Monroeville, OH and surrounding areas

My names Anthony I served most of my adult life so far in the United States Army and turned to heavy equipment operation as a civilian. I can get any piece of equipment for any job including but not limited to \nExcavation/trenching\nRetention ponds \nLand clearing \nGrading/sloping \nExcessive vegetation removal \nExcavation for pools \nDemolition \nHeavy material movement \nEtc.\n\n

One Stop Building Maintenance
0.0(
1
)
Swimming Pool - Above Ground - Build or InstallSwimming Pool - Above Ground, Build or Install - Have MaterialsSwimming Pool - Above Ground, Build or Install - Need Materials

Serving Monroeville, OH and surrounding areas

In business since 1990

At One Stop we cover all aspects of Home Improvement. From cleaning your house to additions and remodels, we do it all. We are a professional company, providing quality workmanship. Our customers are very important to us and your satisfaction is our number one priority. With repeat customers being over 75% of yearly business.

Install Above Ground Pools FAQs, answered by experts

Vinyl pools are the least expensive for installation thanks to the relatively low cost of vinyl pool liners. However, vinyl liners do not last as long as fiberglass or concrete designs, which could balance out the cost of the pool overall depending on its size.

Any number between 7.2 and 7.8 is an ideal pH for swimming pools or 80 to 120 ppm. Your pool testing kit should be able to measure both of these numbers. If your pool’s pH is below this range, the water is too acidic and can cause scaling and damage to pool equipment. If the water’s pH is above this range, it can decrease the effectiveness of necessary chemicals, like chlorine.

It’s a good idea to wait at least 24 hours after opening your pool before you swim in it. Pool opening often involves shocking the water, and the chemical levels need to come down a bit before it’s safe to swim. You can continue testing your water pH and chlorine levels if you’re in a rush. It’s wise to wait until your chlorine levels drop to under four parts per million (ppm) and you have a water pH of between 7.2 and 7.8. You can artificially lower your water pH to speed up the process.

Building a pool yourself will take at least eight to 12 weeks. After all, this is the building timeline after hiring a pool contractor who knows how to draw up plans, analyze your landscape, and apply for proper permits. If you choose to tackle any part of the process alone, assume building a pool will take two to three months at a minimum.

The type of sand you need for your sand filter depends on the manufacturer’s instructions, but you’ll need to use sand specifically for pool filters. Silica sand is a wallet-friendly, common choice that’s relatively easy to replace. You’ll choose between various grades of sand and different-sized sand grains.

The Monroeville, OH homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.