Top-rated basement remodelers.

Get matched with top basement remodelers in Millbury, OH

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Millbury, OH?

Select your specific project to find the pro for you.

Find Basement remodelers in Millbury

Avatar for Scott's General Services
Scott's General Services
4.2(
22
)
Basement - Remodel

Serving Millbury, OH and surrounding areas

Approved

In business since 2015

Small jobs welcome

Customers say: Terrific value

"Scott landscaped, painted exterior and interior of house, repaired multiple areas inside and out, waterproofed and finished basement, tuck pointed brick, sanded and refinished wood floors, replastered walls and ceiling and always willing to help us out with lifting and other activities as needed. Very conscientious and professional. Cleaned up after himself. Quality of work was excellent. Reasonably priced. Would very highly recommend."
Work Photos
Ottawa hills
Ottawa hills
Holland
Holland

+69

Response time2 days
Recommended by93%of homeowners
McVicker International
5.0(
3
)
Basement - Remodel

Serving Millbury, OH and surrounding areas

Approved

In business since 2025

Free estimates

Credit card accepted

"I hired Mcvicker International too help repair a few cosmetic and structural damages in my dry wall before giving it a fresh coat of paint. In my foyer, main Hallway, Living Room and Dining Room with some touch ups above my tile surround in my kitchen. Ive attempted to attach photos but the site seems to reject them? However it was superb quality regardless."
Avatar for Miller & Sons Construction & Home Builders
Miller & Sons Construction & Home Builders
New to Angi
Basement - Remodel

Serving Millbury, OH and surrounding areas

Approved

Free estimates

Warranties offered

Small jobs welcome

🏡 Dedicated to transforming homes with expertise in earthworks, concrete, pole barn building, and underground drainage. We believe in honest pricing and integrity, taking pride in our community and the quality of our work.

1 neighbors recently requested a quote
G L Construction Management
4.7(
3
)
Basement - Remodel

Serving Millbury, OH and surrounding areas

In business since 2016

Free estimates

Emergency services offered

"G L Construction Management was such a great company to work with! I had numerous services completed by them in many rooms of my home. Very professional and friendly company. I wanted several things done before I moved into my new home and they worked very quickly to get me and my child settled in before Chrismas. I would recommend them for any household construction needs."
Garage / Shed Build Project
Kitchen and Bath Remodeling Project
Kitchen and Bath Remodeling Project
Kitchen and Bath Remodeling Project
Kitchen and Bath Remodeling Project

+23

Recommended by100%of homeowners
...
Showing 1-10 of 77
Basement Remodel questions, answered by experts

Although homeowners often use the terms basement remodeling and basement finishing interchangeably, they are quite different terms. 

Finishing a basement is the process of taking a basement space that is not habitable and adding elements to make it usable. This includes adding plumbing, flooring, and insulation.

Remodeling a basement means taking an already existing finished basement and changing it, often by adding or removing walls, adding plumbing, or changing the existing flooring.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Common mistakes when finishing basement walls include neglecting proper insulation, insufficient moisture management, and poor ventilation. Not addressing these issues can lead to mold growth, water damage, and discomfort. Additionally, inadequate planning, improper framing, and rushing the project can result in subpar outcomes. 

It's essential to follow best practices, seek professional guidance if needed, and prioritize thoroughness and attention to detail.

You should always use high-quality lumber for your framing in order to ensure it will last the test of time and resist moisture. Use 2-foot by 4-foot lumber that is pressure-treated for your framing.

Adding a bathroom to your basement can increase your home value since homes with multiple bathrooms sell for more. The return on investment (ROI) for a basement bathroom is 50% to 75%. The actual return varies with your home and location. Adding a half bath to your home increases the value by 2.9% while finishing a basement increases the home value by 6.6%.

The Millbury, OH homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.