Top-rated excavation pros.

Get matched with top excavation pros in Laurelville, OH

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Laurelville, OH?

Select your specific project to find the pro for you.

TRUSTED BY LAURELVILLE, OH HOMEOWNERS

  • Average homeowner rating star icon4.2
    Average homeowner rating
  • Verified reviews icon11
    Verified excavation services reviews

Find Excavation pros in Laurelville

Avatar for Yeet Excavating
Yeet Excavating
5.0(
5
)
Building Site - Preparation and ClearingExcavation - Major Grading or Resloping

Serving Laurelville, OH and surrounding areas

Approved

Super Service Award Winner

In business since 2012

Free estimates

Credit card accepted

"From start to finish Yeet Excavating was professional, friendly, and knowledgeable. I had a few low spots in my yard where I needed graded out for the barn I wanted to build. Clay came out to my house and walked me step by step about the whole process. He was able to answer every question I had about the completion of the job. Yeet excavation finished faster than anticipated and left my yard looking amazing. I rate them 10/10."
Response time8 hrs
2 neighbors recently requested a quote
Recommended by60%of homeowners
...
Showing 1-10 of 147
Excavating questions, answered by experts

A perc test can take anywhere from one to eight hours to complete. The total time depends on factors like the amount of excavation required, the depth and width of the holes, and whether multiple test holes are needed. For a single hole, the process of filling it with water and monitoring the drainage rate usually takes less than an hour. Professionals can often complete the entire test in a single day. While it's possible to get results the same day, some companies may take a few days to provide the official report.

As a general rule, the protected area should be about 1½ times as wide as the canopy of the tree’s leaves. This digging measurement can vary by tree species and the age of the tree. Of course, that can be a lot of fencing for larger trees, which is why our first step is about making difficult decisions on which trees to save.

Digging out a basement takes anywhere from a few days to a few months. Most projects take at least two to five weeks, but it could take several months if you encounter obstacles. This project takes longer if you need to brace or raise your home before the excavation. Digging out a basement in new construction can take as little as three days.

Directional drilling is complex and requires training to use the advanced machinery. It can be challenging to monitor the position of the drill since there’s no direct line of sight. Directional drilling can also be more expensive with a cost of $10 to $30 per linear foot compared to $5 to $12 per linear foot for trenching. 

It takes one hour to dig a 10-foot trench by hand. Use a trenching shovel with a sharp tip and a long head. Plan for more time if your soil is heavy or rocky. Consider renting a trencher if you’re digging a long or deep trench or if you have challenging soil or terrain. 

The Laurelville, OH homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.