Top-rated excavation pros.

Best excavation pros near Laurelville, OH

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Laurelville, OH?

Select your specific project to find the pro for you.

TRUSTED BY LAURELVILLE, OH HOMEOWNERS

  • Average homeowner rating star icon4.2
    Average homeowner rating
  • Verified reviews icon11
    Verified excavation services reviews

Top-Rated Excavation pros in Laurelville - Updated Nov 2026

Avatar for Yeet Excavating
Yeet Excavating
5.0(
5
)
Building Site - Preparation and ClearingExcavation - Major Grading or Resloping

Serving Laurelville, OH and surrounding areas

Approved

Super Service Award Winner

In business since 2012

Free estimates

Credit card accepted

"From start to finish Yeet Excavating was professional, friendly, and knowledgeable. I had a few low spots in my yard where I needed graded out for the barn I wanted to build. Clay came out to my house and walked me step by step about the whole process. He was able to answer every question I had about the completion of the job. Yeet excavation finished faster than anticipated and left my yard looking amazing. I rate them 10/10."
Response time8 hrs
2 neighbors recently requested a quote
Recommended by60%of homeowners
...
Showing 1-10 of 149
Excavating FAQs, answered by experts

Errors in site preparation can lead to structural failures or appear costly midway. Professionals ensure detailed, reliable home base development layouts.

Trenches are typically 12 to 24 inches deep and 8 inches wide. However, the required depth depends on the specific project and local ordinances. For example, a French drain may need to be 18 inches deep, while a water pipe might require a depth of 24 inches and a drainage pipe 36 inches. Your city or county may have specific regulations, so it's wise to consult with an excavation professional to determine the correct depth for your project.

You can bury underground electrical wire six inches deep—but only if you use a rigid metal electrical conduit. For rigid, non-metallic conduits, bury the wire at least 12 inches deep. If using an underground feeder cable rated for direct burial, you'll need to place it at least 18 inches deep, as it has no conduit for extra protection.

The time it takes to build a pool—and dig out the area—varies based on the pool size and type. A professional excavator will take between four and eight hours to dig a pool. The process will take longer if they encounter large boulders or tree roots. Keep in mind that this is a small part of the process in the long run. You will need between eight and 12 weeks to build a pool from start to finish, including the time to apply for permits.

Yes. A metal detector is one of the quickest and easiest ways to find your septic tank. However, metal detectors can be too expensive (costing upward of $300 in some cases), and not everyone has a metal detector just lying around. If that’s the case for you, you can also take a long metal rod and poke it into the ground at regular intervals until you hit something—likely your septic tank lid.

The Laurelville, OH homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.