Top-rated above ground pool installation pros.

Get matched with top above ground pool installation pros in Mastic, NY

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Mastic, NY?

Select your specific project to find the pro for you.

TRUSTED BY MASTIC, NY HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon215
    Verified above ground pool installation services reviews

Find Above ground pool installation pros in Mastic

Avatar for Porter's Pool Service
Porter's Pool Service
4.5(
42
)
Above Ground Swimming Pool or Accessories - Repair or ServiceSwimming Pool - Above Ground, Build or Install - Have MaterialsSwimming Pool - Above Ground, Build or Install - Need Materials

Serving Mastic, NY and surrounding areas

Approved

In business since 2022

Free estimates

Emergency services offered

"I had a great experience with this company. From my first conversation with the owner, they were friendly, honest, knowledgeable and incredibly helpful. They took the time to answer all of my questions and were very transparent throughout the process, which I really appreciated. I originally reached out because I needed help putting together a new above-ground pool, but a family member ended up doing the installation instead. Even though I didn't become a customer, I was impressed by the professionalism and excellent customer service. Based on my experience, I wouldn't hesitate to recommend them or use them for future repairs when needed. Highly recommend"
Matt West Islip
Matt West Islip
Matt West Islip
Michelle Ronkonkoma
Response time1 day
Response rate89%
86 neighbors recently requested a quote
JS Pools
New to Angi
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Mastic, NY and surrounding areas

Approved

In business since 2009

Free estimates

Credit card accepted

We're a locally owned and operated company that values honesty and integrity and takes pride in the services we provide to our residential and commercial clients. We specialize in pool maintenance and weekly, monthy, or other routinely scheduled services. We provide free estimates, and you will find us to be competitively priced. We look forward to building lasting relationships and guarantee your satisfaction!

Avatar for JS Pools
JS Pools
4.6(
23
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Mastic, NY and surrounding areas

In business since 2009

Free estimates

Small jobs welcome

"Iâ m happy to endorse george and his work without any reservation. His work quality is excellent and easily takes on improvement or repair projects, in addition to weekly pool servicing. Heâ s very customer friendly and extremely diligent and proactive in helping me solve problems. I can imagine a better provider and happily refer customers to him."
Response time9 hrs
Recommended by95%of homeowners
Avatar for Safe ‘N Clear Pools
Safe ‘N Clear Pools
4.5(
8
)
Swimming Pool - Above Ground, Build or Install - Have MaterialsSwimming Pool - Above Ground, Build or Install - Need Materials

Serving Mastic, NY and surrounding areas

Free estimates

Emergency services offered

Small jobs welcome

If you’re looking for a one-stop-shop for all of your pool needs, you’ve found the right company. With an emphasis on customer care and communication, Safe ‘N Clear Pools has streamlined the process all the way from building your new pool to maintaining it on a weekly basis. With transparent and competitive pricing, consistent scheduling and state-of-the-art technology from billing to cleaning equipment, we are sure that you will be satisfied with our services.

4 neighbors recently requested a quote
...
Showing 1-10 of 52
Install Above Ground Pools questions, answered by experts

Draining a pool with a garden hose can take between eight and 14 hours depending on the depth of your pool and whether you use a sump pump. Be sure to stay close to the pool during this time to ensure the structure of your pool remains unharmed and that the water drains properly.

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

The most expensive part of building a pool is typically the excavation and labor, which can account for 25% to 50% of the total project cost. This is particularly true for inground pools that require significant excavation, potentially including the rental of large equipment, and extensive construction labor. In contrast, above-ground pools are generally less expensive as they typically do not require excavation and can be installed much more quickly. Concrete in-ground pools are among the most labor-intensive options.

It is possible to restore a filled-in pool. If you want to dig up and repair a filled-in pool in your backyard, the process will cost about the same as the cost of installing a new in-ground pool. You might do this if the filled-in pool is causing sinking, swelling, or drainage issues in your yard. A new pool may resolve these problems and increase your property value.

Generally speaking, you should expect to wait 24 to 48 hours after filling a pool before you use it. However, the actual timeline depends on a few factors. Most importantly, you need to shock the water with chlorine or an alternative to swimming pool chlorine and let the concentration come down to a safe level before using the pool. Additionally, most water sources will be cold, and it can take days before the sun or your pool heater warms your water to a comfortable temperature. Alternatively, getting water professionally delivered could have you swimming in just a few hours.

The Mastic, NY homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.