Top-rated basement remodelers.

Get matched with top basement remodelers in Greig, NY

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Greig, NY?

Select your specific project to find the pro for you.

Find Basement remodelers in Greig

Avatar for GAST Handyman Services
GAST Handyman Services
New to Angi
Basement - Remodel

Serving Greig, NY and surrounding areas

Approved

Free estimates

Emergency services offered

Small jobs welcome

Have been helping friends, coworkers, family and community with jobs, repairs and remodeling/repairs for years and am looking at expanding into more of a business model than "the guy who does stuff"\nI do free estimates and can usually start working the same week.\nIf you have any questions or inquiries please reach out!\nI also currently have a full time job and am available for work on Sundays and Mondays.

10 neighbors recently requested a quote
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Greig, NY and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for DeComm, LLC
DeComm, LLC
5.0(
3
)
Basement - Remodel

Serving Greig, NY and surrounding areas

In business since 2016

Free estimates

Credit card accepted

"Brian provided a quick and reasonable quote that was easily understood compared to others. He was very flexible with his schedule to suit my needs. Project was completed early, and met my expectations. Will be using Decomm on future projects!"
Response time30 mins
Recommended by100%of homeowners
Showing 1-10 of 44
Basement Remodel questions, answered by experts

You should plan on waiting at least a year and ideally two to three years after construction before finishing your basement. This will give the foundation time to settle in response to the weight of your home and the expansion of the surrounding soil. You can then repair your foundation and seal any cracks as needed before finishing it to reduce your risk of future leaks or other issues.

Kitchens and bathrooms are typically the most expensive rooms to renovate. The high cost is due to several factors, including expensive appliances like ranges, hoods, and refrigerators, as well as costly fixtures. The 'bones' of the room, such as electrical and plumbing, are also expensive to move or replace. Because of the vast amount of prep work, finishing, and specialized labor involved in a relatively small footprint, these projects can cost double or more than a living space remodel. Even when trying to renovate on a budget, kitchens and bathrooms will likely carry a hefty price tag.

In many homes, an unfinished basement is an ideal place for an in-ground pool. The concrete floors, protection against water damage, and access to the ground below your home make this a large contender. Speak with a local basement remodeling contractor to ensure your space is right for the large construction.

Yes, it is possible to turn a regular basement into a walkout basement. Doing so involves excavating the land around at least one side of your basement foundation, installing retaining walls to create a permanent below-grade area outside your home, and then cutting into the foundation to install an exterior door that leads out to the new space. This is an expensive and time-consuming project, but it can add a lot of value and utility to your home.

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

The Greig, NY homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.