Top-rated basement remodelers.

Best basement remodelers near Steuben, NY

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Steuben, NY?

Select your specific project to find the pro for you.

Top-Rated Basement remodelers in Steuben - Updated Nov 2026

Avatar for Schenandoah Construction Services
Schenandoah Construction Services
5.0(
3
)
Basement - Remodel

Serving Steuben, NY and surrounding areas

Approved

In business since 2016

Free estimates

Customers say: Quick response

"They finished the basement and installed a bathroom. They designed the layout snd everything turned out great. Their quote was what they charged in the end and they did great. Their quote was appropriate and affordable. The value was excellent and we are very happy"
Basement remodel
Basement remodel
Bathroom remodel
Kitchen remodel
Basement remodel

+3

Response time2 days
Recommended by100%of homeowners
Avatar for Nystrom Contracting LLC
Nystrom Contracting LLC
4.9(
9
)
Basement - Remodel

Serving Steuben, NY and surrounding areas

In business since 2022

Free estimates

Emergency services offered

"Everything went very smoothly. Very knowledgeable, efficient and personable. Answered all the questions I had and did a very thorough job. We will absolutely be using again for another home project we have."
Electrical Project
Remodel
Kitchen and Bath Remodeling Project
Electrical Project
Remodel

+44

Recommended by100%of homeowners
Avatar for Hearth to Home Construction of CNY, LLC
Hearth to Home Construction of CNY, LLC
5.0(
7
)
Basement - Remodel

Serving Steuben, NY and surrounding areas

In business since 2018

Free estimates

Credit card accepted

"I subcontracted with Hearth To Home to finish a bathroom remodel (wallpaper) for one of my clients. His work was impeccable, he had close attention to detail and the finished product was perfect. I will definitely be hiring him again in the future!! -Kirsten Home On A Hill Design"
Response time2 days
Recommended by100%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Steuben, NY and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
...
Showing 1-10 of 58
Basement Remodel FAQs, answered by experts

Unless you have extensive experience in construction work, remodeling a basement is best left to a professional. There are several tasks associated with this project that require exact precision, including:

  • Replacing insulation 

  • Replacing carpet or other flooring 

  • Adding heating and cooling

  • Adjusting or adding walls and doors

  • Altering or adding plumbing elements

If any of these elements is done incorrectly, it could severely impact the quality of your basement remodel and be dangerous. Changing a basement often comes with code safety requirements, like egress windows and proper ventilation. Therefore, leaving it up to a professional is often the best decision.

You should always use high-quality lumber for your framing in order to ensure it will last the test of time and resist moisture. Use 2-foot by 4-foot lumber that is pressure-treated for your framing.

Yes, you can add a bathroom to an unfinished basement, but you’ll want to take proper precautions if doing so. As with any bathroom addition, you’ll need to make sure that it’s approved by local building authorities first. With unfinished basements, you especially need to keep an eye on proper ventilation practices.

Basements with persistent moisture problems or flooding shouldn’t be finished until the moisture issues have been fixed. In addition, if your foundation is cracked, you have unmitigated radon levels, or you have asbestos or lead pipes, remediate the underlying problem before finishing your basement. Turning a basement into living space before fixing these issues can lead to serious health risks or structural damage. 

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

The Steuben, NY homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.