Top-rated basement remodelers.

Best basement remodelers near Wilna, NY

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Wilna, NY?

Select your specific project to find the pro for you.

Top-Rated Basement remodelers in Wilna - Updated Nov 2026

Avatar for ET Construction
ET Construction
5.0(
4
)
Basement - Remodel

Serving Wilna, NY and surrounding areas

Approved

In business since 2025

Emergency services offered

Warranties offered

"ET construction worked on our cottage this summer. ET replaced our old ceilings with knotty pine panels and upgraded our lights to ceiling fans. Also added more outlets. Also replaced outside siding. They were great to work with and efficient. I would recommend them. It’s hard to find someone that you can trust."
3 duplicate remodel
3 duplicate remodel
3 duplicate remodel
3 duplicate remodel
3 duplicate remodel

+107

Avatar for Travani Construction, LLC
Travani Construction, LLC
4.0(
5
)
Basement - Remodel

Serving Wilna, NY and surrounding areas

Approved

In business since 2020

Free estimates

Emergency services offered

"We were pleased with our bathroom renovation. We found Travani Construction to be reliable and personable to work with. The cost was reasonable. I have recommended their work to several friends."
Response time2 days
10 neighbors recently requested a quote
Dream Designs
New to Angi
Basement - Remodel

Serving Wilna, NY and surrounding areas

Approved

Free estimates

Emergency services offered

Warranties offered

My name is Rusty Wescott and after working 22 years building from the ground up, 22 years of dialing in my skills.But my other love is art I have always loved art, from my paintings, to wall murals, to home decor, and custom furniture. And Dream Designs new add-on is epoxy, tables,floors,countertops, stair treads and risers with a epoxy pour design, we pride our self on customers satisfaction, and if you can dream it up we can design and build it for you to make your dreams reality.

Demo
Sabrinas remodel
Sabrinas remodel
Demo
Sabrinas remodel

+17

22 neighbors recently requested a quote
Avatar for High Tech Construction Co
High Tech Construction Co
4.3(
43
)
Basement - Remodel

Serving Wilna, NY and surrounding areas

In business since 1987

Free estimates

Emergency services offered

"We shopped and spoke with many "facade restoration experts" before choosing to work with High Tech and we are so glad we did our research. Shaiful was by far the most knowledgeable contractor we spoke with and made us feel confident that he was capable of solving our issues.  When it was clear that there was no saving our original cornice, he offered up more than one suitable way forward. We decide to let his crew re-create the original piece from stone. The work they did left us with a beautiful and artistic facade the functions well in collecting rain water from the roof. The crew was respectful, clean and on time. They went above and beyond all of our expectations in touching up every minor detail so that the whole front of the house was left looking brand new. We could not be happier. Our home looks better than we could have imagined. I recommend High Tech Construction with no hesitation. 
"
Facade Restoration - High Tech Construction Co
stoop restoration -high tech construction co
Wood Stoop
Limestone Stoop
brownstone stoop and facade restoration

+20

Recommended by81%of homeowners
Avatar for JGP Carpentry and Construction
JGP Carpentry and Construction
4.6(
41
)
Basement - Remodel

Serving Wilna, NY and surrounding areas

In business since 2017

Free estimates

Credit card accepted

"very professional . was here when said they would be had project done in record time except for the counter tops which were ordered. when they come in will finish the project. would recommend to anyone."
bathroom
Bathroom
Bathroom
laminate flooring
Sliding door

+13

Response time7 hrs
Response rate91%
Recommended by97%of homeowners
...
Showing 1-10 of 61
Basement Remodel FAQs, answered by experts

The difficulty of adding a basement to an existing house can vary depending on the house’s location, the size of the basement, and the type and condition of the existing foundation. Adding a basement is a job best handled by the pros, so you’ll need to enlist professional help for this project.

Roughing in and connecting utilities are the hardest parts of finishing a basement, and they’re the parts we typically don’t recommend doing as a DIY project. Unfortunately, your finishing timeline can be extended by weeks while you wait for contractors and inspectors to install electrical wiring, plumbing lines, and heating/cooling equipment and carry out inspections.

Some older homes have toilets in the basement to combat sewage backups. This type of toilet, also known as a Pittsburgh potty, acted as a safety valve over the incoming sewer line. If a line backed up, it would back up into the toilet because it was the lowest fixture in the home, keeping it out of sight and away from the finished areas of the house.

Basement toilets were also used by workers with messy jobs, like those who worked in coal mines or steel mills. This way, they could clean up and avoid tracking dirt through their home.

Yes, it is possible to turn a regular basement into a walkout basement. Doing so involves excavating the land around at least one side of your basement foundation, installing retaining walls to create a permanent below-grade area outside your home, and then cutting into the foundation to install an exterior door that leads out to the new space. This is an expensive and time-consuming project, but it can add a lot of value and utility to your home.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

The Wilna, NY homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.