Top-rated basement remodelers.

Get matched with top basement remodelers in Rodman, NY

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Rodman, NY?

Select your specific project to find the pro for you.

Find Basement remodelers in Rodman

Avatar for ET Construction
ET Construction
5.0(
4
)
Basement - Remodel

Serving Rodman, NY and surrounding areas

Approved

In business since 2025

Free estimates

Emergency services offered

"ET construction worked on our cottage this summer. ET replaced our old ceilings with knotty pine panels and upgraded our lights to ceiling fans. Also added more outlets. Also replaced outside siding. They were great to work with and efficient. I would recommend them. It’s hard to find someone that you can trust."
3 duplicate remodel
3 duplicate remodel
3 duplicate remodel
3 duplicate remodel
3 duplicate remodel

+107

Avatar for Travani Construction, LLC
Travani Construction, LLC
4.0(
5
)
Basement - Remodel

Serving Rodman, NY and surrounding areas

Approved

In business since 2020

Free estimates

Emergency services offered

"We were pleased with our bathroom renovation. We found Travani Construction to be reliable and personable to work with. The cost was reasonable. I have recommended their work to several friends."
Response time2 days
9 neighbors recently requested a quote
Avatar for J.Garrison property maintenance
J.Garrison property maintenance
New to Angi
Basement - Remodel

Serving Rodman, NY and surrounding areas

Approved

Free estimates

Small jobs welcome

Credit card accepted

Here at J.Garrison property maintenance we specialize in landscaping and general property maintenance we take much pride in our work to ensure our customers high quality and reliability we specialize in lawn care, spring /fall clean up, tree trimming, mulch/topsoil, also retaining walls and small concrete jobs

Backyard restoration
Backyard restoration
Backyard restoration
Lawn care 2025
Lawn care 2025

+5

1 neighbors recently requested a quote
Dream Designs
New to Angi
Basement - Remodel

Serving Rodman, NY and surrounding areas

Approved

Free estimates

Emergency services offered

Warranties offered

My name is Rusty Wescott and after working 22 years building from the ground up, 22 years of dialing in my skills.But my other love is art I have always loved art, from my paintings, to wall murals, to home decor, and custom furniture. And Dream Designs new add-on is epoxy, tables,floors,countertops, stair treads and risers with a epoxy pour design, we pride our self on customers satisfaction, and if you can dream it up we can design and build it for you to make your dreams reality.

Demo
Sabrinas remodel
Sabrinas remodel
Demo
Sabrinas remodel

+17

19 neighbors recently requested a quote
...
Showing 1-10 of 63
Basement Remodel questions, answered by experts

Envision the type of bar experience you'd like to create for your guests. For example:

  • Does your basement have enough finished space for bar stools or seating?

  • What type of additional lighting would set the tone for the room?

  • Are there basement windows or an HVAC system?

  • Do you need new plumbing in your basement for a proper wet bar?

  • Could you be happy with a built-in wall cabinet bar rather than a full-scale wet bar?

Walkout basements are not generally included in a home’s square footage, although they may be if they meet certain conditions that depend on local regulations. A finished walkout basement used as a living space may be counted toward square footage in some locations as long as all codes for livable space are met.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Professional remodelers streamline the process, manage permits, and handle renovations efficiently—significantly mitigating risk while maintaining standards.

Roughing in and connecting utilities are the hardest parts of finishing a basement, and they’re the parts we typically don’t recommend doing as a DIY project. Unfortunately, your finishing timeline can be extended by weeks while you wait for contractors and inspectors to install electrical wiring, plumbing lines, and heating/cooling equipment and carry out inspections.

The Rodman, NY homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.