Top-rated subcontractors.

Get matched with top subcontractors in Yerington, NV

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Yerington, NV?

Select your specific project to find the pro for you.

TRUSTED BY YERINGTON, NV HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon33
    Verified subcontracting services reviews

Find Subcontractors in Yerington

Avatar for Jill Seidner Interior Design
Jill Seidner Interior Design
3.5(
89
)
Major Home Repairs (General Contractor)

Serving Yerington, NV and surrounding areas

In business since 2006

Credit card accepted

"Once I sent her all the measurements, it took her a little while to get the options back to me.  Overall, they're good designs.  However, they're very simplistic and give general ideas for space planning.  I was hoping to have a better idea for sizes of furniture for the space and some variations on staging.  
Jill was very responsive when I did have a question.  I'm not sure how helpful it is to have a virtual design done.  If we lived in similar cities, I'd probably use her again for help with additional designs.
"
Recommended by55%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Major Home Repairs (General Contractor)

Serving Yerington, NV and surrounding areas

In business since 2006

Credit card accepted

"I never contacted the provider or used this service in anyway. I have to
write this review so that the request to write this review stops
popping up.
The rating is bogus as it is required to be able to submit.
"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for H&K Home Services
H&K Home Services
4.4(
7
)
Major Home Repairs (General Contractor)

Serving Yerington, NV and surrounding areas

In business since 2023

Free estimates

Emergency services offered

"Kyle did an excellent job. I have had a leak for the past two years several others have tried to fix but were unsuccessful. He was able to take care of the issue the first time. He is an honest, hardworking man."
Handymen Project
Handymen Project
Handymen Project
Handymen Project
Handymen Project

+12

Recommended by85%of homeowners
Richard D Wood Landscape Architect
5.0(
3
)
Major Home Repairs (General Contractor)

Serving Yerington, NV and surrounding areas

In business since 1961

Free estimates

"Richard Wood came highly recommended for our landscape renovation in Juniper Trails, Caughlin Ranch. As a licensed landscape architect and architect, he brings great insight and value to landscape, hardscape and architectural details. After visiting several of Richard s projects, we knew that his sensibilities and vision aligned with ours. He is a naturalist with an eye to flow and subtle beauty. His collaborative style made this a great project."
Recommended by100%of homeowners
Showing 1-10 of 15
Subcontractors questions, answered by experts

It usually takes around four to six months to build and install a modular home, although your timeline could go up to around eight months if there are delays in the manufacturing or permitting process. Heavy site preparation and foundation pouring can extend that timeline if you need them, as can customizations you want for your modular home. Your modular home company should be able to provide an estimate for the construction timeline before you sign any contracts or agree to any work.

While concrete walls do not need to "breathe" in the traditional sense of the word, they do require waterproofing and dehumidifying methods, particularly in basements below the water table. Concrete both contains moisture from its initial installation and can absorb water when exposed. Ensuring proper basement ventilation , installing a vapor barrier, and controlling water exposure are all important tasks.

Yes, pros can offer guidance to achieve desired aesthetics and match existing decor.

While it’s never too early to start planning for a major home improvement project like a home addition, give yourself at least a month or two to plan and design your addition, find a contractor, and get the permits in order. For larger projects like a second-story addition that require designing with an architect, plan on three to four months of preparation.

Yes, designing builds to fit space constraints and meet functional needs.

The Yerington, NV homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.