Top-rated subcontractors.

Get matched with top subcontractors in Wellington, NV

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Wellington, NV?

Select your specific project to find the pro for you.

TRUSTED BY WELLINGTON, NV HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon33
    Verified subcontracting services reviews

Find Subcontractors in Wellington

Avatar for Pinuelas Construction LLC
Pinuelas Construction LLC
3.8(
17
)
Major Home Repairs (General Contractor)

Serving Wellington, NV and surrounding areas

Approved

In business since 2009

Free estimates

Warranties offered

"Ricky and his team were absolutely fantastic. I was extremely happy with the work done very professional and good quality work if there was a problem or question or concern, Ricky addressed it right away and his team took care of it. I would definitely hire them again to do another project around our home in Lake Tahoe, thank you Ricky and please thank your team"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+19

Response rate100%
14 neighbors recently requested a quote
Recommended by66%of homeowners
Avatar for Reno Renovators
Reno Renovators
4.0(
99
)
Major Home Repairs (General Contractor)

Serving Wellington, NV and surrounding areas

In business since 2004

Credit card accepted

"The entire project went very well.  I highly recommend their services.  They responded quickly to my emergency call and questions.  The office girls were extremely friendly and helpful as well as the workers in my home.  Everyone, including the sub contractors were polite and professional. The whole process of restoring my home was much easier and quicker than I expected.
"
Additional Photos
Additional Photos
Additional Photos
Recommended by85%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Major Home Repairs (General Contractor)

Serving Wellington, NV and surrounding areas

In business since 2006

Credit card accepted

"The man I talked to was very professional and timely. However, he explained that this particular job was beyond the scope of what their company does. I would certainly use them on another 'issue'.
"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Reno Patio & Fireplaces
3.7(
14
)
Major Home Repairs (General Contractor)

Serving Wellington, NV and surrounding areas

In business since 2003

Free estimates

Credit card accepted

"Sales rep. came to our home, measured an gave a written quote on the same day....no waiting.  Not only was the installation on time but they were actually 2 weeks early.  They took care of everything from homeowners assoc. approval to building permits.  We are  super impressed with the finished product,  the company work ethic and customer service.
Spoke with 2 other companies whose quotes were double what we paid......really happy with this product!
"
Additional Photos
Additional Photos
Additional Photos
Recommended by70%of homeowners
Showing 1-10 of 22
Subcontractors questions, answered by experts

Framing is often the most expensive phase of building a house because it’s time-consuming and requires a lot of materials. It costs between $20,000 and $50,000 on average, depending on materials and labor costs. Before construction begins, it’s possible that purchasing land is the priciest step in the process. Some plots of land sell for $3,000, while others cost upwards of $150,000.

Stone, marble, and brick are common building materials of Neoclassical architecture, though you will also find wood flooring and a range of natural stone tiles. Since several home styles fall under Neoclassical architects' umbrella, a range of building materials—including traditional wood framing—will make an appearance.

In-law suite floor plans almost always include at least one bedroom, a bathroom, and a combination kitchen/living room area or separate spaces for the kitchen and living room. Larger in-law suites built in accessory dwelling units separate from your main structure can feature multiple bedrooms, dining rooms, and entertainment rooms in addition to the necessities.

It usually takes around four to six months to build and install a modular home, although your timeline could go up to around eight months if there are delays in the manufacturing or permitting process. Heavy site preparation and foundation pouring can extend that timeline if you need them, as can customizations you want for your modular home. Your modular home company should be able to provide an estimate for the construction timeline before you sign any contracts or agree to any work.

The best way to start designing a house is to know what you want before designing. Making a list of your biggest priorities in a home will help. Designing a house without an idea of what you need or want in a home will lead to many trials and errors that could make it harder to figure out what you need in your design.

The Wellington, NV homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.