Top-rated concrete driveway pros.

Get matched with top concrete driveway pros in Mcgill, NV

Enter your ZIP and get matched with up to 5 pros

Need a pro for your concrete driveway service project in Mcgill, NV?

Select your specific project to find the pro for you.

Find Concrete driveway pros in Mcgill


J-N-R Construction LLC

Po Box 1946
No reviews yet

J-N-R Construction LLC

Po Box 1946
No reviews yet
15 years of experience

We are a small family business, we strongly believe in helping out our community anyway we are able. We offer senior discounts and free local estimates, call to inquire on estimates. We will try to always work with our customers. Our work is guaranteed.

We are a small family business, we strongly believe in helping out our community anyway we are able. We offer senior discounts and free local estimates, call to inquire on estimates. We will try to always work with our customers. Our work is guaranteed.



Floor Seasons Inc

7100 Grand Montecito Pkwy
4.29(
7
)

Floor Seasons Inc

7100 Grand Montecito Pkwy
4.29(
7
)
Customers say: Quality work
24 years of experience

Floor Seasons concrete staining and artistic design was incorporated in May of 2002 and granted the first specialized concrete staining contractors license in Nevada in November of 2002.

Floor Seasons concrete staining and artistic design was incorporated in May of 2002 and granted the first specialized concrete staining contractors license in Nevada in November of 2002.


Avatar for Warmzone

Warmzone

12637 S 265 W Suite 100
4.00(
3
)

Warmzone

12637 S 265 W Suite 100
4.00(
3
)
Customers say: Quick response
22 years of experience

WARMZONE is a national company designs and sells radiant snow removal systems for heated driveways and walkways, radiant floor heating and roof deicing. We have a trained staff of professionals that will learn about your project requirements and perscribe the best solution possible to heat your driveway or home. We have a network of subcontractors across the United States. Our consultations and designs are free and we have one of the largest selection of proven products to choose from. Call or email us to receive a free quote.

"They were absolutely wonderful. Will sure recommend them"

Jorge D on April 2018

WARMZONE is a national company designs and sells radiant snow removal systems for heated driveways and walkways, radiant floor heating and roof deicing. We have a trained staff of professionals that will learn about your project requirements and perscribe the best solution possible to heat your driveway or home. We have a network of subcontractors across the United States. Our consultations and designs are free and we have one of the largest selection of proven products to choose from. Call or email us to receive a free quote.

"They were absolutely wonderful. Will sure recommend them"

Jorge D on April 2018

Concrete Driveways questions, answered by experts

When hiring a concrete contractor, you should seek someone with proven experience, proper licensing, and insurance. You should also check reviews online, talk to references, and view past project photos. Remember that reliable contractors communicate openly and have an expert understanding of local building codes. You’ll also want to ensure that the contractor specializes in the specific type of concrete work you want, whether a driveway or tinted concrete flooring.

Usually 2-3 days, plus additional curing time before full use.

Building a concrete driveway normally takes between one and three days, including the time to cure the concrete. Wait at least seven days before driving on your driveway and two days before walking on it. Your contractor may require additional time if you need to level the ground, install a drainage system, or order special concrete materials. Installing a driveway also often requires a permit, so be sure to include this wait into your prep time as well.

Concrete should be at least 4 inches thick for steps. This thickness boosts stability and prevents cracking and deterioration. After you’ve built your forms out of wood, fill the void with a sand or gravel base for concrete. Use an all-purpose concrete mix to form your steps. After pouring your concrete steps, be sure to screed and float the concrete. 

Yes, concrete can set in rain, but it’s best if you pour concrete 4 to 8 hours before any rain to ensure it won’t impact its strength and appearance. Exposure to heavy rain during the early stages (the first 48 hours after pouring) can significantly reduce the structural integrity of the concrete. Over time, cracking is more likely due to softer concrete. 

The Mcgill, NV homeowners’ guide to concrete driveway services

From average costs to expert advice, get all the answers you need to get your job done.