Top-rated excavation pros.

Get matched with top excavation pros in Boulder City, NV

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Boulder City, NV?

Select your specific project to find the pro for you.

Find Excavation pros in Boulder City

Avatar for Sand Stone Contractors
Sand Stone Contractors
3.9(
7
)
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping+2 more

Serving Boulder City, NV and surrounding areas

In business since 2019

Free estimates

Emergency services offered

"Tyler let me know when he was coming to my house. We looked at how I would like the drip system placed and he offered some great suggestions. He came back the next week and worked for three whole days! He did a wonderful job and even gave me a discount, although he should have taken the whole amount. I would highly recommend Tyler Waite. He is friendly, courteous, dependable, and very thorough! I am completely satisfied with his work!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+37

Recommended by83%of homeowners
Showing 1-10 of 21
Excavating questions, answered by experts

Because decomposed granite is a durable material, a crushed rock or gravel base is optional as long as the DG is properly installed and compacted. However, installing a base is a good idea because it will ensure proper drainage and stability and act as a weed suppressant (although you may still occasionally have to pull weeds). Installing an adequate base can also increase the durability of driveways and walkways. If you forego the paver base or gravel underneath, line the area with landscaping fabric to avoid weeds.

The digging depth will depend on the size of the trencher you use. Even smaller units can dig up to 4 feet deep, which is plenty for a DIY job. However, much larger trenchers can reach a depth of 18 feet and are better used by a team of pro contractors, not a single DIYer. As with all home improvement projects, use the right tool for the job and proceed with caution.

Hardscaping often requires preparation of the ground in the area where the feature is being installed. This can include digging, compacting, and leveling the soil, ensuring adequate drainage, and removing any existing plants. The extent of preparation needed will depend on the type and size of the hardscaping feature being installed.

The time it takes to build a pool—and dig out the area—varies based on the pool size and type. A professional excavator will take between four and eight hours to dig a pool. The process will take longer if they encounter large boulders or tree roots. Keep in mind that this is a small part of the process in the long run. You will need between eight and 12 weeks to build a pool from start to finish, including the time to apply for permits.

A joint utility trench, or joint trench, is a long, buried ditch on a property that contains two or more utility lines rather than running the lines in multiple trenches. Some utilities, like gas and electric or electric and communication lines, are better suited to joint trenching, while others, like water and sewer, are not allowed to be in the same trench.

The Boulder City, NV homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.