Top-rated excavation pros.

Best excavation pros near Boulder City, NV

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Boulder City, NV?

Select your specific project to find the pro for you.

Top-Rated Excavation pros in Boulder City - Updated Nov 2026

Avatar for Sand Stone Contractors
Sand Stone Contractors
3.9(
7
)
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping+2 more

Serving Boulder City, NV and surrounding areas

In business since 2019

Free estimates

Emergency services offered

"Tyler let me know when he was coming to my house. We looked at how I would like the drip system placed and he offered some great suggestions. He came back the next week and worked for three whole days! He did a wonderful job and even gave me a discount, although he should have taken the whole amount. I would highly recommend Tyler Waite. He is friendly, courteous, dependable, and very thorough! I am completely satisfied with his work!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+37

Recommended by83%of homeowners
Showing 1-10 of 21
Excavating FAQs, answered by experts

The average cost for pool excavation is $2,500. This cost can range from $450 to $4,500, depending on the pool shape and size, time of year, and any need to move buried utilities. 

When excavating for your pool, you might have to move existing utilities. You can expect to pay an additional $15 to $25 per linear foot to move gas lines. To move a septic system, it’ll cost an additional $2,000 to $20,000. A pool that is 10 feet by 12 feet averages $450 to excavate, and a 20-foot-by-40-foot pool averages $3,020.

A perc test can take anywhere from one to eight hours to complete. The total time depends on factors like the amount of excavation required, the depth and width of the holes, and whether multiple test holes are needed. For a single hole, the process of filling it with water and monitoring the drainage rate usually takes less than an hour. Professionals can often complete the entire test in a single day. While it's possible to get results the same day, some companies may take a few days to provide the official report.

Hard soil could be a sign of overly dry dirt, either from poor drainage or drought. It's important to test the nutrient levels, density, and drainage capacity of your soil to see if it's absorbing water properly. Begin by adding a light layer of water and observing how long the soil retains moisture. If you experience a good deal of runoff, you may need to aerate your lawn, apply a wetting agent, or hire a professional for a closer look.

There are many ways to cut through roots when digging, especially if your trencher doesn’t seem to be removing the roots. First, use a shovel to expose the roots. Then, use gardening shears to clear out smaller roots or a reciprocating saw to remove larger plant roots. If you plan on keeping the plant, avoid cutting any roots over 2 inches thick.

Excavations take a few days or up to a few weeks. The time it takes to excavate an area depends on the size of the area, the type of soil, the type of excavator, and even the time of year, since winter can make digging up the ground more difficult.

The Boulder City, NV homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.