Top-rated epoxy flooring pros.

Get matched with top epoxy flooring pros in Midway, NM

Enter your zip and get matched with up to 5 pros

Need a pro for your epoxy flooring service project in Midway, NM?

Select your specific project to find the pro for you.

Find Epoxy flooring pros in Midway

Avatar for Mammoth Coatings
Mammoth Coatings
4.2(
5
)
Concrete Floor Coating-Apply - For Business

Serving Midway, NM and surrounding areas

In business since 2018

Free estimates

Credit card accepted

"I hired this company to resurface my 3 car garage. I was shocked to find I could have a glossy design for my budget... instead of just having my concrete fixed up. Thank you Mammoth!"
Einstein Bros Bagels
Chips
Garage Floor with Chips
Chips
Joint Fill

+6

Response time2 days
Response rate89%
Recommended by100%of homeowners
Proximity Bound Floors
1.5(
1
)
Concrete Floor Coating-ApplyConcrete Floor Coating-Apply - For Business

Serving Midway, NM and surrounding areas

In business since 2015

Free estimates

Our happy and satisfied customers recommend us to their friends and family all the time. We are proud of our reputation and we feel it has been well earned. We are also happy that we can help you feel good knowing that you are working with a reputable company that stands behind its products and services.\n\n\n

Response time2 days
Showing 1-10 of 20
Epoxy Flooring questions, answered by experts

How do I epoxy a garage floor?

To epoxy a garage floor, you need to measure the area of the floor, remove all items from the garage, thoroughly clean the floor, and then follow the manufacturer’s instructions to mix and apply the epoxy. Learning how to epoxy a garage floor can save you between $4 and $7 per square foot on labor.

Factors like the time of day you choose to seal the concrete, temperature, humidity, and airflow will impact drying time. To shorten the drying time, seal concrete in the late afternoon on a day with a temperature between 45 to 85 degrees Fahrenheit.

Mix the resurfacer into a sticky mixture. The consistency should look like mashed potatoes. Use a squeegee to push the resurfacer across the pitted area and smoothen the surface with a cement trowel flush. Make sure you protect any expansion joints with a weather strip. Alternatively, cut out any resurfacer that touched the joint once the mixture begins to harden.

Costs depend on coating type, labor, site preparation, and required finishes.

Self-leveling compound usually requires up to 24 hours to dry before you can begin installing tile. It’s best to follow the instructions on the self-leveling product label for appropriate dry time. If you’re still not sure, play it safe and give the self-leveling compound two days to dry before you begin the tiling process.

The Midway, NM homeowners’ guide to epoxy flooring services

From average costs to expert advice, get all the answers you need to get your job done.