Top-rated epoxy flooring pros.

Get matched with top epoxy flooring pros in Artesia, NM

Enter your zip and get matched with up to 5 pros

Need a pro for your epoxy flooring service project in Artesia, NM?

Select your specific project to find the pro for you.

Find Epoxy flooring pros in Artesia

D & R Services
4.6(
47
)

Serving Artesia, NM and surrounding areas

In business since 2010

Free estimates

Emergency services offered

"
  • The service was great! 
  •  Ramon Acosta showed up on time for the appointment to lay out the the floor plan and had his men there at the house ready to work within 2 days. We wanted special made cabinets for the bathroom and Ramon brought us a cabinet designer to our home to work out the details! The workers were punctual and cleaned up their mess after each day of work. The remodel was finished on schedule. I plan on remodeling the kitchen and I will be calling D & R Services for that project as well!
"
Additional Photos
stamped concrete and curb
stamped concrete and curb
stamped concrete and curb
tile

+107

Recommended by82%of homeowners
Avatar for Mammoth Coatings
Mammoth Coatings
4.2(
5
)

Serving Artesia, NM and surrounding areas

In business since 2018

Free estimates

Credit card accepted

"I hired this company to resurface my 3 car garage. I was shocked to find I could have a glossy design for my budget... instead of just having my concrete fixed up. Thank you Mammoth!"
Einstein Bros Bagels
Chips
Garage Floor with Chips
Chips
Joint Fill

+6

Response time2 days
Response rate89%
Recommended by100%of homeowners
Showing 1-10 of 24
Epoxy Flooring questions, answered by experts

The prevention steps are essentially the same, no matter the patio material. Keep the surface clean and maintained. Ensure there's no debris buildup, and cover the whole thing in a quality sealant. If it's the start of a season or it's been a while since you've cleaned the area, use a pressure washer.

If your concrete stains are green in color, it indicates the presence of mold or algae—which you should address right away. If left unattended, mold will spread to other areas throughout the home. However, be careful not to disturb mold on indoor concrete surfaces and work with a local mold remediation specialist for specialized care. Once free from mold and algae, seal your concrete to eliminate pores and gaps.

Most coatings take 1-3 days, including surface preparation and drying time.

Apply two coats of paint to a garage floor after priming for optimal results. The first coat serves as a base layer, providing adhesion and coverage. Allow the first coat to dry thoroughly before applying the second coat, typically after 12 to 24 hours. The second coat ensures even coverage and durability and enhances the floor's appearance. Additionally, applying two coats helps to create a more substantial barrier against stains, chemicals, and wear and tear, resulting in a longer-lasting finish. 

Flooring professionals can typically apply epoxy within one or two days, depending on how much preparation or repair the old floor needs before application. However, you’ll need to wait after the application is complete to use the flooring. While you can walk on the epoxy flooring before it fully cures, it can take up to 72 hours for the epoxy floor to fully dry and be ready for full use.

The Artesia, NM homeowners’ guide to epoxy flooring services

From average costs to expert advice, get all the answers you need to get your job done.