Top-rated home builders.

Best home builders near Dunn, NC

Enter your zip and get matched with up to 5 pros

Need a pro for your home building project in Dunn, NC?

Select your specific project to find the pro for you.

Top-Rated Home builders in Dunn - Updated Nov 2026

Avatar for ooommee llc
ooommee llc
4.9(
62
)
Shelter or Outbuilding - Build

Serving Dunn, NC and surrounding areas

Approved

Super Service Award Winner

In business since 2007

Warranties offered

Credit card accepted

"I originally hired Danzy to rebuild brickwork on my front entrance. I ultimately used him for multiple indoor and outdoor projects, INCLUDING overseeing other contractors who just were not as thorough or professional as he was. This guy can do anything!! My house is over 100 yrs old, and he has plenty of experience with older homes. Hire him first as your Project Manager, and he will get the work done!"
Bunnlevel, NC Deck Restoration
Sanford, NC Deck Refurbish
Rocky Mount, NC Trex Deck Refresh
sunroom
Bunnlevel, NC Deck Restoration

+326

Response time2 days
Response rate100%
1 neighbors recently requested a quote
Avatar for Odyssey Contracting
Odyssey Contracting
4.7(
66
)
Shelter or Outbuilding - Build

Serving Dunn, NC and surrounding areas

Approved

In business since 2015

Free estimates

Emergency services offered

"Highly recommend these guys! Really pleased with the end result of the work we had done. I greatly appreciate the GM Sean fielding my endless stream of questions; as a new home owner this whole process has been new for me so his willingness to help made the process so much easier. Joe and Jesus were the two guys assigned to the project, was very pleased with their work. They took their time and made sure everything was done right. A little delayed on day one, but other than that everything went smoothly."
Roof Replacement
Water Mitigation Project
Roof Replacement
Finished New Deck Installation
Roof Replacement

+203

Response time1 day
Recommended by88%of homeowners
Avatar for Clean Hands Painting & Construction LLC
Clean Hands Painting & Construction LLC
4.8(
418
)
Find a Custom Home BuilderFind a Modular Home Builder

Serving Dunn, NC and surrounding areas

In business since 2007

Free estimates

Emergency services offered

"Junior and his team are simply SPECTACULAR. They are professional, honest, prompt, and thorough, and whether you need interior painting, exterior painting, drywall repair, or staining, the quality of their work is far superior to the competition. Junior is a perfectionist who takes great pride in his work, and his work is flawless. He takes the time to do things right. If you have an older house like ours with cracks and sags in the ceilings and walls, he will leave it looking brand new without a single imperfection and with an absolutely smooth surface of paint. He takes extra special care to ensure that there is never a drop of paint where it should not be, and even if the job has required extensive sanding when he is finished your house will be cleaner than when he started. Junior costs more than the competition, but he is well worth it. We learned this the hard way. We initially went with a cheaper painting company (which, by the way, was highly rated). Boy, was this a BIG MISTAKE! The painters did such a poor job mudding our ceilings that they looked as full of imperfections as before; the paint had that horrible popcorn effect; they got paint all over our stained oak interior trim, and they left the interior of the house coated in a layer of dust from paint and plaster. We called in Junior to fix this mess. All we can say is, "Thank God for Junior!" Do yourself a favor. If you care about your beautiful house, or if you want your house to be beautiful, call Junior and Clean Hands Painting now. ***UPDATE*** I recently (11/27/2019) wrote a stellar review of Junior’s professional, honest, prompt, thorough, and highest quality interior painting, exterior painting, drywall repair, and staining. I would like to add to what I said there by describing the quality of his work on a recent job that involved renovating our oak staircase. The sanding involved the use of both a small electrical sander and hand sanding to ensure that every area of the steps – the tread, riser, newel post, inner and outer string, balusters, and fascia – was completely and evenly sanded. He repaired damage to the wood in various areas of the steps making them look new. We decided to have the treads stained red mahogany and the strings, risers, fascia, and balusters painted black. As usual, Junior used extreme care, including taping all areas that needed to be protected when painting the railing and risers so that the newly stained treads did not get paint on them. The combined effect of the staining and painting was spectacular. The stained treads look rich, even-colored, and like new. The oil-based black paint that was expertly applied to all of the other areas of the stairs highlights the beautiful wood grain. Junior did not leave a single paint drop anywhere, and the lines that divide, for example, the treads and risers, are razor sharp. In sum, if you have oak stairs (or any kind of stairs) that you value and want expertly and beautifully refinished, stained, and/or painted, Junior is your man. I would not trust my stairs to anyone else."
Interior Painting
After
During
.
Additional Photos

+17

Recommended by96%of homeowners
Avatar for Design Home Renovations (DHR)
Design Home Renovations (DHR)
4.8(
10
)
Find a Custom Home BuilderFind a Modular Home Builder

Serving Dunn, NC and surrounding areas

In business since 1996

Credit card accepted

"

I met Dana out at the Fairgrounds and asked her about laying a carpet in my bonus room and Bruce wood up my stairs and hallway.  She was very informative and said she would be happy to come to my home for an estimate. I had a couple other estimates under way as well. I have to say that I went back and forth with Dana and other carpet installers because I wanted something nice in my home but did not want to invest a lot of money. I don't plan on staying in this house forever and with selling in mind, I don't want upgrades that I won't get back in return. Dana was super friendly and listened to my requests and helped me pinpoint the exact flooring that suited my needs. I ended up choosing a very nice Berber carpet for my stairs, hallway and bonus room. We removed the carpets ourselves because my husband took down popcorn ceilings in the hallways and bonus room. Dana was very agreeable to waiting for this to complete this work before we had the carpets laid. My installation went very well if you compare my experience with previous contractor experiences (I don't have the best luck when it comes to work being done on my house). The install was delayed by one day; due to the carpet not arriving on time. The next day the installer was supposed to be at my house by 0900 but did not arrive until about 1100. The installer explained that the carpet was delivered to the wrong warehouse and he had spent much of the morning tracking it down. However once he started installing you could tell he knew what he was doing and the job went very quickly. He, alone, installed the carpet within 3-4 hours. I was extremely impressed. He did it systematically with very little mess. The padding was awesome and the finished product was exactly what I wanted. The color is perfect (which Dana helped me pick out) and it was all done so professionally. My kitchen is next and will definitely look to Design Home Renovations for what they can do for me in my kitchen.


"
Recommended by90%of homeowners
Avatar for UBuildIt Raleigh
UBuildIt Raleigh
5.0(
5
)
Find a Custom Home BuilderFind a Modular Home BuilderShelter or Outbuilding - Build

Serving Dunn, NC and surrounding areas

"Duane was the general contractor for my new construction home in Michigan before he moved to North Carolina to start his UBuildIt business. He was very involved making sure everything was just perfect. Easy to contact. On site frequently. You will not be disappointed using this company for any of your building needs."
Additional Photos
Recommended by100%of homeowners
Avatar for Divine Design & Remodeling
Divine Design & Remodeling
4.7(
18
)
Shelter or Outbuilding - Build

Serving Dunn, NC and surrounding areas

In business since 2001

Free estimates

Credit card accepted

"Things we liked: 1. Detailed contracting and pre-work planning, with detailed materials and labor estimates. 2. Provided evidence of license and insurance. 3. Excellent design, excellent materials, and precise construction of high-quality custom cabinetry and other wood work, including under-cabinet LED lighting, and fireplace mantle. 4. Negotiated with vendor to get good price and extended warranties included in the cost of all new kitchen appliances. 5. Nice installation of tile floors in kitchen, bathroom, and laundry room. 6. Excellent installation of stacked limestone panels floor to ceiling on a high angled wall around the fireplace, plus very attractive custom-made wood mantle, and new tiles on the hearth. 7. Worked effectively with vendor on design, purchase, and installation of premium granite countertops and trim, and kitchen and bathroom sinks. 8. Installation of premium plumbing fixtures in bathrooms and kitchen, no leaks apparent. 9. Well-done side job of installing two new steps, small landing, and wood screen door with dog flap on the deck. 10. Very cooperative about several minor design and installation changes along the way, with acceptable cost changes. 11. Contractor was on-site nearly every weekday and on many weekends. 12. Contractor is friendly, polite, considerate, and very aware he is working in someone’s home. Things that disappointed us: 1. No advance communication on one-week delay in starting the job. 2. Time estimates. We were told at least 3 weeks in a row that he would be done “next week.” Job actually took twice as long (about 15 weeks) as the original time estimate (6-8 weeks). We can allow one extra week for the changes and add-ons we asked for, but not double for the entire job. 3. Erratic attendance of assistants on the job appeared to contribute to significant delays. 4. Delegated cabinet finishing (staining and water-repellent top coats) to assistant, whose work had to be re-done in multiple places and still detracts from otherwise beautiful wood work. 5. Trim work is absent where cabinet panels meet hardwood floor, leaves what we consider a very unattractive gap. 6. Installation of wall tiles. The tile vendor did not tell us the tiles we picked for floors and shower walls were not for walls; the contractor had a hard time making them stay on the walls. I suggested changing wall tiles but contractor assured us that he could cut and install to get the look we wanted; tiles had to be cut, installed, torn off, and re-installed; were held onto concrete backer board with nails until cement dried, putting holes in the backer board behind the grout lines; tiles cut at angle for exposed corners were ragged and retained grout unevenly, and there was no accommodation for corners, so after the job was done we ordered and installed plastic corner guards with silicone (total cost of materials and shipping approx. $125) to cover unattractive and sharp tile edges. I estimate that installation of shower wall tiles alone took 2 weeks, maybe more. For the kitchen backsplash, smaller tiles were used and installed well, but there was no accommodation for where backsplash would transition to drywall, so tiles at drywall had edges exposed; we ordered edge pieces off-contract from a home improvement store, contractor installed them. It appeared to us that the contractor did not plan for tile corners and transitions. 8. Drywall and paint work. Drywall around arch that widened a doorway was not taped, and contraction of the mud has created a crack around the arch. Drywall work where lights and ceiling fans were moved and/or installed is lumpy and visible; one place on the ceiling was not finished and the supporting mesh is obvious right on the surface. Paint where the ceiling paint meets the shower wall tile grout is on the grout and cannot be scrubbed off and in our opinion will need to be covered by crown molding to make appearance acceptable to us, something we did not plan. Other places where wall tile meets drywall show evidence of damage to the drywall surface (e.g., surface paper torn off) that was not repaired, so it is uneven and lumpy. Bathroom was to be repainted, but not all trim was repainted, including a window that was caulked with colored caulk on white paint. The wall with the arch and the kitchen walls involved in wall cabinet installation were only partially repainted with the same color but different roller texture can be seen; the whole walls must be re-painted for uniform appearance. 9. Organization and worksite management. Our homeowner association informed us that neighbors grew impatient with the construction trailer and trash in the driveway, which were present from mid-November to early March. In general, we were unhappy with protection of the work site. Garage floor and wood steps have sizeable spots of paint and stain. Hardwood floors in the highest-traffic area were protected with cardboard only after we insisted on it, and then there were still paint cans and tools stored directly on the dining room hardwood floor. Stain cans were routinely left uncovered overnight. New tile floors and granite countertops were not protected from subsequent cabinet staining, so we did a lot of post-construction removal of paint, stain, glue, etc., from tiles and expensive granite that could have been protected, even with newspaper and masking tape. Grout haze was left on new tile for at least a week and then was incompletely removed; we spent several days scrubbing it off with white vinegar. Two manuals for new appliances were lost. Job proceeded in a sequence that was hard for us to understand or predict, perhaps depending on when assistants were available (a guess?), so there was little completed and usable across three rooms for more than three months. 10. Contract oversight/business management. Extended warranties for kitchen appliances (refrigerator, gas range, microwave oven, dishwasher) were supposed to be part of the package cost but the invoice the contractor presented to us did not include extended warranties on two of the four; I contacted the vendor, purchased the two warranties by credit card, and backed this cost out of the contract. Contractor deviated from the contract’s payment schedule, asking for unscheduled early payments to cover labor costs. Contract called for all invoices for materials to be presented; most were not. We presented an extensive punch list toward the end of the job, which we added to as we found things that needed to be corrected. We found at least one or two items that he crossed off but were not done. 11. Complete lack of follow up. This is a serious problem to us, given our financial and time investment. Before and during the job, we communicated well by text message and email. Since he finished on March 2, I have contacted him 5 times to request a time we could meet and talk about issues described here; he responded quickly to the first two messages saying he would get back to me, but didn’t, and he has not responded at all to the last three attempts to contact him since April 8. The contract has an arbitration requirement, but the contractor used his home address as his business address but moved during the job, and we do not have a mailing address for him, so we are unsure how to invoke arbitration. I contacted a handyman service on Angie’s List to get an estimate to correct several items described above; this estimate is $1,350 on top of the cost of the renovations in general. This review will stand until the contractor contacts me and corrects what we consider to be deficiencies. I will consider an update if he does. Overall grade: C. I would not use again."
Decks
Baths
Trim
Additional Photos
Additional Photos

+2

Recommended by84%of homeowners
...
Showing 1-10 of 84
Home Building FAQs, answered by experts

It is a good idea to check in with your local city and state regulations before committing to building a shipping container home no matter where you live. This concept is pretty new across the country, and many places won’t let you build one.

The International Code Council (ICC) offers guidelines for home builders on the safe use of ISO intermodal shipping containers repurposed as building components, which can be helpful to review when planning or designing a shipping container home.

Hiring a reliable home builder is an essential task, but there are a few questions you can ask a potential builder to ensure you they are trustworthy and up to the task:

  • How long do you expect the process to take?

  • Are you fully licensed and insured?

  • How much of the work will you subcontract?

  • Will you pull all of the necessary permits for the job?

  • How long is the builder’s warranty you include with your work?

  • How do you handle resolution for issues I might have with the finished product?

  • How much experience do you have?

Yes, a home builder or contractor should have the proper licensing and insurance. Licensing requirements vary by state and municipality, but most states mandate that a builder holds at least a general contractor’s license. For specialized work such as plumbing, electrical, roofing, or sewage systems, individual licenses may be required, in which case the builder may subcontract the work. You can use Angi’s state licensing tool to review your local guidelines and confirm a builder's credentials. As you browse professionals, you can also look for the “Angi Certified” badge. This indicates the business meets our certification standards, which include passing a criminal background check, holding applicable state and local licenses, and maintaining an average rating of 3.0 or better.

How long it takes to build a log cabin depends on a variety of factors, including its size and design, and whether or not you have to clear the land. Construction can take a few weeks for a prefab log cabin on an established site, but up to eight or nine months for a custom cabin on undeveloped land. In comparison, the timeline to build a house is typically four to 12 months.

Whether it’s more affordable to gut a house than build a new one depends on the markets where you'd be buying and selling. However, it’s usually less expensive to renovate a home than to build new construction. 

Most homeowners pay between $100,000 and $200,000 for demolition and remodeling costs, whereas the average cost to build a new home is between $139,000 and $531,300.

The Dunn, NC homeowners’ guide to home building services

From average costs to expert advice, get all the answers you need to get your job done.