Top-rated subcontractors.

Get matched with top subcontractors in Chadbourn, NC

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Chadbourn, NC?

Select your specific project to find the pro for you.

TRUSTED BY CHADBOURN, NC HOMEOWNERS

  • Average homeowner rating star icon4.4
    Average homeowner rating
  • Verified reviews icon79
    Verified subcontracting services reviews

Find Subcontractors in Chadbourn

Mighty Hands Roofing Inc
4.2(
461
)
Major Home Repairs (General Contractor)

Serving Chadbourn, NC and surrounding areas

In business since 1986

Free estimates

Emergency services offered

"After the repair was done I noticed a leak in my bathroom ceiling where one of the roof vents were replaced. I called the Subcontractor Brian on a Saturday morning. The weather was cold and raining. He was at my house within the hour up on the roof and fixed the leak. I havent had any leaks since. I would hire Brain the Subcontractor again."
Recommended by80%of homeowners
Avatar for Craftsman Direct Handyman Home Improvement
Craftsman Direct Handyman Home Improvement
4.1(
321
)
Major Home Repairs (General Contractor)

Serving Chadbourn, NC and surrounding areas

In business since 2002

Free estimates

Credit card accepted

"I contacted three different providers to give quotes on adding a 12'x16' deck extension to the existing deck. This would be about 1.5 feet off the ground and covering an existing concrete slab. Craftsman contacted me and scheduled Kevin H. to come out to perform the estimate and he did so on 08-Jun-2015. Kevin's demeanor was professional and he seemed knowledgeable and focused on providing what I wanted. We received the estimate from him 3 days later for $3300-$4000 labor and $750 materials. We were told at that time that scheduling was 1-2 weeks out. While Craftsman was the highest bid, we decided to go with them because they seemed knowledgeable and slightly more "polished" than the other potential contractors, and one of the important factors for us was that they could start work in 1-2 weeks as we were eager to get the deck finished so we could do some other projects around the deck. 
On 14-Jun-2015 we sent the email accepting the proposal and on 15-Jun-2015 Kevin confirmed receipt and stated Laura would send over the contract to sign and schedule us. He re-affirmed that we were 1-2 weeks out on the schedule. Later that day, I received a follow-up email from Kevin informing me that the engineering plan they would work from is my responsibility and provided me with the name of an engineer and told me I will pay the engineer directly. This was the first time that I was told I had to separately contract, schedule, and pay for additional services outside of the bid. I was told at this time we would hold off on the contract until the engineer came out and provided a more concrete plan so the contract could be more accurate. I was assured at that time that we would keep our place in schedule so we didn't go to the end of the line. We weren't happy with this development but moved forward. 
I contacted the engineer (which I am not sure that was needed for such a small deck project) and he agreed to come to the house and meet me on 16-Jun-2015. He arrived on time and gathered the information for the engineer plan. He indicated that the plan would be to me on 18-Jun-2015. When I didn't receive it by 22-Jun-2015 I contacted him and he said he was finishing it up and would send that day. I later that day received an invoice and was told that I couldn't have the sealed plan until I paid the invoice. I paid the $210 and on 23-Jun-2015 finally had an engineer plan which was shared with Kevin. 
Finally on 01-Jul-2015 I received a contract to sign. The contract included $3,358 in labor and an estimated materials of $850 (a minor increase of $100, but certainly acceptable as the first was done without the engineering plan). It is worth noting that one of the reasons I went with this highest bid was because of their scheduling estimates which were to begin work within 1-2 weeks. At this point we are at 2 weeks + 2 days.
Kevin confirmed some information and informed me that he would order materials and have them delivered to the house and that work would begin on Wednesday, 08-Jul-2015. I scheduled to be home from work that day. On Tuesday I was informed that they were running long on another job and wouldn't start until Thursday. On Wednesday I was informed that the materials couldn't be delivered until Friday, so work wouldn't begin until Monday, 13-Jul-2015. We are now beginning work 2 days shy of 4 weeks after accepting the bid, nearly double the time we were told when we chose them over the others.
On 13-Jul-2015, two sub-contractors arrived to begin work, Mike and Steve. They worked through the day and realized they needed a few more materials than were ordered. They came back and worked the next two days and we had the basic work complete. They had another job to do on Thursday, which was fine and then worked again on Friday and ordered more composite as there wasn't enough to complete. They worked again on Monday for a bit and then came back on Tuesday once additional trim was received. The composite was completed on Wednesday morning. 
At some point about half way through the work, I was informed that the materials were going to cost more than estimated. It wasn't a 20% overrun like I would expect. The materials were completely mis-estimated and instead of the $850 that was in the contract, materials were going to run over $2000. At first it was presented to me as though I misread the contract and that these costs were in there, just not spelled out as clearly as they should have been. When I stated this wasn't so and asked that I be shown where in the contract, it was acquiesced that Kevin had simply "messed up" in creating the initial estimate. He stated that this was only the second deck he had done an estimate for, which was a surprise given that during the bid process we were led to believe there was decades of experience going into this process. 
So, on 22-Jul-2015, we had a finished extension to our deck. The final bill was $5663.00, which included $2175 in materials vs. the $850 we agreed to when we signed the contract. We paid Kevin and the transaction was complete. It was another 5 days before the 'bagster' service picked up the bag on our lawn that had all the trash and scrap materials. An unfortunate note on this is that instead of putting this bag on the driveway, where there was ample space to do so, they put it on the grass. several weeks of that bag on grass ended up that my front yard now has a 5'x8' spot of "dead" in the middle of it. That was poor planning on the part of whomever decided that would be where that bag was placed (picture of the dead spot below as well).
I thing or two that I want to note on this review. I tried to give an honest account of how it went. It isn't an indictment of the people involved. Kevin was extremely nice and professional and he was apologetic for the errors in estimating the materials and the delays. Mike and Steve, the guys doing the actual work, were outstanding, professional and did a GREAT job on the deck. We couldn't be happier with the final product (pictures below).
"
Wood Rot
Tiered Deck
Basement finishing
Call The Boss
Recommended by91%of homeowners
Avatar for Mike's Painting & Pressure Washing
Mike's Painting & Pressure Washing
4.7(
28
)
Major Home Repairs (General Contractor)

Serving Chadbourn, NC and surrounding areas

In business since 1996

Emergency services offered

Credit card accepted

"I called Mike in the morning just hoping he would be able to come by and give me an estimate in a day or two. He said he would be working in my area and would call me that afternoon when he was clear. He called me back exactly when he said he would and arrived within 30 minutes. He gave me a quick estimate which was a fair price for the work to be done. It was late in the afternoon but he said he would do the job while he was there. He was very careful not to harm the siding on the house or my plants and flowers. He finished just before dark. It wasn't  until the next day that I could see what a good job he did. All the mold, mildew and dirt was gone and the house and decks looked great. I was very pleased with his work. Would definitely hire Mike again and would recommend him to my friends."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+161

Recommended by91%of homeowners
Avatar for Cortes Cleaning
Cortes Cleaning
5.0(
6
)
Major Home Repairs (General Contractor)

Serving Chadbourn, NC and surrounding areas

In business since 2022

Free estimates

Emergency services offered

"Great, showed up on time for estimate. Was priced fairly. Showed up on time and date as scheduled to do job..worked hard and steady I get job done in a timely manner. Very polite and professional appearance and easy to discuss parameters of job. The finish job looks almost new for a 20 year-old deck. Very appreciative of his work and would definitely hire again. Bruce wunner"
Painting - Interior Project
Pressure Washing Project
Pressure Washing Project
Painting - Interior Project
Pressure Washing Project

+18

Recommended by100%of homeowners
...
Showing 1-10 of 58
Subcontractors questions, answered by experts

While concrete walls do not need to "breathe" in the traditional sense of the word, they do require waterproofing and dehumidifying methods, particularly in basements below the water table. Concrete both contains moisture from its initial installation and can absorb water when exposed. Ensuring proper basement ventilation , installing a vapor barrier, and controlling water exposure are all important tasks.

Most towns and cities have regulations regarding sign dimensions for businesses. If you're opening a new business, contact the town or city's local zoning board to see the specifications you need to follow when getting your sign created. There may also be rules regarding how high your sign can sit. Be sure to learn about specifications before having your sign made. Sign companies generally won't offer refunds once custom signs have been fabricated.

While it’s never too early to start planning for a major home improvement project like a home addition, give yourself at least a month or two to plan and design your addition, find a contractor, and get the permits in order. For larger projects like a second-story addition that require designing with an architect, plan on three to four months of preparation.

British architect John Nash is credited with creating the Italianate style of architecture. The style was further popularized in the U.S. by landscape architect Andrew Jackson Downing and architect Calvert Vaux. The style spread across the U.S. due to Downing’s popular book on the style and the availability of plans and materials due to the mass production of the Industrial Revolution.

Yes, you can draw your own deck plans in many cases. However, you must know your local building codes and be familiar with carpentry principles. Even then, it's always best to run your plans by a professional contractor with experience building decks, whether you choose to DIY some of the build or not.

The Chadbourn, NC homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.