Top-rated generator install pros.

Get matched with top generator install pros in Laurel, MT

Enter your zip and get matched with up to 5 pros

Need a pro for your generator install project in Laurel, MT?

Select your specific project to find the pro for you.

Find Generator install pros in Laurel

Avatar for Treasure State Electrical Contracting, Inc.
Treasure State Electrical Contracting, Inc.
4.2(
60
)

Serving Laurel, MT and surrounding areas

Approved

In business since 1946

Free estimates

Emergency services offered

"Jeff, our installer was very knowledgeable and courteous. He showed up on time, paid attention to detail and to our project related requests. His work was excellent. We will definitely use Treasure State Electric for our future projects."
Recommended by100%of homeowners
Avatar for 2/Z ELECTRICAL LLC
2/Z ELECTRICAL LLC
5.0(
7
)

Serving Laurel, MT and surrounding areas

Approved

In business since 2025

Free estimates

Credit card accepted

"Excellent communication. Arrived late because of a parts availability issue. Worked well into the evening to finish the installation, which test ran perfectly. I would definitely recommend this contractor."
Response time3 days
Response rate100%
8 neighbors recently requested a quote
Town & Country Electric
4.9(
12
)

Serving Laurel, MT and surrounding areas

In business since 1995

Free estimates

Credit card accepted

With more than 45 years of experience, Town & Country Electric is dedicated to providing our customers with the best quality at a great price. We are here to build relationships with our customers and communities and to provide our employees with a great place to work. We look forward to working with you!\n

29 neighbors recently requested a quote
Recommended by50%of homeowners
Avatar for Lightning Electric
Lightning Electric
5.0(
2
)

Serving Laurel, MT and surrounding areas

In business since 2020

Free estimates

Emergency services offered

"Not only did he work on outlets and panels but he installed a portable generator that I can use if the electricity goes out. He is honest, caring, fast, and very reasonably priced. I would highly recommend hiring him for any project you might have need done."
Response time1 day
Response rate92%
Recommended by100%of homeowners
Showing 1-10 of 14
Generator Install questions, answered by experts

Generally, you’ll want to keep between 60 and 70 feet between the generator and the transfer switch. There are a few reasons for this, including:

  • The distance reduces the noise coming from the generator into your home.

  • It increases efficiency because you won’t have a voltage drop from this short of a distance.

  • Prevents carbon monoxide poisoning: keep at least 15 feet between your generator and an open window. 

Yes, natural gas generators can work without electricity. Natural gas generators are a common type of backup or whole-house generator that operates when the electrical grid isn’t working. The trick is using a transfer switch (which usually needs to be installed with the generator) that safely switches the home electrical system from the power grid to generator power when needed.

Whole-house generators can run continuously for extended periods, even for weeks at a time (around 400 to 500 hours), as long as they have a sufficient fuel supply. However, this type of extensive use will increase wear and tear and can shorten the generator's overall lifespan. During long periods of operation, it's important to check and refill the engine oil as needed, potentially as frequently as daily depending on the model. If your generator uses a fuel tank, ensure it is kept full to prevent unexpected shutdowns.

If you have a transfer switch properly installed, the generator and main electrical power cannot feed the system at the same time. However, you should still shut off the power at your main circuit breaker panel before activating the generator. If you do that, you’ll simply need to shut off the generator and reset your circuit breaker once the local power comes back on.

Setting up utilities on a vacant property usually takes at least a few months, or between 6 weeks to 16 weeks. This process requires working with the local planning and zoning department, hiring a building contractor or engineer to design the utility layout, securing permits, laying the lines, and connecting the utilities.

The Laurel, MT homeowners’ guide to generator installs

From average costs to expert advice, get all the answers you need to get your job done.