Top-rated generator install pros.

Get matched with top generator install pros in Hardin, MT

Enter your zip and get matched with up to 5 pros

Need a pro for your generator install project in Hardin, MT?

Select your specific project to find the pro for you.

Find Generator install pros in Hardin

Town & Country Electric
4.9(
12
)

Serving Hardin, MT and surrounding areas

Approved

In business since 1995

Free estimates

Credit card accepted

With more than 45 years of experience, Town & Country Electric is dedicated to providing our customers with the best quality at a great price. We are here to build relationships with our customers and communities and to provide our employees with a great place to work. We look forward to working with you!\n

11 neighbors recently requested a quote
Recommended by50%of homeowners
Avatar for Mountain Electric of Montana
Mountain Electric of Montana
5.0(
1
)

Serving Hardin, MT and surrounding areas

In business since 2007

Free estimates

Emergency services offered

We pride our company on reliability, great communication,\nintegrity, and quality work. We are experts in our trade and will do our best\nto keep you as educated as we can on your particular task or project. We look\nforward to earning your business!

Response time11 hrs
Generator Install questions, answered by experts

As a safety measure, you should always turn off the main breaker while operating your generator’s backup breaker. In addition, you should also switch off all appliance breakers so you don't have a power surge when the main breaker turns back on. And finally, turning off the main breaker prevents back-feeding, which endangers utility workers with the risk of electrocution. Back-feeding could also destroy the electrical circuits of your neighbors if they use the same power network.

If you have a transfer switch properly installed, the generator and main electrical power cannot feed the system at the same time. However, you should still shut off the power at your main circuit breaker panel before activating the generator. If you do that, you’ll simply need to shut off the generator and reset your circuit breaker once the local power comes back on.

While the rating will tell you how many watts the refrigerator needs at the peak of its cycle, it requires additional wattage to start. At the bare minimum, you’ll need a 1,500-watt generator to get the fridge up and running after a blackout. A 2,000-watt generator should be sufficient for most home refrigerators.

Setting up utilities on a vacant property usually takes at least a few months, or between 6 weeks to 16 weeks. This process requires working with the local planning and zoning department, hiring a building contractor or engineer to design the utility layout, securing permits, laying the lines, and connecting the utilities.

With proper maintenance, a whole-house generator can last between 20 and 40 years. The specific lifespan depends on how often and for how long the generator is used, and some models may have their life expectancy rated in hours of operation. To maximize its lifespan, expect to spend around $150 to $300 per year for annual maintenance checks from a qualified technician. During these checks, a technician will inspect the engine filter, starting mechanism, fuel, lubrication, and coolant levels. Consulting your installer and choosing a low-impact fuel like natural gas or diesel can also help ensure your generator lasts as long as possible.

The Hardin, MT homeowners’ guide to generator installs

From average costs to expert advice, get all the answers you need to get your job done.