Top-rated contractors.

Best contractors near Southaven, MS

Enter your zip and get matched with up to 5 pros

Need a pro for your contractor service project in Southaven, MS?

Select your specific project to find the pro for you.

TRUSTED BY SOUTHAVEN, MS HOMEOWNERS

  • Average homeowner rating star icon4.4
    Average homeowner rating
  • Verified reviews icon19
    Verified contractor services reviews

Top-Rated Contractors in Southaven - Updated Nov 2026

Avatar for Paul's Tile Inc
Paul's Tile Inc
4.4(
91
)
Major Home Repairs (General Contractor)

Serving Southaven, MS and surrounding areas

In business since 1987

Free estimates

Warranties offered

"The workers arrive on time, work until the job is finished in a professional and attentive manner. I had no problem with trust issues since I went to work allowing access to my house with no problems. The work is done to your satisfaction without complaint. I have used other contractors and spent many a day waiting for someone not to arrive as promised. This will not happen with this company."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+16

Recommended by90%of homeowners
...
Showing 1-10 of 95
Unfinished Carpentry FAQs, answered by experts

To calculate the number of linear feet of baseboard you’ll need, measure the length of each wall of the room you’re installing them in as close to the floor as possible, rounding up to the next full linear foot. If it’s your first DIY molding job, having a few extra feet on hand for miscuts is a good idea.

Installing a tongue-and-groove wall requires similar techniques to those associated with installing shiplap. However, because of the precision necessary to make each board fit perfectly and the increased material prices, the cost is higher than that of shiplap installations. Expect to spend between $2 and $6 more per square foot for tongue-and-groove walls versus shiplap ones.

In framing, studs are placed at 16-inch intervals to coincide with the typical spacing of wall materials such as drywall or plywood. This spacing is called "on-center" and is necessary for maintaining structural stability and efficient use of materials. The 16-inch spacing also helps to distribute the weight evenly across the building's structure. For those looking to cut material costs and improve energy efficiency, 24-inch stud spacing can be employed through a method called "advanced framing". This requires careful planning and adherence to local building codes to ensure structural integrity.

It’s best to use two screws to secure deck boards into every joist. Securing the boards to every joist makes the deck more structurally sound, while using two screws on the outer sides of the boards can help prevent warping and cupping.

A few signs that you need a new door frame include:

  • The door no longer fits properly in its frame and sticks or scrapes.

  • You notice cracks, holes, or rotting.

  • You feel a draft coming from around the door when it’s closed.

  • You find yourself frequently needing to make repairs.

The Southaven, MS homeowners’ guide to contractor services

From average costs to expert advice, get all the answers you need to get your job done.