Top-rated contractors.

Best contractors near Southaven, MS

Enter your zip and get matched with up to 5 pros

Need a pro for your contractor service project in Southaven, MS?

Select your specific project to find the pro for you.

TRUSTED BY SOUTHAVEN, MS HOMEOWNERS

  • Average homeowner rating star icon4.4
    Average homeowner rating
  • Verified reviews icon19
    Verified contractor services reviews

Top-Rated Contractors in Southaven - Updated Nov 2026

Avatar for Paul's Tile Inc
Paul's Tile Inc
4.4(
91
)
Major Home Repairs (General Contractor)

Serving Southaven, MS and surrounding areas

In business since 1987

Free estimates

Warranties offered

"The workers arrive on time, work until the job is finished in a professional and attentive manner. I had no problem with trust issues since I went to work allowing access to my house with no problems. The work is done to your satisfaction without complaint. I have used other contractors and spent many a day waiting for someone not to arrive as promised. This will not happen with this company."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+16

Recommended by90%of homeowners
...
Showing 1-10 of 95
Unfinished Carpentry FAQs, answered by experts

Yes, you will need a jack for a rim joist replacement. To prevent sagging and facilitate the removal of load-bearing wood, you’ll need to relieve the pressure from this joint before beginning work. 

Due to hydraulics and other specialized equipment, a sill plate and rim joist replacement are not typically a DIY project. Hiring a professional structural engineer and experienced contractors is the best approach to replacing rotted sill plates and rim joists.

Framing with metal studs can be significantly faster than using wooden studs, provided you have some experience working with the material. While you can use virtually instant pneumatic nailers with wood, metal requires installing screws. However, because metal is lighter, straighter, usually comes cut-to-length, and doesn't require sorting for the best pieces, you can save significant time using metal instead of wood.

Duration varies by project size, but average-sized homes typically take a weeks.

Enhances property value, ensures safety, and provides a sound basis for future construction.

Framing a house with steel generally takes less time—around five to eight weeks—than most building materials. The steel components can also be made quickly off-site and manufactured with pre-punched holes for running piping and electrical wiring, which will lessen the prep work and extra labor during construction.

The Southaven, MS homeowners’ guide to contractor services

From average costs to expert advice, get all the answers you need to get your job done.