Top-rated excavation pros.

Best excavation pros near Greenwood, MS

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Greenwood, MS?

Select your specific project to find the pro for you.

Top-Rated Excavation pros in Greenwood - Updated Nov 2026

Avatar for McCurtain Creek Contracting, LLC
McCurtain Creek Contracting, LLC
4.8(
4
)
Building Site - Preparation and Clearing - For Business

Serving Greenwood, MS and surrounding areas

In business since 2022

Free estimates

Offers commercial services

"They prepared a foundation site for our 30x50 storage shed and the work was top notch. Not only did he prepare the site, he cleaned up all the trees that had to be cut down. While he was there I asked if he could bury a conex for me that I would like to use for a storm shelter and he was willing to do that the same week without any problem. Both projects turned out great! I also hired them to do excavation work behind my business to keep water from coming into the building when it rains and since that work has been done the rain doesnâ t flood my building anymore. Iâ ve been very pleased."
Before photo
Removing brush
Finished pad
before photo
after photo

+21

Response time6 hrs
Response rate91%
Recommended by100%of homeowners
Cow Creek Construction
5.0(
2
)
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping+2 more

Serving Greenwood, MS and surrounding areas

Free estimates

Emergency services offered

Credit card accepted

"I needed about 20 acres cleared to turn into pasture land. They came out back in February 2022, did an absolute amazing job for a great price. Will most definitely recommend them to everyone!"
Excavating Project
Excavating Project
Excavating Project
Excavating Project
Additional Photos

+4

Recommended by100%of homeowners
Showing 1-10 of 44
Excavating FAQs, answered by experts

Prior to excavation, you should prepare the dig site and call 311 before you sign anything.

To get your site ready for excavation, you should move anything in the area that isn’t affixed to the land. You can save money on the excavation by removing hardscaping, including walkways, decks, concrete patios, and paver patios.

Before you carry out any digging, you should call 311 to confirm that there are no utility lines running through your excavation site. Skipping this step could lead to severe injury and property damage if your excavator hits a water, sewage, or gas line.

Depth is not a qualifying component of evacuation. Any human-made cut, cavity, or depression in the earth’s surface is considered excavation. The hole from excavation can be any size, shape, or depth. Excavation is used to create foundations, reservoirs, drainage ditches, and roads. Long, narrow excavations are called trenches and are often used for underground utilities.

There are several different factors that influence how long it takes to excavate. For a foundation, it could take anywhere from three days to three weeks. It can take even longer if you face weather-related delays or an inaccessible site that’s riddled with boulders and rough terrain. It may also take longer if you have clay soil, which is more difficult to dig.

You should dig 3 to 6 inches deep for plastic edging. Dig as wide as you need to fit your plastic edging into it—2 inches is usually sufficient.

Errors in site preparation can lead to structural failures or appear costly midway. Professionals ensure detailed, reliable home base development layouts.

The Greenwood, MS homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.