Top-rated deck cleaning pros.

Get matched with top deck cleaning pros in Knob Noster, MO

Enter your zip and get matched with up to 5 pros

Need a pro for your deck cleaning project in Knob Noster, MO?

Select your specific project to find the pro for you.

TRUSTED BY KNOB NOSTER, MO HOMEOWNERS

  • Average homeowner rating star icon4.7
    Average homeowner rating
  • Verified reviews icon12
    Verified deck cleaning services reviews

Find Deck cleaning pros in Knob Noster

Integrated Solutions and Services LLC
New to Angi
Deck, Fence, Patio or Porch - Clean and Seal

Serving Knob Noster, MO and surrounding areas

Approved

At Integrated Solutions & Services, we take pride in delivering quality craftsmanship, honest communication, and dependable service. We specialize in decks, fences, siding, roofing, drywall, painting, flooring, remodeling, concrete work, and a wide variety of home improvement projects. Whether you need a small repair or a complete renovation, we're committed to treating your home as if it were our own. We believe in fair pricing, reliable workmanship, and making sure every customer is satisfied from start to finish. We proudly serve Marshall, MO, and the surrounding communities. We look forward to helping bring your vision to life!

Avatar for Siding Repair Systems
Siding Repair Systems
4.5(
128
)
Deck, Fence, Patio or Porch - Clean and SealDeck, Fence, Patio or Porch - Clean and Seal - For Business

Serving Knob Noster, MO and surrounding areas

In business since 2009

Free estimates

Credit card accepted

"

This is a revised post.  I contracted with Siding Repair Systems (headquartered in O’Fallon, MO) in June 2015 for the removal and replacement of the wood siding on my two story house with James Hardie Siding (8" Hardie Lap Color +).  The estimate was for 2458 square feet of siding, 330 feet of soffit/fascia and 235 feet of 5" gutters and downspouts.  Mr. Cory Feco, principal/owner, met with me to provide contract and cost details in late June 2015 prior to signing the contract.  The installation window specified in the contract was a starting date NLT August 15 and a completion date NLT Sept 21.  The contracted cost of the job was just under $ 26,000 and a $ 1,000 deposit was provided to get the job scheduled.  The contract specified a payment of 20% upon material delivery, a payment of 30% at halfway completion and the balance upon satisfactory completion of the job. 

 

Siding Repair Systems called on Friday, August 21 and said that a crew would show up to begin the work on Monday, August 24.  The crew showed up on August 24.  Branch Manager Paul Dickens reviewed the work plan with me that morning.  The siding materials were delivered that afternoon.  The crew immediately commenced removal of the old siding.  Project Coordinator Cash Stricker showed up that afternoon to check in and see how the work was proceeding. 

 

The crew was diligent in their work.  They showed up promptly every morning, worked hard and kept the jobsite (my yard) relatively clean and organized.  The attention showed by Branch Manager Paul Dickens and Project Coordinator Cash Stricker during the prosecution of the work was timely, appropriate and appreciated.

 

The only detract was that about a week after completion of the fascia/trim painting, I noted exposed (unpainted) wood on the soffit above my garage.  I called Branch Manager Paul Dickens and left a voice mail about this issue.  Mr. Dickens did not returned my call.  I also mentioned this issue to Mr. Stricker and he said that he would get back to me.  He never got back to me.  This unpainted soffit issue remains unresolved.  My take-away is to be sure that a thorough final inspection is performed and that all issues have been resolved before final payment is made.  I would certainly use this company again but would delay final payment until all outstanding issues have been resolved. 

"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+6

Recommended by89%of homeowners
Showing 1-10 of 47
Deck Cleaning questions, answered by experts

Yes, you can build a deck over your outdoor HVAC unit, but you need to leave at least 5 feet of vertical clearance above the unit. If you don’t want your deck to be that high off the ground, you could build a floating deck in another part of your yard—again, as long as you leave at least 4 feet of horizontal space between the deck and your AC unit.

If you have wood decking, there are several common deck problems that you might encounter. For example, your natural wood boards may fade over time due to things like sunlight, weather, and debris. On top of that, some types of wood decking can rot, grow mold, and attract destructive pests—including termites, carpenter ants, and woodpeckers.

Unless you’re using a 2-in-1 formula or painting over an existing coat of paint, it pays to apply a coat of primer ahead of your new paint. Decks see a lot of footfall and exposure to extreme and sudden temperature changes and moisture levels. The primer promotes better paint adhesion, moisture repellency, and a smoother finish, which means you’ll often need fewer coats of paint. 

A sunroom will add more value to your home than a deck, but with a much higher up-front cost. Depending on its construction and function, a sunroom may be counted as additional living space, while a deck is strictly an outdoor feature. Both will increase your home’s value, but the sunroom will have a much bigger effect.

Both deck footings and deck posts help prop up your deck. However, footings are the bottommost parts of a deck that touch the ground. They’re usually made of concrete. Posts are pieces of wood that attach to the top of the footings with brackets. They run upwards and connect to the underside of your deck to support its weight.

The Knob Noster, MO homeowners’ guide to deck cleaning services

From average costs to expert advice, get all the answers you need to get your job done.