"We needed a new driveway as our old one was chipped and cracked in so many places and water was seeping into our basement after each heavy rainstorm. Crosstown Concrete came out and dug up our old cement driveway and poured a new one with new steps for our side entrance. We were so impressed by the knowledge, professionalism and courtesy of Greg's entire team. They were AMAZING! They worked tirelessly for days in the heat until the job was completed. His employees are the hardest working crew around! Our new driveway looks incredible and adds so much to our curb appeal. I will absolutely hire his team again for future work. I can't say enough great things about them!"
"They were very helpful and responsive to all my questions about a broken section of the driveway. They didn't push services and recommended the best course given driveway condition. They also were flexible in scheduling and responsive throughout multiple back and forths as I had to cancel and reschedule."
"Brady and his crew did a fantastic job! We love our new driveway and will definitely be calling him again for more concrete work. Highly recommend Brady’s Concrete and Construction!"
"Clack Companies, Is awesome, They delivered early and laid down wood under dumpster so not even a scratch on driveway. We called and asked if they would pick Dumpster up a few days early as we were done filling it, they showed up the next day! I recommend them for going above and beyond my expectations"
"They came out to review what we had talked about. They had solutions to our problems with our steps, walkway and general landscape areas in front and back of the house.
We like the ideas, but some parts were a bit more them we could afford at this time. The estimate included a paver sidewalk instead of cement. They presented an $11,900 plan for new steps, new walkway, removal and replacement of scrubs in front and in back of the house. Also included was a 20x20 foot cement replacement of part of the driveway. About $1500 of this was for future work in the back of the house. The owner provided a printed layout plan of his ideas.
The company does a lot of work with paver walkways and we were looking more for a combination of cement with paver trim. Cement work is done by a sub-contractor.
The company was good in following up on us with out making us feel pressured. After 2 months, we decided to scale down our needs and look for ways to do the project in small pieces over the next two years. We have done nothing since.
If a paver look is what a person wants, this is a company to be considered. They knew the product and had the experience."
Cobblestone is just one of many driveway materials. Other, more economical, albeit less elaborate options include concrete, asphalt, and gravel.
If you want a material that most closely resembles cobblestone, your best option is bricks or pavers. Both cost anywhere from $10 to $50 per square foot and can be laid in all kinds of patterns. Depending on the type of paver you choose, you can also get a good bang for your buck by investing in durable natural stone.
It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting.
The decision to repair or replace your driveway depends on the extent of the damage. If your driveway has a few small cracks, a simple repair will do the trick. If you see larger cracks and potholes, it may be time to consider resurfacing or replacement. Resurfacing is a great option if more than 25% of the surface is damaged, but if the damage is extensive—deep cracks or significant sinking—it’s best to replace the driveway entirely. A new driveway, with proper care, can last decades while patching or resurfacing might only hold up for a few years before needing more attention.
New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.
During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.
The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.
You should not attempt to install your own driveway. Whether working with asphalt or pavement, this is a complicated project that requires special equipment. Talk to some nearby asphalt or paving professionals and discuss your particular needs—it’s a good idea to get a few quotes and look at the company’s past work.
The Prior Lake, MN homeowners’ guide to asphalt driveway services
From average costs to expert advice, get all the answers you need to get your job done.
Use our guide to calculate the cost to seal an asphalt driveway in Minneapolis, MN. Prices vary based on the type of sealant and the size of the driveway.
The cost of a concrete driveway in Minneapolis, MN, varies based on size and concrete type. This cost guide breaks down all the key factors to help you budget.
Adding a new asphalt driveway to your home can boost its overall appearance and give homeowners a nice ROI down the line. But how long do asphalt driveways last, and what can you do to maximize their lifespans? Read this guide to find out.