Vinyl pools are the least expensive for installation thanks to the relatively low cost of vinyl pool liners. However, vinyl liners do not last as long as fiberglass or concrete designs, which could balance out the cost of the pool overall depending on its size.

Concrete pools have the longest life span. As long as you properly maintain your concrete pool, you can expect it to last 50 to 100 years. That said, you will need to resurface your concrete pool as it ages. Fiberglass is durable, but fiberglass pools generally only last around 25 to 30 years. That said, some high-end fiberglass pools can last more than 50 years if they’re well-maintained.

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

You can purchase preassembled or customized endless pools as small as 6-by-6 feet, though larger options are more common. For safety purposes, you will also need to set aside space surrounding the pool to support the pool and pool deck. A pool size chart can help you visualize the best shape for your needs.

Pool lights are designed to be safe by protecting swimmers from electrocution. These lights are made with waterproof fixtures and seals to prevent contact with the water.

Electrocution from pool lights is still possible, but rare. Faulty wiring or broken lighting equipment can make lights unsafe, so it’s important to replace lights as needed and have an electrician inspect and upgrade the wiring.