Top-rated basement remodelers.

Get matched with top basement remodelers in Gowen, MI

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Gowen, MI?

Select your specific project to find the pro for you.

Find Basement remodelers in Gowen

Avatar for J & M Group Michigan
J & M Group Michigan
5.0(
13
)
Basement - Remodel

Serving Gowen, MI and surrounding areas

Approved

Super Service Award Winner

In business since 2021

Free estimates

Small jobs welcome

"Reasonably priced and quality work. We had to have a supporting wall removed to enlarge a children's classroom at our church. This project had to be done so we would be able to use the classroom the following Sunday. J&M came in and removed the wall, installed a support beam, and finished the project so the two rooms looked like they had always been a single room. They cleaned up afterwards and we were able to use the room the next Sunday. Thank you for all that was done. Ed Building and Maintenance Coordinator."
Cabin Rebuild
Cabin Rebuild
Cabin Rebuild
Cabin Rebuild
Cabin Rebuild

+6

Response time3 days
21 neighbors recently requested a quote
Avatar for COMMUNITY CONSTRUCTION MICHIGAN LLC
COMMUNITY CONSTRUCTION MICHIGAN LLC
4.3(
20
)
Basement - Remodel

Serving Gowen, MI and surrounding areas

Approved

Super Service Award Winner

In business since 2021

Free estimates

Credit card accepted

"I would like to thank Community construction for the work they did with the remodel / rework job they did on my manufactured home in the Yankee Springs / Middleville Michigan area. I recently have expanded my family and need to convert an extra living room space into a bedroom and a smaller sitting / tv room. The Gentleman "Nate" who worked on my home did a great job. Nate communicated with me every step of the way to make sure I was always informed of what was going on. thanks again."
Before
Modernized Roof
Long Deck After
Long Deck Before
AFTER!

+3

Response time1 day
4 neighbors recently requested a quote
Recommended by62%of homeowners
Avatar for Matrix Basement Finishing
Matrix Basement Finishing
4.0(
65
)
Basement - Remodel

Serving Gowen, MI and surrounding areas

In business since 2009

Free estimates

Warranties offered

"When we signed the Matrix contract in June 28,2018 for basement work we were told it would be done the end of October or the first of November 2018. We told them that was good because we go to Arizona the end of December 2018. When we left all that was done was rough: framing, plumbing, electrical and ceiling. In May 2019 Matrix started work again and finally June 17, 2019 the final inspection was done. If Matrix overbooked jobs, Matrix should let the customer the customer know and not leave them hanging. Being overbooked was probably why the drywall job and the soffit run to cover the ceiling beam was less than professional. We give the following grades: grade A to the project manager, the other work teams. grade C to Matrix as a company. Thank you, Jack and Bonnie Childs"
Happy Bathroom Customers
Happy Bathroom Customers
Happy Bathroom Customers
Response time2 days
Response rate86%
Recommended by92%of homeowners
Avatar for Bob's Complete Construction, Inc
Bob's Complete Construction, Inc
3.7(
155
)
Basement - Remodel

Serving Gowen, MI and surrounding areas

In business since 1988

Emergency services offered

Credit card accepted

"I told Bob I was in no hurry and he could do it when he had some down time because I realized it was a small job and with the $75 deal I bought I knew he wasn't going to make much money. We spoke in the morning about this. He ended up calling me about 4:00 that afternoon and ask if he could do the job now. I said sure and he was there in a 1/2 hour. Quickly got to work and job was done in about 1 1/2 hours which I thought was fast because none of the doors had deadbolts before and he had to drill out each door. He also gave me some advice on projects I wanted to do in the future. Overall I was impressed and will call him for future projects I can't do myself.
"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+5

Recommended by69%of homeowners
Avatar for Vander Hyde
Vander Hyde
4.3(
363
)
Basement - Remodel

Serving Gowen, MI and surrounding areas

In business since 1989

Free estimates

Emergency services offered

"Excellent service, to say the least!  I ordered a 20kW Generac generator from a nationwide distributor and had it shipped directly to my location.  I poured the concrete pad myself, and bolted the generator down.  While somewhat proficient with electrical wiring, I did not trust that I could do this job without issue.  I contacted VanderHyde (they were listed as the primary West Michigan Generac Dealer) and asked if they could do the wiring for me.  Ryan Hyde came out for the quote and spent nearly two hours at my house talking about the transfer switch.  Generac provided a 200 amp switch, but my house was wired for 150.  We agreed that I would give them my 200 amp automatic transfer switch, and they would order a 150 amp switch as a replacement......and I would cover the split cost.....essentially adding $360 on to my bill.  I was fine with that.  Jason did the install on 11-16-2012 and spent 8.5 hours outside.  One trip to Lowes/Home Depot was needed for additional parts to tie into the existing power meter.  A great guy - I asked numerous questions and he explained what he was doing as he worked.  Once done, he came inside and asked if I wanted to be present for the "firing up" up the generator.  Overall the price was a bit high, but I also understand that I did not purchase the generator from them.  I was able to get the generator new for a little over $5000 online, which resulted in a large overall cost savings....so I expected to pay a bit more for the work I did not feel confident in doing myself.  I felt they did an amazing job and I would gladly call them again as needed for additional electrical work.  One a side note, I lost my original installation paperwork in a basement flood two years ago.  I called the company and had a copy of all paperwork in my email inbox in less than five minutes.  NICE!  Please note:  This review will be listed under "water softeners" and I cannot find a way to change it!
"
Recommended by81%of homeowners
Showing 1-10 of 49
Basement Remodel questions, answered by experts

Professional remodelers streamline the process, manage permits, and handle renovations efficiently—significantly mitigating risk while maintaining standards.

Yes, most general contractors require an initial down payment. A reasonable deposit is typically between 10% and 25% of the total project cost, although this can vary by project size and location. This upfront payment helps the contractor cover initial costs like materials, permits, licensing, and hiring subcontractors. The remaining balance is usually billed according to a schedule outlined in your contract, often tied to project milestones or completion dates. Be cautious of contractors who ask for a large deposit of 50% or more, as this could be a red flag for a scam.

Adding an extension or addition to your home costs more than a loft conversion in all but the rarest cases where the home's structural integrity is lacking. Because a home addition requires a new foundation section or significant structural upgrades to handle a cantilevered portion, the cost compared to almost any loft conversion is significantly greater for the same square footage.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Yes, in most cases, finishing a basement is worth the cost. The project adds valuable, usable square footage to your home and typically provides a return on investment (ROI) of 70% to 75%. For example, an average basement refinishing project costing $32,000 could add between $22,400 and $24,000 to your property's value. The final value added depends on factors like your location, the quality of materials and workmanship, and the features you include, such as a living space, bedroom, or bathroom. To be officially counted in your home's total square footage, the finished space must comply with all local building codes, including requirements for points of egress. However, in areas prone to flooding, a finished basement might be seen as a liability by potential buyers and could potentially decrease your home's value.

The Gowen, MI homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.