Top-rated excavation pros.

Get matched with top excavation pros in Chippewa Lake, MI

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Chippewa Lake, MI?

Select your specific project to find the pro for you.

Find Excavation pros in Chippewa Lake

Avatar for Knoch & Sons
Knoch & Sons
5.0(
2
)
Landscape - Minor Grading or ReslopingBuilding Site - Preparation and Clearing - For Business

Serving Chippewa Lake, MI and surrounding areas

Approved

In business since 1996

Free estimates

Credit card accepted

"Absolutely amazing company! They do incredible work and take real pride in what they do. The quality, attention to detail, and professionalism are outstanding. They show up, get the job done right, and leave everything looking better than expected. If you’re looking for a reliable company that you can trust, I highly recommend them! You won’t be disappointed! 👏🏼🌳🚜"
Knoch & Sons
2 neighbors recently requested a quote
...
Showing 1-10 of 56
Excavating questions, answered by experts

Underground downspouts refer to the sections of downspout extensions that lead away from your home and gutter system. While they cost more than traditional extensions, they can provide several benefits, such as less frequent damage and no need to move them for lawn care tasks. Whether they're worth it or not depends on your budget at installation time and how much convenience they'll add to your situation.

Yes, trenchers can go through gravel. Gravel is made up of smaller, softer rocks that certain trenchers are able to cut through. Just be sure to use a rock wheel trencher or chain trencher, both of which are made to cut through rocky landscapes and gravel pathways without dulling the teeth or chain.

Excavation is priced in cubic yards, so you’ll need to find the volume of the area in order to calculate costs. Multiply the length, width, and proposed depth of your excavation site, then convert it into yards to get the volume. Multiply this figure by the price per cubic yard.

Most homeowners can measure by hand to get a rough estimate, even if it’s tedious. You may want to pull out a tape measure or use a string to help mark the area.

Professional installers often include a deep layer of crushed gravel under permeable pavers to allow more runoff to soak through into the soil below. Many installations will include multiple layers of gravel, with coarser aggregate at the base and finer aggregate that sits on top of that bottom layer. Above the gravel, you’ll often find coarse sand that helps reduce paver shifting over time. Some permeable paver designs include a water collection system set into the gravel layer to route runoff to a safe area for disposal.

You should dig 3 to 6 inches deep for plastic edging. Dig as wide as you need to fit your plastic edging into it—2 inches is usually sufficient.

The Chippewa Lake, MI homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.