Top-rated basement remodelers.

Get matched with top basement remodelers in Cadillac, MI

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Cadillac, MI?

Select your specific project to find the pro for you.

Find Basement remodelers in Cadillac

Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Cadillac, MI and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for Unclebobs Home Remodeling and Repair
Unclebobs Home Remodeling and Repair
New to Angi
Basement - Remodel

Serving Cadillac, MI and surrounding areas

In business since 1989

Unclebobs home remodeling specializes in all areas of the building and remodeling industry. Custom cabinet builder and other sorts of trim and doors! Custom trim wrapping on the exterior windows, doors, columns and beams! If you need it ask us and we will exercise our experience to help it come true.

Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+12

Showing 1-10 of 25
Basement Remodel questions, answered by experts

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

If you’re not sure which method of raising the ceiling is best for you, here are a couple of considerations to help you make that decision. A professional ceiling company will be able to help you determine the best option for your home.

  • How long you are planning to live there: although raising the basement ceiling will increase the value of your home, if you’re planning to sell the house, then go for raising the house.

  • The condition of the foundation: to lower the floors, your foundation has to be intact whereas raising the house will allow you to restore the damaged foundation.

Common mistakes when finishing basement walls include neglecting proper insulation, insufficient moisture management, and poor ventilation. Not addressing these issues can lead to mold growth, water damage, and discomfort. Additionally, inadequate planning, improper framing, and rushing the project can result in subpar outcomes. 

It's essential to follow best practices, seek professional guidance if needed, and prioritize thoroughness and attention to detail.

Some older homes have toilets in the basement to combat sewage backups. This type of toilet, also known as a Pittsburgh potty, acted as a safety valve over the incoming sewer line. If a line backed up, it would back up into the toilet because it was the lowest fixture in the home, keeping it out of sight and away from the finished areas of the house.

Basement toilets were also used by workers with messy jobs, like those who worked in coal mines or steel mills. This way, they could clean up and avoid tracking dirt through their home.

Making a window in a basement larger costs an average of $4,200. You’ll need to pay an average of $550 to have a structural engineer plan the project, $500 to $1,500 for the installation labor, and an average of $2,200 for the excavation and window well installation. The remainder will go toward pulling permits, installing trim, and repairing drywall on the interior.

The Cadillac, MI homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.