Top-rated subcontractors.

Get matched with top subcontractors in Finksburg, MD

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Finksburg, MD?

Select your specific project to find the pro for you.

TRUSTED BY FINKSBURG, MD HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon4.5k+
    Verified subcontracting services reviews

Find Subcontractors in Finksburg

Avatar for VKB Kitchen & Bath
VKB Kitchen & Bath
4.7(
339
)
Major Home Repairs (General Contractor)

Serving Finksburg, MD and surrounding areas

Approved

In business since 2002

Free estimates

Emergency services offered

"The master bathroom renovation process we experienced was frustrating and plagued with many unnecessary delays and quality control breakdowns. Having gone through numerous home improvement projects, we carefully researched companies and selected VKB Kitchen and Bath in large part because of the overwhelmingly positive reviews we read on numerous websites, including Angie’s List. Unfortunately, the company we worked with bore little resemblance to the glowing reviews we read. While we are ultimately happy with the finished product, we do not feel anyone should experience the frustrating ordeal we went through to have a bathroom renovated. Consequently, we cannot recommend VKB Kitchen and Bath. We signed a contract with VKB on March 17, 2016, to perform a complete renovation of our master bath. The project was to follow the VKB designer’s specifications, and was to be substantially completed in 2 weeks—their estimate, not ours—with minor items to be addressed in a final third week. The actual renovation began on April 19th, a week later than originally planned. From the beginning, we experienced problems. VKB gave us access to an automated project management tool to check on the job’s status, see what work was scheduled each day, see any change orders for modifications made during the renovation, and communicate any questions or concerns through its message board. VKB was to use the tool to communicate progress, work schedules, and responses to our questions. If actually used and kept current, it would have been a helpful resource to monitor the job’s status and any slippages. However, VKB rarely used it, and when it was used, it presented grossly inaccurate information (ex., noting tasks as “completed” when they had not been started or were well behind). Toward the end of the job, after numerous delays and a turnover in the subcontractor VKB hired to perform the work and the reassignment of the project manager, the lead designer—Joe—used the messaging feature more frequently to timely respond to our questions or concerns and to better inform us as to the new sub-contractor’s work schedule. Demolition of the old master bathroom took several days, primarily because most of the work was done by one worker. This pattern continued during construction of the new bathroom. Each day, several workers would show up to unload equipment, but then typically most would go to another job site, leaving just one person to handle much of the work. We were told that the crew would begin work between 8 a.m. and 9 a.m. and would work full days as long as there was work to be done, yet for the vast majority of the time the initial subcontractor was involved, the crew would not show up until 10 a.m. or later, and would usually leave between 3 and 4 p.m. There were days when no one showed up and we were not notified that no one would be coming that day, despite there being ample work. The lack of sufficient workers and erratic work hours were major factors in the job quickly falling behind schedule. When we raised concerns about job slippages to VKB’s project manager, he dismissed our concerns. Serious communication issues existed between the subcontractor and VKB’s project manager which led to mistakes and delays. For example, one key design decision prior to commencement of the renovation was the removal of a ceiling and wall bulkhead to allow for more open space. The bulkhead wall contained a ventilation register which had to be removed and rerouted through a toe-kick in one of the new vanities. Due to miscommunications, the subcontractor tiled over the ventilation opening on the floor. The crew had to subsequently pull up newly-installed tile to create a ventilation path and install a new vent. However, because of the manner in which this ventilation path was constructed, the floor register did not fit properly flush with the tile floor. It still does not fit properly to this day. To be fair, issues arose which contributed to delays in the job that were not originally anticipated. For example, when the subcontractor finished the demolition, he noted that the floor was not completely level. To his credit, he took steps to fully level the floor, which took a day to complete. Additionally, in designing the new bathroom, the designer envisioned shifting the position of the toilet. As the job progressed, the subcontractor and project manager realized this would not work without extending a wall. We agreed with this change, which added another day to the project. Finally, we were scheduled to be out of town beginning in mid-May, which resulted in the crew not being able to work on the job for 10 days. Yet, had the job met the original contracted timeframes, it should have been completed nearly 2 weeks prior to our trip. When little additional progress had been made 2 weeks after our return, VKB reassigned the project manager and Joe, our lead designer, fired the subcontractor and brought in a new subcontractor to complete the bathroom renovation. However, this subcontractor had to work us into his existing jobs, putting a strain on his crew. To further complicate the new subcontractor’s job, there were numerous instances in which materials delivered were either defective or incomplete. For example, a large wood linen cabinet was unfinished on one side, resulting in VKB having to order a piece to finish the side. Additionally, the cabinet, and two vanities that were to be installed were supposed to have two side-by-side doors. When we inspected the delivered cabinet and vanities, we found that they had single doors. After noting this to VKB, we were told that the manufacturer did not make vanities that had two side-by-side doors, though they were in VKB’s design and the contract specified them. When we noted this would be problematic with respect to the linen cabinet given its placement in the bathroom, VKB said the cabinet could have side-by-side doors but it would require re-ordering them. We later found out that any re-ordering of items would require 2-to-3 weeks from the time of ordering until the items would arrive. While a 2-to-3 week delay was bad enough given the significant slippages already incurred, it turned out that VKB also misjudged other wood materials needed from this same manufacturer to complete the cabinet and vanity installation–such as trim and crown molding we had requested prior to commencement of the renovation–which resulted in another several weeks of delays. The end result of these missteps was that the new subcontractor had to pull out on two occasions for a period of 2 weeks each to allow time for new and/or replacement parts to arrive. Additionally, VKB twice sent out a separate crew to install the shower door and glass, and each time, the crew had to leave without performing the installation because work on the shower was not sufficiently complete for them to install the glass. When they were finally able to attempt the installation, they discovered an error in the manufacturing of one side of the glass. They had to reorder the side, resulting in yet another delay. Perhaps most disturbing is that the door and glass had been ready for weeks, yet no one checked them to ensure the manufacturer had completed them to specification. Other examples of this abound, including delivery of bathroom sinks and countertops which were not properly made and hardware for the cabinet and vanities, which were missing handles. Many of these problems could have been prevented or at least detected and addressed earlier had VKB had an effective process in place to ensure all materials ordered from vendors were inspected for both quantity and quality as soon as they were received. As a result of these problems, our master bathroom renovation—which was to have taken at most 3 weeks—took nearly 4 months to complete. Final work was completed on August 8th. Even at that, we ultimately settled for certain things simply to end the ordeal and move on. For example, the floor register that had been improperly installed by the initial subcontractor was never properly resolved by VKB—its solution was to cut the register bottom"
Kitchen Remodeling in Severn, MD white countertop, cabinets & wooden floors
Kitchen Remodeling in Silver Spring, MD with wooden flooring & quartz countertop
Home Remodel with New Kitchen, Bathroom, Basement & Decking
Complete Home Makeover of Kitchen, Bath & Basement in Laurel, MD
Kitchen Remodel in Laurel, MD with quartz countertop & wooden flooring

+1053

Response time1 day
Response rate100%
2 neighbors recently requested a quote
Avatar for FAMB Construction, LLC
FAMB Construction, LLC
5.0(
22
)
Major Home Repairs (General Contractor)

Serving Finksburg, MD and surrounding areas

Approved

In business since 2019

Free estimates

Customers say: True professional

"Exceptional work! I hired FAMB Construction, LLC after interviewing quite a contractors (large and small companies) to replace my wood deck with Trex composite decking. Noel and Claudia are extremely professional from start to finish of the project and clearly communicated in detail what work was going to be done. Noel provided a variety of actual samples choose from and provided helpful details on how the project would be completed. My deck looks amazing and Noel even corrected some deck issues that were not within the scope of the project. I would highly recommend FAMB Construction for their high level craftmanship, professionalism, timeliness, and cost efficiency in completing my project. Truly a Five Star ***** contractor, no exaggeration."
Regular Wood Deck
Deck
Deck
Frame Moulding
Deck

+37

Response time1 day
Recommended by95%of homeowners
Avatar for E&V remodeling innovation
E&V remodeling innovation
5.0(
24
)
Major Home Repairs (General Contractor)

Serving Finksburg, MD and surrounding areas

Approved

Super Service Award Winner

In business since 2024

Free estimates

Emergency services offered

"The company was awesome! I needed 2 drawers made for my kitchen cabinet. I couldn't find any other company that would make just the 2 drawers. Every company who came just wanted to give me a whole new kitchen which I didn't want. But E&V understand my needs and got it done quickly and I no longer have the unpleasant sight of 2 gaping hole in my kitchen cabinets. Thank you E&V!"
Framing Project
✨
Framing Project
Deck
Deck

+3

Response time3 days
Response rate100%
Recommended by26%of homeowners
Avatar for D&V Remodeling, LLC
D&V Remodeling, LLC
5.0(
15
)
Major Home Repairs (General Contractor)

Serving Finksburg, MD and surrounding areas

Approved

In business since 2012

Free estimates

Emergency services offered

"Guillermo, the owner of D&V Remodeling, has been absolutely fantastic to work with. I hired him to do few diverse projects and he was very knowledgeable, efficient and performed superb quality work. Itâ  s not every day that you meet a contractor that has your best interest in mind, is honest, trustworthy and just genuinely a nice person that wants to do his best for his customer and does it so well. I value attention to details and I was truly impressed with his work. Guillermo was very communicative in keeping me up to date on scheduling and then before the projects started, during and after. Overall, it was absolutely a pleasure to have him work on my projects. Even though I was not available to monitor every aspect of the projects, he delivered superbly high quality of work. I also appreciated his flexibility to get me on his schedule. I will DEFINITELY hire him again!"
Bathroom
Bathroom
Bathroom
Bathroom
Bathroom

+27

Response time2 days
Response rate87%
5 neighbors recently requested a quote
Avatar for Pablo & Jr Construction
Pablo & Jr Construction
5.0(
9
)
Major Home Repairs (General Contractor)

Serving Finksburg, MD and surrounding areas

Approved

In business since 2021

Free estimates

Emergency services offered

Pablo & Jr Construction is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests, and make their concerns the basis of our business.

Life Science Logistics
Life Science Logistics
Life Science Logistics
Life Science Logistics
Life Science Logistics

+2

Response time6 hrs
41 neighbors recently requested a quote
Recommended by88%of homeowners
Avatar for Home  Again Renovations LLC
Home Again Renovations LLC
5.0(
5
)
Major Home Repairs (General Contractor)

Serving Finksburg, MD and surrounding areas

Approved

In business since 2023

Free estimates

Warranties offered

Home Again Renovations LLC is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers interests, and make their concerns the basis of our business.

Kitchen Remodel
Bathroom Renovation
Response time10 mins
Response rate100%
Recommended by100%of homeowners
Almack Construction, Corporation
5.0(
1
)
Major Home Repairs (General Contractor)

Serving Finksburg, MD and surrounding areas

Approved

In business since 2013

Free estimates

Offers commercial services

Almack Construction Corporation is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers interests and make their concerns the basis of our business. Please give us a call today!

Response time1 day
Recommended by100%of homeowners
...
Showing 1-10 of 295
Subcontractors questions, answered by experts

You can draw your own house plans using three-dimensional modeling software, but in most cases, you’ll need an architect to draw up the final plans. Architects understand local building regulations and requirements, so their plans will be necessary for getting permits approved, and they’ll also ensure your home is structurally sound. DIY house plans can be a good place to start to help visualize your project, but you should always defer to a professional before trying to proceed with the project.

Building designers charge between $2,000 and $50,000, depending on project scope, complexity, and customization.

You don’t have to commit to a complete home renovation to age in place comfortably—those can get pricey. Instead, focus on a few impactful changes. Consider adding a stair lift or installing ramps to eliminate barriers. Upgrading to non-slip flooring can prevent falls while adding brighter lighting can improve visibility throughout your home. These thoughtful updates can make your home much easier to navigate and enhance your comfort and safety without the stress and cost of a complete overhaul.

Yes, such as using eco-friendly materials and energy-efficient designs for long-term savings.

Mid-century modern architecture was a popular home style throughout the U.S. from the 1950s to 1970s. Most homes feature a wide and symmetrical floor plan with low-sloped roofs and floor-to-ceiling windows. Its minimalism and balanced appearance are back on the home style scene, particularly when maximizing sunlight, airflow, and a blend with the home's natural surroundings.

The Finksburg, MD homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.