Top-rated subcontractors.

Best subcontractors near Fallston, MD

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Fallston, MD?

Select your specific project to find the pro for you.

TRUSTED BY FALLSTON, MD HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon2.2k+
    Verified subcontracting services reviews

Top-Rated Subcontractors in Fallston - Updated Nov 2026

Avatar for Perryhall Remodeling
Perryhall Remodeling
4.9(
327
)
Major Home Repairs (General Contractor)

Serving Fallston, MD and surrounding areas

Approved

In business since 1980

Free estimates

Warranties offered

"I have nothing but good things to say about Gary Howard Sr. and Gary Howard Jr. of Perryhall Remodeling. I had storm damage that resulted in an assortment of things to be repaired. Gary Sr. and Gary Jr are truly caring professionals. Some of the work had to be subcontracted (chimney and roofing) and they hired excellent contractors. They were attentive to any concerns that we had during the process. They made sure that everything was completed in a reasonable amount of time and the end result of all aspects are beautiful. Hire them; you won't be sorry."
Additional Photos
Additional Photos
Foyer-after
Additional Photos
Fireplace Before

+23

Response time1 day
1 neighbors recently requested a quote
Recommended by99%of homeowners
Avatar for JD Michael Construction Inc
JD Michael Construction Inc
4.9(
59
)
Major Home Repairs (General Contractor)

Serving Fallston, MD and surrounding areas

Approved

In business since 1989

Free estimates

Warranties offered

"Joe Delfine from JD Michael Construction was the general contractor/project manager for a whole house renovation. Joe supported our process from pre-purchase of the house through the renovation and working the inspection list for our eventual sale. Joe managed every aspect of the renovation managing more than 25 subcontractors and a budget close to $150,000. This included formal renovation design, permitting, scheduling, subcontractor management, financial management procurement, scheduling, and safety and quality control. Joe's tenants of safety, quality and timeliness were key to our successful and profitable renovation. The job consisted of: design, complete demolition of the interior/exterior down to bare studs, demolition and removal of a two story concrete out building, procurement of materials and oversight for new siding and roof, all new windows, electrical and plumbing, subfloor repair and installation, new hardwood/carpet/tile flooring, new drywall throughout the entire house, paint, trim, cabinet/vanity installation, lighting, and more. This project was successful because JD Michael positively supported every aspect of the project. We are continuing to work with Joe/JD Michael Construction on another project as well as future projects."
Remodeling - General Project
Remodeling - General Project
Remodeling - General Project
Additional Photos
Additional Photos

+13

Response time2 days
Response rate100%
1 neighbors recently requested a quote
Avatar for VKB Kitchen & Bath
VKB Kitchen & Bath
4.7(
341
)
Major Home Repairs (General Contractor)

Serving Fallston, MD and surrounding areas

Approved

In business since 2002

Free estimates

Emergency services offered

"The master bathroom renovation process we experienced was frustrating and plagued with many unnecessary delays and quality control breakdowns. Having gone through numerous home improvement projects, we carefully researched companies and selected VKB Kitchen and Bath in large part because of the overwhelmingly positive reviews we read on numerous websites, including Angie’s List. Unfortunately, the company we worked with bore little resemblance to the glowing reviews we read. While we are ultimately happy with the finished product, we do not feel anyone should experience the frustrating ordeal we went through to have a bathroom renovated. Consequently, we cannot recommend VKB Kitchen and Bath. We signed a contract with VKB on March 17, 2016, to perform a complete renovation of our master bath. The project was to follow the VKB designer’s specifications, and was to be substantially completed in 2 weeks—their estimate, not ours—with minor items to be addressed in a final third week. The actual renovation began on April 19th, a week later than originally planned. From the beginning, we experienced problems. VKB gave us access to an automated project management tool to check on the job’s status, see what work was scheduled each day, see any change orders for modifications made during the renovation, and communicate any questions or concerns through its message board. VKB was to use the tool to communicate progress, work schedules, and responses to our questions. If actually used and kept current, it would have been a helpful resource to monitor the job’s status and any slippages. However, VKB rarely used it, and when it was used, it presented grossly inaccurate information (ex., noting tasks as “completed” when they had not been started or were well behind). Toward the end of the job, after numerous delays and a turnover in the subcontractor VKB hired to perform the work and the reassignment of the project manager, the lead designer—Joe—used the messaging feature more frequently to timely respond to our questions or concerns and to better inform us as to the new sub-contractor’s work schedule. Demolition of the old master bathroom took several days, primarily because most of the work was done by one worker. This pattern continued during construction of the new bathroom. Each day, several workers would show up to unload equipment, but then typically most would go to another job site, leaving just one person to handle much of the work. We were told that the crew would begin work between 8 a.m. and 9 a.m. and would work full days as long as there was work to be done, yet for the vast majority of the time the initial subcontractor was involved, the crew would not show up until 10 a.m. or later, and would usually leave between 3 and 4 p.m. There were days when no one showed up and we were not notified that no one would be coming that day, despite there being ample work. The lack of sufficient workers and erratic work hours were major factors in the job quickly falling behind schedule. When we raised concerns about job slippages to VKB’s project manager, he dismissed our concerns. Serious communication issues existed between the subcontractor and VKB’s project manager which led to mistakes and delays. For example, one key design decision prior to commencement of the renovation was the removal of a ceiling and wall bulkhead to allow for more open space. The bulkhead wall contained a ventilation register which had to be removed and rerouted through a toe-kick in one of the new vanities. Due to miscommunications, the subcontractor tiled over the ventilation opening on the floor. The crew had to subsequently pull up newly-installed tile to create a ventilation path and install a new vent. However, because of the manner in which this ventilation path was constructed, the floor register did not fit properly flush with the tile floor. It still does not fit properly to this day. To be fair, issues arose which contributed to delays in the job that were not originally anticipated. For example, when the subcontractor finished the demolition, he noted that the floor was not completely level. To his credit, he took steps to fully level the floor, which took a day to complete. Additionally, in designing the new bathroom, the designer envisioned shifting the position of the toilet. As the job progressed, the subcontractor and project manager realized this would not work without extending a wall. We agreed with this change, which added another day to the project. Finally, we were scheduled to be out of town beginning in mid-May, which resulted in the crew not being able to work on the job for 10 days. Yet, had the job met the original contracted timeframes, it should have been completed nearly 2 weeks prior to our trip. When little additional progress had been made 2 weeks after our return, VKB reassigned the project manager and Joe, our lead designer, fired the subcontractor and brought in a new subcontractor to complete the bathroom renovation. However, this subcontractor had to work us into his existing jobs, putting a strain on his crew. To further complicate the new subcontractor’s job, there were numerous instances in which materials delivered were either defective or incomplete. For example, a large wood linen cabinet was unfinished on one side, resulting in VKB having to order a piece to finish the side. Additionally, the cabinet, and two vanities that were to be installed were supposed to have two side-by-side doors. When we inspected the delivered cabinet and vanities, we found that they had single doors. After noting this to VKB, we were told that the manufacturer did not make vanities that had two side-by-side doors, though they were in VKB’s design and the contract specified them. When we noted this would be problematic with respect to the linen cabinet given its placement in the bathroom, VKB said the cabinet could have side-by-side doors but it would require re-ordering them. We later found out that any re-ordering of items would require 2-to-3 weeks from the time of ordering until the items would arrive. While a 2-to-3 week delay was bad enough given the significant slippages already incurred, it turned out that VKB also misjudged other wood materials needed from this same manufacturer to complete the cabinet and vanity installation–such as trim and crown molding we had requested prior to commencement of the renovation–which resulted in another several weeks of delays. The end result of these missteps was that the new subcontractor had to pull out on two occasions for a period of 2 weeks each to allow time for new and/or replacement parts to arrive. Additionally, VKB twice sent out a separate crew to install the shower door and glass, and each time, the crew had to leave without performing the installation because work on the shower was not sufficiently complete for them to install the glass. When they were finally able to attempt the installation, they discovered an error in the manufacturing of one side of the glass. They had to reorder the side, resulting in yet another delay. Perhaps most disturbing is that the door and glass had been ready for weeks, yet no one checked them to ensure the manufacturer had completed them to specification. Other examples of this abound, including delivery of bathroom sinks and countertops which were not properly made and hardware for the cabinet and vanities, which were missing handles. Many of these problems could have been prevented or at least detected and addressed earlier had VKB had an effective process in place to ensure all materials ordered from vendors were inspected for both quantity and quality as soon as they were received. As a result of these problems, our master bathroom renovation—which was to have taken at most 3 weeks—took nearly 4 months to complete. Final work was completed on August 8th. Even at that, we ultimately settled for certain things simply to end the ordeal and move on. For example, the floor register that had been improperly installed by the initial subcontractor was never properly resolved by VKB—its solution was to cut the register bottom"
Kitchen Remodeling in Severn, MD white countertop, cabinets & wooden floors
Kitchen Remodeling in Silver Spring, MD with wooden flooring & quartz countertop
Home Remodel with New Kitchen, Bathroom, Basement & Decking
Complete Home Makeover of Kitchen, Bath & Basement in Laurel, MD
Kitchen Remodel in Laurel, MD with quartz countertop & wooden flooring

+1053

Response time1 day
Response rate100%
3 neighbors recently requested a quote
Avatar for Springline Construction Corp
Springline Construction Corp
5.0(
2
)
Major Home Repairs (General Contractor)

Serving Fallston, MD and surrounding areas

Approved

In business since 2015

Free estimates

Emergency services offered

Springline Construction Corp. has over 30 years experience in general construction. We specialize in commercial multifamily renovations and additions. We started this company renovating and remodeling residential homes. We are your one stop shop because we do plumbing, electric, framing, drywall, painting, custom cabinets and countertops, windows, doors, siding, concrete and everything else you can think of! Working with one company from start to finish eliminates the hassle and expenses of working with several specialists. So call today and lets get you where you need to be. (Licensed, bonded and insured)

Remodeling - Kitchen & Bathroom Project
Remodeling - Kitchen & Bathroom Project
Remodeling - Kitchen & Bathroom Project
Response time1 day
Response rate100%
Recommended by50%of homeowners
Almack Construction, Corporation
5.0(
1
)
Major Home Repairs (General Contractor)

Serving Fallston, MD and surrounding areas

Approved

In business since 2013

Free estimates

Offers commercial services

Almack Construction Corporation is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers interests and make their concerns the basis of our business. Please give us a call today!

Response time1 day
Recommended by100%of homeowners
Avatar for Central Lending Svc Inc dba Credit Central
Central Lending Svc Inc dba Credit Central
4.8(
72
)
Major Home Repairs (General Contractor)

Serving Fallston, MD and surrounding areas

In business since 2003

Emergency services offered

"I knew it was going to be challenging to find an investor that would lend me money for this real estate venture.  I have lived 20 years in a four unit historic condominium building in downtown Jersey City and I wanted to buy the unit above me as an investment property.  But with Fanny Mae and Freddy Mac rules, they would not give me a loan because I would own half the building and this would give me too much control over condo association decisions.  I checked with Angie's List where Central Lending was well recommended and spoke with Mark, the president of Central Lending, about my situation and that I needed an unconventional loan outside of Fanny Mae and Freddy Mac oversights.  After many disappointments and on the very last day of my contract with the seller, Mark found a lender.  And on the very last day of the window to the loan, it closed.  I cannot thank Mark and his assistant Judy enough for their patience and steadfast of seeing this through.  I cannot tell you the emotional roller-coaster ride I went through during the 4 1/2 month duration.  There were many moments that I wanted to give up but Mark reassured me that the sale would happen.  Without Mark's personal intervention with the lender and title company, this deal would not have closed.   You can be sure that when I am in the market to buy unit #3, I will not hesitate to contact Central Lending.  Thank you so much."
Additional Photos
Recommended by100%of homeowners
Avatar for Supreme Window and Door
Supreme Window and Door
4.8(
69
)
Major Home Repairs (General Contractor)

Serving Fallston, MD and surrounding areas

In business since 2005

Free estimates

Emergency services offered

Supreme Window and Door is a full service exterior residential remodeling company specializing in replacement windows, exterior doors, siding, gutters and trim products. We are committed to providing homeowner’s with high quality exterior replacement products at affordable prices that our major competitors do not even want you to know about while maintaining a supreme level of customer satisfaction. Supreme Window and Door assures a no pressure sales approach, expert product knowledge and quality installation techniques backed with no-nonsense Lifetime product and installation warranties. We are fully licensed, bonded, and insured. We accept all major credit cards. Additional email - [email protected].

Windows
Bay window capped
Sliding Glass Door
Recommended by95%of homeowners
...
Showing 1-10 of 281
Subcontractors FAQs, answered by experts

The average build timeline for a home is between six and 12 months, with timelines pushing toward the upper end of that range if you’re creating a custom design or need a lot of land preparation before getting started. Hiring a general contractor or a custom homebuilder will help speed up the process, as you’ll see fewer delays between different parts of the build process getting done.

If your project is complex, it may make sense to hire an architect to draw plans. An architect might also be a good person to hire if you want to ensure your plans adhere to building codes and regulations.

Structural engineers draw structural plans, which include detailed drawings of the structural components of a home only. Complete house plans will require additional work from an architect or draftsperson, whose drawings will take the structural drawings into account. They’ll also include more details about the finishing materials and layout of a home, including everything from roofing and flooring materials to the position of furniture, light fixtures, switches, and plumbing fixtures.

Pros provide detailed quotes and efficient management, reducing overspending risks on materials and labor.

Designing a building takes 2-6 months, depending on project size, required permits, and revisions.

The Fallston, MD homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.