Top-rated ceramic tile pros.

Get matched with top ceramic tile pros in Tipton, IN

Enter your zip and get matched with up to 5 pros

Need a pro for your ceramic tile service project in Tipton, IN?

Select your specific project to find the pro for you.

TRUSTED BY TIPTON, IN HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon28
    Verified ceramic tile services reviews

Find Ceramic tile pros in Tipton

Avatar for Maynor Construction, LLC
Maynor Construction, LLC
4.3(
38
)

Serving Tipton, IN and surrounding areas

Approved

In business since 1995

Free estimates

Emergency services offered

"I added or made changes to the scope of work (siding). Satisfied with work, guys are great. Wish they had more availability for more work."
Sunroom 2
Sunroom 1
Screened In Porch 1
Screened In Porch 2
Sunroom & Screened Porch

+41

Response time2 days
10 neighbors recently requested a quote
Recommended by96%of homeowners
Avatar for Floor Coverings International North East Indianapolis
Floor Coverings International North East Indianapolis
1.0(
1
)

Serving Tipton, IN and surrounding areas

Approved

In business since 2024

Free estimates

Small jobs welcome

Welcome to Floor Coverings International of NE Indianapolis. We are the premier in-home flooring company serving Noblesville, Anderson Muncie, New Castle, Greenfield Shelbyville, Fortville and surrounding areas. We understand that each home is special and requires attention to detail. Whether it is a hardwood, carpet, tile, luxury vinyl, laminate or any other of our flooring options, we carefully treat each design as a custom project, working with you to meet your budgets and deadlines, to install the floors of your dreams! Take the guesswork out of getting new floors and schedule your free in-home consultation today!

Bathroom Remodel
Bathroom Remodel
Bathroom Remodel
Response time8 hrs
Response rate88%
16 neighbors recently requested a quote
Handyman Dan
New to Angi

Serving Tipton, IN and surrounding areas

Approved

In business since 2001

Free estimates

Credit card accepted

Handyman Danis committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty and responsibility in all of our jobs. We are a locally owned and operated business with more than 18 years of experience serving - and surrounding areas. There is no job too big, or too small for our team. Call today and let us put our experience to work for you

Avatar for Family Flooring
Family Flooring
5.0(
14
)

Serving Tipton, IN and surrounding areas

In business since 2014

Free estimates

Emergency services offered

"I am very pleased with the Family Flooring. Did two projects in a very professional manner and excellent workmanship. All in at a reasonable cost. I would recommend them for any flooring needs."
Master Bedroom
Master Bedroom
Response time8 hrs
Response rate94%
Recommended by50%of homeowners
Avatar for Legacy Window & Door LLC
Legacy Window & Door LLC
4.1(
151
)

Serving Tipton, IN and surrounding areas

Free estimates

Emergency services offered

Credit card accepted

"After receiving a few other estimates on a sunroom addition plus a screened in porch, we decided to go with Legacy Windows. Mark’s estimate was in the middle of the other estimates and he offered much more flexibility than the other companies we spoke to in terms of customization. He is a great salesman with previous marketing experience. We signed our contract on April 10th. We were told that Mark and his crew were finishing a room and would be able to start in 2-3 weeks with a timeframe of 6-8 weeks for completion of our room addition project. The budget and timeframe worked well for us, so we decided to add replacement windows for the rest of our house (11 windows total). Several weeks went by and our project had not yet started so we followed up with Mark. We were told that there were issues with his current project (did not pass inspection) and it would push our start date back due to the workmanship repairs. During this time period before any work began on our project we would communicate often with Mark to check on the status of our project. The really frustrating thing about working with Mark is his inability to fulfill commitments he would make to us in regards to project timing and when things would be done. Our primary communication with him was via text messages and time after time he would tell us, “we should be starting next week” or “we are going to be making up for lost time quickly” and time would pass and it just wouldn’t happen. Work on our project began when our existing windows were replaced in early June. The foundation for the expansion was finally started in late June and framing started in early July (roughly 3 months after signing the contract). The first crew completed the framing, hired the shingles out, installed some of the cedar siding, and installed one wall of windows. We were seeing decent progress after having such a long wait in the beginning, all the while the commitment issue just kept popping up. We would get a text saying something like, “going to be at the house tomorrow with some stone samples” and he wouldn’t show up. It was annoying, but progress was being made and we were happy with how the expansion was taking shape so we were willing to overlook it. Sometime toward the beginning of August (roughly 4 months after signing the contract), work just stopped. Again, when we would reach out to Mark asking about the status of our project we would be told, “I’ll have an action plan later this afternoon” or “we want to get everything we done we can this week” or “the crew will be there tomorrow and we will be working all week on your project trying to finish”. In the meantime, nothing would be done and we would repeat the process. This went on for over 3 weeks, during this time there was absolutely no work done. Large piles of construction trash and building materials sat in our yard during this time. A great deal of the usable wood began to warp and I am sure that ultimately materials had to be tossed from being left in the elements for so long. After a couple weeks I finally moved a significant portion of the usable wood up onto the deck so it would at least be partially protected. We found out that there was an issue with the electrical and Mark had decided to let Crew #1 go as they were not meeting his expectations, but it was not communicated to us until the end of the over 3 week period. A second crew then arrived who Mark said usually only did work for him on the south side of Indy (we live in Lebanon), but he wanted to get our project back on track. There seemed to be little to no communication between the crew and Mark on what they were supposed to work on so we had to explain to them what was in the contract to be completed. Crew #2 also started making good progress, they finished the cedar siding, got the rest of the windows installed in the sunroom as well as installing the sunroom ceiling. About this time, which was at the beginning of September we had a separate crew come out to do the drywall. Mark recommended them very highly. As it turned out, the drywall was not properly installed or insulated (in some walls there was no insulation), and ultimately it had to be taken down and redone by Crew #2. Crew #2 seemed to be doing a really good job and we were quite pleased with their progress and the quality of work they were doing for us. They were replaced by Crew #3 sometime in mid-September. We were never told why they were replaced, but Crew #3 was much closer to where we lived so I assume that had something to do with it. Much like when Crew #2 started, there seemed to be little communication between Crew #3 and Mark on what they were supposed to work on. So we again had to explain what was in the contract to be completed. All through the process, the commitment issues mentioned previously continued. We were not as happy with the quality of the work done by Crew #3 as we had been by Crew #2 (or even Crew #1), but they did finally complete for the project for us and after (3) failed attempts we finally received a pass from the building inspector on his final inspection. When Crew #3 decided they were finished they never came back, we communicated multiple times with Mark about the remaining punch list items to no avail and ultimately decided to finish most of the small punch list items ourselves instead of waiting any longer for them to finish (clean up, sanding / finishing drywall, etc.). We love the way the sunroom and covered porch area turned out. From contract signing until the end it took a little over six months, but in Mark’s defense he did agree to let us add a brand new window in the dining room of our house to tie everything together at no cost to us as appreciation for our patience. There are things that we liked about Mark’s company and things we didn’t, I have tried to summarize each category as follows: Positives • Price seemed reasonable • It is truly a custom build, no problem with changes we had at any point • Love the way it turned out, looks amazing • Mark seemed to genuinely care about the quality of the product he was delivering to us (he replaced the cedar shakes that had been installed by Crew #1 because he wasn’t happy with the quality Negatives • Our project seldom felt like it was a priority, part of the reason it took so long was because they were over committed on other projects • Commitment Issues (addressed previously) • Construction Trash left in our yard for months • We cleaned up inside more than they did, I understand drywall work is messy. They never swept up any of the dust and they didn’t clean up any of the clumps of dried drywall mud all over the floor. • We finished some of the minor punch list items, just to be done."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+70

Recommended by84%of homeowners
...
Showing 1-10 of 100
Ceramic Tile questions, answered by experts

Larger tiles can be difficult to install because they’re heavier and bulkier than their smaller counterparts, which makes them harder to haul around and put in place. Plus, if you don’t install the tiles correctly, they could crack or break. For these reasons, it’s best to hire a professional for large-format tile installation.

Add a T-shaped spacer to each corner of a tile when placing it. You’ll want to nudge the tiles closer together so the spacers are touching each corner. When you’re done installing your tile, you can remove each spacer, wash them, and use them for your next project.

Penny tile should be sealed to protect the grout from moisture and keep stains from damaging the look of the tile. If penny tile is in a humid or high-traffic area, like a bathroom, kitchen, or entryway, it needs sealant. Any type of tile and grout is best maintained with a sealant reapplied by a pro every one to two years.

Yes, but you should only put tile directly on drywall in smaller areas that don’t experience excess moisture. For example, a small kitchen tile backsplash could work, but installing tile directly on the drywall in a bathroom or other chronically damp area is not a good idea. Either way, a cement backer board is a far more reliable solution, as drywall is susceptible to moisture and can warp or cause your tiles to crack.

Your floors should be completely level for tile, otherwise you risk damaging the tiles in the future. When there are even small gaps or hills in the subfloor beneath the tile, this puts more pressure on the tile when you walk around on the floor. With repeated traffic, the tiles are at risk of cracking, and you’ll have to deal with tile repairs sooner than if the floor was completely level.

The Tipton, IN homeowners’ guide to ceramic tile services

From average costs to expert advice, get all the answers you need to get your job done.

What do you need done? We’ll find top pros.
  • 🌱 "Mow a small front yard"
  • 🛠 "Fix a leaking pipe under the sink"
  • 🏠 "Repair shingles on an asphalt roof"