Top-rated paving pros.

Get matched with top paving pros in Hagerstown, IN

Enter your zip and get matched with up to 5 pros

Need a pro for your paving service project in Hagerstown, IN?

Select your specific project to find the pro for you.

Find Paving pros in Hagerstown

Avatar for Hale's Dirty Work, LLC
Hale's Dirty Work, LLC
5.0(
10
)
Gravel or Loose Fill Paving - Install, Spread or Scrape

Serving Hagerstown, IN and surrounding areas

Approved

In business since 2022

Free estimates

Small jobs welcome

"Excellent work! Reasonably priced. Fast service. Very good and easy communicator! I highly, highly recommend his work. He offered to follow-up after a time to make sure it is as should be. Great person!"
Random Dirty Work
Land clearing food plots
Field tile repair
Pond repair
Making of baseball field

+27

Response time8 hrs
Response rate93%
9 neighbors recently requested a quote
Avatar for Hoosier Dirt and Gravel LLC
Hoosier Dirt and Gravel LLC
5.0(
4
)
Gravel or Loose Fill Paving - Install, Spread or Scrape

Serving Hagerstown, IN and surrounding areas

In business since 2025

Free estimates

Emergency services offered

"Travis, the owner, came to my home for an estimate and explained the process that we needed to go through to fix our driveway. He gave suggestions on materials and equipment. As a young man I spent summers working excavation for my Grandfather, knowing what I learned from him I believe Travis knows what he is doing. We plan to have him come back soon to start the work."
Response time11 hrs
Response rate100%
...
Showing 1-10 of 56
Paving Services questions, answered by experts

The dimensions of a driveway apron vary based on local building codes, the width of your driveway, and the distance between the driveway and the road. On average, aprons range from 12 to 24 feet wide and 8 to 18 feet long. Typically, the end of the apron connected to the driveway matches its width—such as 10 to 12 feet for a single-car driveway—while the end at the street flares out to allow cars to turn in and out more easily. In some areas, you may not be responsible for the portion of the apron that extends beyond the sidewalk, but this depends on local laws.

Although you could try to lay stepping stones directly over grass, which speeds up the installation process significantly, this method often leads to a poor result over time. Even heavy paver stones will eventually slide or shift on top of the grass. Digging into the ground and following the steps we listed is the best way to lay stepping stones for a long-lasting result.

Depending on project size, typically 1 to 3 days, including preparation and installation.

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

An ideal driveway gradient is between 2% and 5%. Anything lower than 1% or higher than 15% can cause problems for your car or property. A driveway with less than a 1% slope increases your likelihood of flooding and water damage, while a driveway with a 15% grade or higher can be too steep for safe traveling.

The Hagerstown, IN homeowners’ guide to paving services

From average costs to expert advice, get all the answers you need to get your job done.