Top-rated above ground pool installation pros.

Get matched with top above ground pool installation pros in Filer, ID

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Filer, ID?

Select your specific project to find the pro for you.

Find Above ground pool installation pros in Filer

AnyTime Spas Service & Repairs
5.0(
1
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Filer, ID and surrounding areas

In business since 2018

Free estimates

Credit card accepted

We are a locally owned and operated company that values honesty and integrity in all aspects of our business. We offer a variety of Hot Tub, Pool, and Spa service including installs, repairs, and opening and closing services that are customizable to each individual property. We pride ourselves on the quality of our work as well as our commitment to outstanding results. We look forward to building lasting relationships with our clients and guarantee your satisfaction!

Recommended by100%of homeowners
Install Above Ground Pools questions, answered by experts

The best temperature to paint a pool deck is between 50 and 90 degrees Fahrenheit, because many paints and sealers require temperatures warm enough for the chemical reaction to take place for proper curing. The paint should not be allowed to freeze, and temperatures above 90 degrees can cause the paint to dry too quickly, also preventing the chemical reaction from following through to completion.

No, shock and chlorine are not the same thing, though they are related and both are used for pool maintenance. Regular chlorine, often in the form of tablets, is a sanitizer used for routine, day-to-day maintenance to keep a steady chlorine level. Pool shock, however, is a highly concentrated dose of chlorine used periodically for a more intense cleaning. It rapidly raises chlorine levels to fix issues like cloudy water or algae growth and also eliminates chloramines, which are byproducts of regular chlorination. Because their purposes and concentrations differ, they are not interchangeable, and proper pool care typically requires using both.

It depends. Your pool might need chlorine every day if the water is exposed to direct sunlight and you use your pool frequently. UV light and constant use will deplete chlorine levels more rapidly. Test your water regularly to see where your levels sit and adjust accordingly. Generally speaking, most homeowners need to add chlorine following a water chemical test about one to three times per week.

Yes, you can use chlorine tablets in a salt water pool. It is not the standard recommended practice, but if your pool needs more chlorine, adding tablets can help temporarily fix the problem. Only add as many tablets as needed to keep your chlorine level around three parts per million. After adding the tablets, test your water to determine the chlorine content.

Your contractor will need several days to several weeks as far as a timeline to install your semi-inground pool goes. Adapting an aboveground pool to be semi-inground by excavating and partially burying the liner, for example, will only take three to five days, while installing an in-ground pool with a poured concrete liner and building up the land around it will require several weeks. Keep in mind that the process of hiring a pool contractor and applying for permits can add several additional weeks to the total timeline.

The Filer, ID homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.