Top-rated above ground pool installation pros.

Get matched with top above ground pool installation pros in Kimberly, ID

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Kimberly, ID?

Select your specific project to find the pro for you.

Find Above ground pool installation pros in Kimberly

Avatar for American Home Shield – Home Warranty
American Home Shield – Home Warranty
3.5(
5,688
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Kimberly, ID and surrounding areas

In business since 1971

Credit card accepted

"One oven doesn't work at all ( my choice, see above), the "working" oven was never calibrated properly so using it is hit or miss. It's time to call American Home Shield to see about replacing the entire unit. I'm waiting to finish other home projects before calling them. I don't know if I'll request Greenway again."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Recommended by65%of homeowners
AnyTime Spas Service & Repairs
5.0(
1
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Kimberly, ID and surrounding areas

In business since 2018

Free estimates

Credit card accepted

We are a locally owned and operated company that values honesty and integrity in all aspects of our business. We offer a variety of Hot Tub, Pool, and Spa service including installs, repairs, and opening and closing services that are customizable to each individual property. We pride ourselves on the quality of our work as well as our commitment to outstanding results. We look forward to building lasting relationships with our clients and guarantee your satisfaction!

Recommended by100%of homeowners
Install Above Ground Pools questions, answered by experts

Rectangular pools are the most popular inground pool shape, due to their adaptability to different uses, from swimming laps to hosting parties. These pools can easily include other sought-after features, such as tanning ledges, waterfalls, sport nets, and more. Rectangular pools are also often easier to install and maintain, and prefabricated rectangular pools generally have a shorter installation time, so you can start enjoying your pool faster.

The most expensive part of building a pool is typically the excavation and labor, which can account for 25% to 50% of the total project cost. This is particularly true for inground pools that require significant excavation, potentially including the rental of large equipment, and extensive construction labor. In contrast, above-ground pools are generally less expensive as they typically do not require excavation and can be installed much more quickly. Concrete in-ground pools are among the most labor-intensive options.

Liquid chlorine is better for shock treatments or instances where you need to raise your chlorine levels quickly. Tablets are better for regular maintenance. Tablets take more time to dissolve but require less effort. You don’t need to measure out volume, and you can set them in a floater and let that do the work.

You can make your pool accessible to people with disabilities or mobility issues by adding a sloped entrance to the pool and including handrails at all entry and exit points. A pool lift, though expensive, makes it especially easy for people with all levels of mobility to enter and exit a pool safely. Upgrading your whole home to be more accommodating? Here are several tips to make your home more accessible for those with disabilities or those aging in place.

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

The Kimberly, ID homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.