Top-rated subcontractors.

Get matched with top subcontractors in Welaka, FL

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Welaka, FL?

Select your specific project to find the pro for you.

TRUSTED BY WELAKA, FL HOMEOWNERS

  • Average homeowner rating star icon4.3
    Average homeowner rating
  • Verified reviews icon177
    Verified subcontracting services reviews

Find Subcontractors in Welaka

Level Up Residential Construction LLC
New to Angi

Serving Welaka, FL and surrounding areas

Approved

Free estimates

Emergency services offered

Warranties offered

Hey everyone! I am extremely proud to announce that I have started my own residential construction company "Level Up Residential Construction LLC ". I am native and born and raised in St. Augustine. I love this community and know that there is a need for local people looking out for those who have and want.to make.this there home. We are here to help you Level Up whatever your needs are for your home. Please check me out on Facebook and Instagram.

Avatar for National HomeCraft LLC
National HomeCraft LLC
4.5(
191
)

Serving Welaka, FL and surrounding areas

In business since 1967

Free estimates

Emergency services offered

"The entire team at National HomeCraft earned 5 star rating starting with Kathy who responded right away on scheduling someone to come to our home for the free consultation. Followed then by Jeff Beback the representative who explained each step of the process to renovate our 30 year old shower. Demolition and then reconstruction with a beautiful acrylic shower was seamless with the work crew Scott and Brandon. They were punctual, hard working and very skilled at removing the old shower and installing the new. And we saved thousands going with National HomeCraft versus our first quote!! Overall an excellent experience start to finish!!"
All of the doors and windows were replaced by National HomeCraft.
Shower Replacement
The customer wanted a custom pattern created with the vinyl siding.
Metal shingles that look like real clay tiles. The color will last forever and the shingles will stand up to 200mph winds!
Shower with concrete wall pattern and black fixtures

+11

Recommended by97%of homeowners
Avatar for Zsolt Granite Corporation Inc
Zsolt Granite Corporation Inc
4.6(
37
)

Serving Welaka, FL and surrounding areas

In business since 2005

Free estimates

Credit card accepted

"Very personable, knowledgeable, and professional staff. Great selection, value, and outstanding workmanship. Couldn't be happier. They re-did my entire kitchen with quartz and porcelain countertops, my 3 bathrooms with quartz vanities, and my living room bar top with quartz. It was a big job, with very large and heavy pieces, but Zsolt got it all done in 3 days, including demolition. Everyone who now comes to my house is in amazed and probably a bit jealous.... lol Also, if worried about COVID-19, everyone at the office/Showroom wears face masks and the installers wear both face masks and gloves during installing. Highly recommend Zsolt Granite!"
Parade of Homes- Grand Award Winning Kitchen
Quartz Fireplace
AMC - MacGuffins Bar & Lounge
Additional Photos
Additional Photos

+17

Recommended by96%of homeowners
...
Showing 1-10 of 82
Subcontractors questions, answered by experts

A split-level home is one that has several staggered floors connected by short staircases, while a split floor plan separates the primary bedroom from the rest of the bedrooms. Split floor plans are most often found in single-story homes, while split-level homes are always at least two stories.

Yes, you can draw your own deck plans in many cases. However, you must know your local building codes and be familiar with carpentry principles. Even then, it's always best to run your plans by a professional contractor with experience building decks, whether you choose to DIY some of the build or not.

How long it takes to build an in-law suite will vary by type. The time it takes to build an addition will typically be less than for completely new construction. Expect to spend about two months if you convert a basement, attic, or other existing room in your home. New structures can take up to five months, plus up to two months to receive the required permits.

Blueprints are generally available for houses built after the early 1900s. Before then, detailed building schematics like blueprints were rarely used and even more rarely saved. If you have an older house and need blueprints, you can have a new set drawn up by an architect or draftsperson.

Framing is often the most expensive phase of building a house because it’s time-consuming and requires a lot of materials. It costs between $20,000 and $50,000 on average, depending on materials and labor costs. Before construction begins, it’s possible that purchasing land is the priciest step in the process. Some plots of land sell for $3,000, while others cost upwards of $150,000.

The Welaka, FL homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.