Top-rated concrete leveling pros.

Get matched with top concrete leveling pros in Ajo, AZ

Enter your zip and get matched with up to 5 pros

Need a pro for your concrete leveling project in Ajo, AZ?

Select your specific project to find the pro for you.

Find Concrete leveling pros in Ajo

Avatar for Arizona Foundation Solutions, LLC
Arizona Foundation Solutions, LLC
4.1(
49
)

Serving Ajo, AZ and surrounding areas

Approved

In business since 2000

Free estimates

Warranties offered

"Hector was very professional in providing estimates and answering question during during the survey. I would recommend him to others that might be considering similar services."
Walkway under the stairs
Close quarters
Hard at work
Prescott's Historic Courthouse
Gilbert Stemwall Repair - After

+24

Response time2 days
38 neighbors recently requested a quote
Recommended by79%of homeowners
Concrete Leveling questions, answered by experts

There is no real alternative to underpinning, although mudjacking and polyjacking are other repair methods that can add support from underneath your foundation. Rather than placing supportive piers under your structure, these involve pumping a material under your slab to lift a sunken section back into its original position. Polyjacking, in particular, is sometimes a suitable solution for stabilization issues under slab foundations, but underpinning is often accepted as the best and most permanent solution.

The polyurethane used for polyjacking will expand and cure in 15 to 30 minutes. After that point, your slab will be safe to walk on and even drive on in the case of a sidewalk or concrete driveway. Double-check with your concrete lifting specialist to confirm a curing timeline, as products can differ.

Pros often use mudjacking or polyurethane foam injection to level a sunken concrete patio. Both methods lift the slab by filling voids beneath it. After properly compacting the soil beneath it to prevent future settling, the concrete may need to be removed and re-poured for severe sinking.

Most projects take 1-3 hours, with immediate usability after completion.

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The exact time can vary depending on the size of the project. Because the slurry mixture contains cement, it must fully harden to ensure that added weight from walking, furniture, or vehicles won't shift the concrete slab. A professional contractor can advise you on when the surface is safe to use. For comparison, if you use polyjacking instead, the polyurethane foam can dry in just a few minutes, but it's best to wait about an hour before use.

The Ajo, AZ homeowners’ guide to concrete leveling services

From average costs to expert advice, get all the answers you need to get your job done.