Top-rated concrete leveling pros.

Best concrete leveling pros near Eloy, AZ

Enter your zip and get matched with up to 5 pros

Need a pro for your concrete leveling project in Eloy, AZ?

Select your specific project to find the pro for you.

Top-Rated Concrete leveling pros in Eloy - Updated Nov 2026

Smart Concrete. And Walls
2.9(
10
)
Concrete - Injection Leveling - MudjackingConcrete - Injection Leveling - Mudjacking - For Business

Serving Eloy, AZ and surrounding areas

In business since 1985

Free estimates

Emergency services offered

"Superb Job! Planning to completion was done in a timely manner. Job was done accurately as discussed and looks outstanding. Will hire to do the concrete slab in the back yard along with the building of a porch. Competitive pricing! Beat three other contractors. Definitely will recommend to friends."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+13

Recommended by66%of homeowners
Showing 1-10 of 15
Concrete Leveling FAQs, answered by experts

Most projects take 1-3 hours, with immediate usability after completion.

Yes, expanding foam (also known as polyurethane foam) can lift concrete. This approach, called polyjacking, involves injecting the foam rather than concrete slurry to fill voids and raise the concrete slab back into place. It’s often faster and requires smaller drill holes than traditional mudjacking, though it may come at a higher cost. Some contractors also prefer polyjacking over mudjacking for more damaged and delicate slabs.

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The total drying time can vary depending on the size of the project. Because the slurry mixture contains cement, it needs to harden fully to prevent the concrete slab from shifting under added weight. You should avoid walking on the concrete or placing heavy items like furniture or vehicles on the surface until it has fully set. Your concrete contractor can provide a precise timeline. As a point of comparison, if you opt for polyjacking, the polyurethane foam can dry in minutes, but it's recommended to wait about an hour before use.

Most states and municipalities don’t require concrete mudjacking companies to carry a specific license, but they usually need to have a general contractor’s license, and they should be fully insured. The only exception is if the mudjacking company provides foundation repairs as well, or if it offers mudjacking for home foundations. In that case, they will typically need a foundation repair contractor’s license. You can check state requirements and then use Angi’s license lookup tool to confirm that a company is properly licensed to provide mudjacking services in your area.

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The exact time can vary depending on the size of the project. Because the slurry mixture contains cement, it must fully harden to ensure that added weight from walking, furniture, or vehicles won't shift the concrete slab. A professional contractor can advise you on when the surface is safe to use. For comparison, if you use polyjacking instead, the polyurethane foam can dry in just a few minutes, but it's best to wait about an hour before use.

The Eloy, AZ homeowners’ guide to concrete leveling services

From average costs to expert advice, get all the answers you need to get your job done.