Top-rated subcontractors.

Get matched with top subcontractors in Roanoke, AL

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Roanoke, AL?

Select your specific project to find the pro for you.

TRUSTED BY ROANOKE, AL HOMEOWNERS

  • Average homeowner rating star icon4.3
    Average homeowner rating
  • Verified reviews icon72
    Verified subcontracting services reviews

Find Subcontractors in Roanoke

Complete Home Repair
4.9(
38
)
Major Home Repairs (General Contractor)

Serving Roanoke, AL and surrounding areas

In business since 1995

Free estimates

"Al was very kind and straightforward. He did initially tried to charge me a little more than the average for the area but after I explained that I had done research for the labor costs and already have materials he got the cost significantly also mention that you found him on Angie's List. I am very pleased with how the floor looks they did a very quick job some very weird layouts because my house is strange though I love its eccentricity. Though it takes a long time to book him because he is usually busy he works very fast, but not sloppily, and the work was completed in approximately 4 days with a small crew of three one of whom was his son. we are almost done with most of our work but I'm a call him back for some minor repairs thing that needs to be completed the only complaint I have is that at least one of the workers is a smoker and I found a few cigarette butts in my yard or in the bushes next to where they were sawing which was not very pleasant. That is a minor complaint though because as contractors go they show up on time and they get the work done and they get the work done well; which, I don't know if you use very many contractors, is unusual and a good thing. Overall I would use them again in a heartbeat and I would suggest them to other people.
"
luxury
warmth
durable
Recommended by93%of homeowners
Showing 1-10 of 41
Subcontractors questions, answered by experts

Designs typically take 2-6 months, depending on factoring, project size, and customization needs. Larger or more complex designs may require additional time for approval and revisions.

Most Greek Revival architecture homes are one and a half to two stories, depending on the footprint, which sets them apart from some Federal architecture homes that are three stories. The gabled roof on the second floor can sometimes cut into the living space, especially on smaller homes of this style, which leaves a much smaller living area upstairs.

The early stages of building a house are harder than the later stages; laying the foundation and framing the house are two of the most challenging steps. However, it varies for everyone. Some people have difficulty installing HVAC, plumbing, and electricity, while others find it harder to plan the house and secure the necessary permits. 

Adequate storage, workspaces, and energy-efficient systems are key considerations.

Costs vary depending on project complexity and scope. Architects generally charge a percentage of the total budget or an hourly rate for their services.

The Roanoke, AL homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.