Top-rated subcontractors.

Get matched with top subcontractors in Heflin, AL

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Heflin, AL?

Select your specific project to find the pro for you.

TRUSTED BY HEFLIN, AL HOMEOWNERS

  • Average homeowner rating star icon4.4
    Average homeowner rating
  • Verified reviews icon273
    Verified subcontracting services reviews

Find Subcontractors in Heflin

Complete Home Repair
4.9(
38
)

Serving Heflin, AL and surrounding areas

In business since 1995

Free estimates

"Mr Webb's work is very good and my wife and I are very pleased with his work, cost and work time.  We have used Complete Home Repair for several small repairs this year and have always been very pleased.  He shows up when he says he will and gets the job done.  So when we planned this latest project, we did not hesitate to call them and in fact did not even think about any one else.
We have in mind some other projects around here and will certainly call them first.  We found Complete Home Repair on Angie's list and have even found others for HVAC etc.
"
luxury
warmth
durable
Recommended by93%of homeowners
Avatar for Foundation Repairs & Home Improvements Inc
Foundation Repairs & Home Improvements Inc
4.6(
63
)

Serving Heflin, AL and surrounding areas

In business since 1972

Free estimates

Credit card accepted

"This company is owned and run by "old school" professional people who do what they say they will do. Everyone from the office staff to the crew that did the work to the owner Greg McBride were wonderful to work with. I wish I had know about them 4 years ago and I would have used them for everything in and around my home. I trust them and will use them in the future."
Before
After
After
Additional Photos
Additional Photos

+20

Recommended by91%of homeowners
Rent-A-Man
4.7(
55
)

Serving Heflin, AL and surrounding areas

In business since 1994

Emergency services offered

Credit card accepted

"After he figured out where the leak was coming from, he found that the whole faucet needed to be replaced. Had to travel 15 minutes away just to get a new one.  Cleveland is a very little town. I had an appointment so I had to leave him by his self to complete job. When I got back home everything was done and it looked good and no longer leaks. Thank you so much.
"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+6

Recommended by94%of homeowners
Avatar for Advanced Quality Construction
Advanced Quality Construction
4.7(
7
)

Serving Heflin, AL and surrounding areas

Free estimates

Credit card accepted

"The owner was very professional from start to finish. He was a very hard worker and showed up exactly when he said he would be there. I couldn't be any happier with my front porch, it turned out beautifully. I highly recommend this company!"
Front Porch
Garage Doors Project
Countertops & Cabinets Project
Front Porch
Garage Doors Project

+26

Recommended by85%of homeowners
Showing 1-10 of 47
Subcontractors questions, answered by experts

The most common scale for residential blueprints is 1/4 of an inch equals one foot. This scale is the most popular because it’s easier for everyone involved, from professionals to homeowners, to understand the building’s actual dimensions. Also, it allows blueprints to have the necessary details without cluttering the page.

The early stages of building a house are harder than the later stages; laying the foundation and framing the house are two of the most challenging steps. However, it varies for everyone. Some people have difficulty installing HVAC, plumbing, and electricity, while others find it harder to plan the house and secure the necessary permits. 

Yes, designers collaborate with contractors and engineers to ensure a smooth construction process.

It usually takes around four to six months to build and install a modular home, although your timeline could go up to around eight months if there are delays in the manufacturing or permitting process. Heavy site preparation and foundation pouring can extend that timeline if you need them, as can customizations you want for your modular home. Your modular home company should be able to provide an estimate for the construction timeline before you sign any contracts or agree to any work.

Yes, designing builds to fit space constraints and meet functional needs.

The Heflin, AL homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.