Top-rated subcontractors.

Get matched with top subcontractors in Coaling, AL

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Coaling, AL?

Select your specific project to find the pro for you.

TRUSTED BY COALING, AL HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon430
    Verified subcontracting services reviews

Find Subcontractors in Coaling

Avatar for Dream Baths Of Alabama
Dream Baths Of Alabama
4.1(
74
)
Major Home Repairs (General Contractor)

Serving Coaling, AL and surrounding areas

In business since 1992

Free estimates

"They placed cloths throughout the house each day they worked to protect our floors. They removed and replaced everything in our bathroom with expertise. This includes our bathroom floor, vanity/sink, removing tub and installing a complete show with glass doors. They also painted and installed a light/fan combo above our shower. We love everything!"
Dream Baths

+15

Recommended by82%of homeowners
Juan Garza Masonry and Concrete
4.6(
13
)
Major Home Repairs (General Contractor)

Serving Coaling, AL and surrounding areas

In business since 2020

Free estimates

Credit card accepted

"Work started when promised. Hard fast workers. Moved quicker than I thought. Actual pour was delayed due to a concrete truck malfunction, but when delivery was rescheduled, they worked to finish before dark. This was not an issue or inconvenience for me. Very happy with the way it turned out and how they tied it in to my current drive that was on a slope."
Concrete Pouring and Repair Project
Recommended by100%of homeowners
...
Showing 1-10 of 72
Subcontractors questions, answered by experts

Costs depend on project complexity, software requirements, and the draftsperson’s experience.

It usually takes around four to six months to build and install a modular home, although your timeline could go up to around eight months if there are delays in the manufacturing or permitting process. Heavy site preparation and foundation pouring can extend that timeline if you need them, as can customizations you want for your modular home. Your modular home company should be able to provide an estimate for the construction timeline before you sign any contracts or agree to any work.

While it’s never too early to start planning for a major home improvement project like a home addition, give yourself at least a month or two to plan and design your addition, find a contractor, and get the permits in order. For larger projects like a second-story addition that require designing with an architect, plan on three to four months of preparation.

Depending on what the blueprints are for, a qualified draftsperson, contractor, or architect can draw them up. In some cases, including specialty permitting for a build, you may be required to use a licensed architect. 

In many cases, a blueprint drawn up by a certified professional is required before a city or municipality approves a permit. 

When you think about Arts and Crafts-style homes, you probably think of a Craftsman house or a bungalow-style Craftsman. Craftsman is one of the major styles developed during the Arts and Crafts movement, but it checks most boxes. Craftsman houses have low-pitched roofs, exposed rafters, open floor plans, and stunning wood finish.

The Coaling, AL homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.