Top-rated subcontractors.

Get matched with top subcontractors in Fosters, AL

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Fosters, AL?

Select your specific project to find the pro for you.

TRUSTED BY FOSTERS, AL HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon435
    Verified subcontracting services reviews

Find Subcontractors in Fosters

Avatar for Luke's Painting Company
Luke's Painting Company
4.4(
40
)
Major Home Repairs (General Contractor)

Serving Fosters, AL and surrounding areas

In business since 2017

Free estimates

Credit card accepted

"Luke went above and beyond to restore the beauty of our historic with an emaculate paint job. He is professional, courteous, detail-oriented, and thorough. We plan to hire him for all of our future painting needs."
After.. what an amazing difference!
After picture of the beautiful entryway
after picture of the fence
after.. beautiful color!
Exterior Painting in Sellers, SC

+76

Recommended by93%of homeowners
Juan Garza Masonry and Concrete
4.6(
13
)
Major Home Repairs (General Contractor)

Serving Fosters, AL and surrounding areas

In business since 2020

Free estimates

Credit card accepted

"Work started when promised. Hard fast workers. Moved quicker than I thought. Actual pour was delayed due to a concrete truck malfunction, but when delivery was rescheduled, they worked to finish before dark. This was not an issue or inconvenience for me. Very happy with the way it turned out and how they tied it in to my current drive that was on a slope."
Concrete Pouring and Repair Project
Recommended by100%of homeowners
Critter Control of Birmingham
4.5(
11
)
Major Home Repairs (General Contractor)

Serving Fosters, AL and surrounding areas

In business since 1983

Emergency services offered

Credit card accepted

"We first contacted them about a few months ago. They came out and set some traps and we never really got anything. So we went ahead with the second plan which cost us about $1000 to get stuff put up all over the house, but we still have critters. So, now they have done the last thing that they said that they could do. It is still covered because they said that it would guarantee the price that we agreed for a year. I felt that it should have been 3 years for that price. One thing that I wasn't real happy about was that there was a little bit of over sale of what they could do when I made my original contact with them. We were hearing noises in between the walls of our house and not only in the attic. They told me that they knew exactly what was going on in my house when I called them, but they said that they couldn't make out what was going on when they came out. So, we are waiting to see as to what the process is and we have decided to pay a part of the money until our house becomes free from critters. They are currently in my house doing the work and they keep coming back when I call. We have already paid them $350 for the first contact. The price for putting up flashing in between the roof and the siding of the house is $1100. They have been pretty responsive except for once when they didn't come for a couple of days when I contacted them. They are punctual, as they come when they say that they are going to come. Most of the guys have been pretty professional. I have to wait and see as to how it turns out. I would continue to use their services in the future too."
Recommended by100%of homeowners
...
Showing 1-10 of 64
Subcontractors questions, answered by experts

British architect John Nash is credited with creating the Italianate style of architecture. The style was further popularized in the U.S. by landscape architect Andrew Jackson Downing and architect Calvert Vaux. The style spread across the U.S. due to Downing’s popular book on the style and the availability of plans and materials due to the mass production of the Industrial Revolution.

Designing a building takes 2-6 months, depending on project size, required permits, and revisions.

Custom homes can take an average of 18 months to build, mainly due to the lengthy design process, and most projects take somewhere between 12 and 24 months. When you work with the right custom home builders near you, they can help you map the road ahead and understand what can speed up or delay the timeline. Choosing locally available materials, for example, can speed things up without losing that customized touch.

The average build timeline for a home is between six and 12 months, with timelines pushing toward the upper end of that range if you’re creating a custom design or need a lot of land preparation before getting started. Hiring a general contractor or a custom homebuilder will help speed up the process, as you’ll see fewer delays between different parts of the build process getting done.

How long it takes to build an in-law suite will vary by type. The time it takes to build an addition will typically be less than for completely new construction. Expect to spend about two months if you convert a basement, attic, or other existing room in your home. New structures can take up to five months, plus up to two months to receive the required permits.

The Fosters, AL homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.