Top-rated contractors.

Get matched with top contractors in Banner, WY

Enter your zip and get matched with up to 5 pros

Need a pro for your contractor service project in Banner, WY?

Select your specific project to find the pro for you.

Find Contractors in Banner

JMG Construction LLC
5.0(
4
)
Major Home Repairs (General Contractor)

Serving Banner, WY and surrounding areas

Approved

In business since 2017

Free estimates

Credit card accepted

"I really value working with these professionals. A testament of our great working relationship are the number of JMG projects finished over the last five years. I am always glad to start a new project with them and know that every aspect will be handled with care, consideration and respect for me and the property. I highly recommend them without any reservations."
Response time1 day
11 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for Cothren Plumbing & Construction
Cothren Plumbing & Construction
5.0(
10
)
Major Home Repairs (General Contractor)

Serving Banner, WY and surrounding areas

In business since 2013

Free estimates

Emergency services offered

"Alex was quick to get in and out. Got the job done right the first time and his prices are very competitive! He is our go to guy for literally just about anything we need done from plumbing to construction to appliance repair. You name it, he does it!"
Lovell Senior Center
Lovell Senior Center
New Deck & Concrete
New Deck & Concrete
New Deck & Concrete

+2

Response time3 hrs
Response rate100%
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Major Home Repairs (General Contractor)

Serving Banner, WY and surrounding areas

In business since 2006

Credit card accepted

"I never contacted the provider or used this service in anyway. I have to
write this review so that the request to write this review stops
popping up.
The rating is bogus as it is required to be able to submit.
"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for Jill Seidner Interior Design
Jill Seidner Interior Design
3.5(
89
)
Major Home Repairs (General Contractor)

Serving Banner, WY and surrounding areas

In business since 2006

Credit card accepted

"Once I sent her all the measurements, it took her a little while to get the options back to me.  Overall, they're good designs.  However, they're very simplistic and give general ideas for space planning.  I was hoping to have a better idea for sizes of furniture for the space and some variations on staging.  
Jill was very responsive when I did have a question.  I'm not sure how helpful it is to have a virtual design done.  If we lived in similar cities, I'd probably use her again for help with additional designs.
"
Recommended by55%of homeowners
Showing 1-10 of 25
Unfinished Carpentry questions, answered by experts

Framing most homes takes anywhere between five and eight weeks to complete. You’ll need to account for inclement weather conditions, material shipment times, the number of crew members, and the weight of your materials. If the weather is too hot, wet, or cold for the installation, this process could take closer to eight weeks.

When deciding whether to use nails or screws for framing, the specific needs of the project must be taken into account. Nails have long been the go-to option for framing due to their affordability, ease of installation, and ability to withstand shear forces. They are perfect for structural framing projects where fast assembly is essential. In contrast, screws offer exceptional holding power and are particularly useful in situations requiring increased strength and resistance to pull-out forces. For projects that prioritize accuracy and long-lasting quality, screws may be the preferred option, though nails remain a dependable and efficient choice.

Accurate measurements, sturdy materials, and seamless integration with other structures.

When deciding if you should use 2x6 or 2x8 deck joists, consider the size of the deck, joist spacing, and materials. Larger decks, larger-spaced joists, and weaker wood all require more support, meaning they need larger joists. For example, 2x8 redwood joists spaced 16 inches apart can only safely span up to 10 feet and 7 inches. On the other hand, 2x10 southern pine joists spaced 12 inches apart can be as big as 16 feet and 2 inches. If you aren’t sure what size joist is best for your project, speak with your deck builder.

In framing, studs are placed at 16-inch intervals to coincide with the typical spacing of wall materials such as drywall or plywood. This spacing is called "on-center" and is necessary for maintaining structural stability and efficient use of materials. The 16-inch spacing also helps to distribute the weight evenly across the building's structure. For those looking to cut material costs and improve energy efficiency, 24-inch stud spacing can be employed through a method called "advanced framing". This requires careful planning and adherence to local building codes to ensure structural integrity.

The Banner, WY homeowners’ guide to contractor services

From average costs to expert advice, get all the answers you need to get your job done.