Top-rated backsplash installation pros.

Get matched with top backsplash installation pros in East Dailey, WV

Enter your zip and get matched with up to 5 pros

Need a pro for your backsplash installation project in East Dailey, WV?

Select your specific project to find the pro for you.

Find Backsplash installation pros in East Dailey

Avatar for Remodel USA
Remodel USA
3.6(
203
)

Serving East Dailey, WV and surrounding areas

In business since 1987

Free estimates

Credit card accepted

"We recently remodeled our master bathroom and after extensive research we selected Remodel USA. We initially met with Martin Rabone who spent several hours showing us the various options available and assisting us in making preliminary selections. We were directed to various distributors who work with Remodel USA to make tile, granite and fixture selections. We found all of them to be extremely helpful. All parts of the project were carefully worked through with no work beginning until all the materials were available. We were told the project would take 2 weeks from start to finish and were pleasantly pleased that they finished a day early. Our production manager, Percy Melendez, assisted in final choices of materials prior to ordering and insured that we had the correct items and was meticulous in overseeing the two workers, appearing frequently and phoning often to be sure we were happy with everything. Two people were assigned to do the entire instillation except for the frame less shower glass. This meant that there was no waiting for various people who might be delayed by other jobs and the two knew how to do the tile work, electrical work, and plumbing. Both workers were extremely attentive to making sure that our carpets and furnishings were protected and provided advice about placement of grab bars and the showers. They approached us to make final placement decisions before instillation and did everything possible to make certain we would have the master bathroom we envisioned. The frame less shower surround was also expertly installed. All workers cleaned up the area daily and left no construction or other trash behind. Overall, we were exceptionally pleased with our entire experience and highly recommend Remodel USA. We will definitely consider them for future home projects as they do additions, windows, and other things."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+67

Recommended by74%of homeowners
Avatar for Jill Seidner Interior Design
Jill Seidner Interior Design
3.5(
89
)

Serving East Dailey, WV and surrounding areas

In business since 2006

Credit card accepted

"They did a good job. She had to submit like a photo but my daughter had them work on the central are of the loft. The deal was for one room. She got a lot of good ideal from her and it was worth it for her. They were professional and I did not hear anything negative."
Recommended by55%of homeowners
Avatar for Barnett & Son Services
Barnett & Son Services
3.3(
13
)

Serving East Dailey, WV and surrounding areas

In business since 2009

Emergency services offered

"Roofing was installed however the clean-up promised with the contract was lax.  Roofing removed from the job completed in July was not removed from the yard in September.  I contacted the contractor the weekend of September 5th and was old they would look at their schedule to see when they could come and pick it up.  Now it is mid-September and it is still there.
"
Additional Photos
Additional Photos
Additional Photos
old bath room
bath room after demo

+2

Recommended by75%of homeowners
Backsplash Installation questions, answered by experts

Tile shouldn’t be set tight against the tub. Bathtubs can expand when filled, and they can shift slightly with the weight of occupants. For this reason, it’s important to leave a slight gap between the bathtub and the first row of tile. Aim for a narrow gap of approximately 1/16 of an inch, filled with caulk, to allow for this expansion and movement while still allowing for tile shower waterproofing.

Technically, you can start tiling in a corner and work your way out. However, it's not traditionally how tiling is done. Instead, work from the bottom middle of the wall. Tile out the entire row with whole tiles before moving on to the next row. Once you finish installing all of the whole tiles, then you focus on tiling the corners.

You can let the tile sit without grout. Don’t panic if there’s a delay between installing the tiles and grouting. A substantial stoppage isn't a problem, provided you keep the tile surface clear of dust and debris. Also, avoid walking over less stable ungrouted floor tiles as they are more prone to premature cracking and shifting. 

Glazed ceramic tiles don’t need to be sealed because the glazing already offers some protection against moisture. Unglazed ceramic tiles need to be sealed to keep the porous tile safe from moisture and staining. However, both types of tile can benefit from sealing. Sealant can make the tiles easier to keep clean and offer more resistance to water, spills, and stains.

No, tiling over painted walls or wallpapered surfaces is generally not recommended. Textured surfaces and paints will affect the adhesive, possibly causing tiles to lift or fall off. Painted walls with a semi-gloss or high-gloss finish are particularly difficult for adding tiles. It’s wise to strip the paint first if you install the tiles to drywall, although it’s still best to opt for a cement backer board.

The East Dailey, WV homeowners’ guide to backsplash installation services

From average costs to expert advice, get all the answers you need to get your job done.