Top-rated backsplash installation pros.

Get matched with top backsplash installation pros in Belington, WV

Enter your zip and get matched with up to 5 pros

Need a pro for your backsplash installation project in Belington, WV?

Select your specific project to find the pro for you.

TRUSTED BY BELINGTON, WV HOMEOWNERS

  • Average homeowner rating star icon4.2
    Average homeowner rating
  • Verified reviews icon12
    Verified backsplash installation services reviews

Find Backsplash installation pros in Belington

Avatar for Barnett & Son Services
Barnett & Son Services
3.3(
13
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For Business

Serving Belington, WV and surrounding areas

In business since 2009

Emergency services offered

"Mr. Barnett came within a few hours of our call for service. He was friendly and knowledgeable about the issue. He suggested that we update our electrical and we asked him to give an estimate and are pleased with his quote, the price seems reasonable. We would refer him to others for their electrical problems."
Additional Photos
Additional Photos
Additional Photos
old bath room
bath room after demo

+2

Recommended by75%of homeowners
Backsplash Installation questions, answered by experts

Regardless of the material, basic square tiles will never go out of style. Neutral colors like white, grey, beige, and black will always be in demand in residential and commercial settings. Certain designs, like herringbone and hexagonal patterns, are considered timeless. Porcelain and porcelain-like tiles will also never go out of style.

It’s easiest to start from an edge as it gives you a straight line. A problem may arise if your edge doesn’t line up perfectly, in which case it’s best to start from the center. Some think that starting tile from the center adds a focal point in the center of the hearth. 

The process takes two to four days, depending on the size of the area and your experience level. The first day involves assessing and prepping the existing tile, while the second day is for laying the new tile. This may take longer in complex areas. After letting the adhesive dry for 24 hours, grouting and sealing can be completed on day three. For larger projects or intricate tile patterns, expect the timeline to stretch a bit longer. Also, proper drying time between steps is essential for long-lasting results, which extends the project’s time.

Your floors should be completely level for tile, otherwise you risk damaging the tiles in the future. When there are even small gaps or hills in the subfloor beneath the tile, this puts more pressure on the tile when you walk around on the floor. With repeated traffic, the tiles are at risk of cracking, and you’ll have to deal with tile repairs sooner than if the floor was completely level.

Yes, even if you’re being careful, removing tile can damage your drywall to some degree. However, you can minimize the damage done to it by eliminating a majority of the grout and taking your time prying each tile off. Also, it's worth noting that you might have more drywall damages to deal with if your tile is set into the mortar.

The Belington, WV homeowners’ guide to backsplash installation services

From average costs to expert advice, get all the answers you need to get your job done.