Top-rated backsplash installation pros.

Get matched with top backsplash installation pros in Belington, WV

Enter your zip and get matched with up to 5 pros

Need a pro for your backsplash installation project in Belington, WV?

Select your specific project to find the pro for you.

TRUSTED BY BELINGTON, WV HOMEOWNERS

  • Average homeowner rating star icon4.2
    Average homeowner rating
  • Verified reviews icon12
    Verified backsplash installation services reviews

Find Backsplash installation pros in Belington

Avatar for Barnett & Son Services
Barnett & Son Services
3.3(
13
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For Business

Serving Belington, WV and surrounding areas

In business since 2009

Emergency services offered

"Mr. Barnett came within a few hours of our call for service. He was friendly and knowledgeable about the issue. He suggested that we update our electrical and we asked him to give an estimate and are pleased with his quote, the price seems reasonable. We would refer him to others for their electrical problems."
Additional Photos
Additional Photos
Additional Photos
old bath room
bath room after demo

+2

Recommended by75%of homeowners
Backsplash Installation questions, answered by experts

How long painted tiles last ultimately comes down to the quality of the paint job and how much wear and tear the tiles get. It’s possible the paint job will only last about six months if the tiles are in a high-traffic area and they weren’t properly cleaned, sanded, and primed prior to painting and sealing. Well-painted tiles in a low-traffic area should last at least a year.

On average, tiling a bathroom involves about 12 hours of labor, usually spread over two to three days to accommodate prep work and curing times. A professional tiler can often complete the installation in 6 to 8 hours, whereas a DIYer might take 10 to 16 hours. The total project time is influenced by factors like the bathroom layout, tile type, and necessary prep work, such as removing old tile. The process includes specific timelines for different areas; for example, tiling a floor takes about six hours, while a shower area can take six to ten hours. It is essential to allow for adequate curing time—typically 24 hours each—for the mortar, grout, and caulk, which is why the project extends over several days.

While you shouldn’t use thinset mortar on its own as a floor leveler, it can work alongside other products to help level floors. For instance, you could start with a self-leveling compound, let that dry, then apply backer board with thinset mortar to help fully even out the floors ahead of laying tile.

Glass tile is one of the easiest materials to maintain. It is both stain and water-resistant, making it easy to clean and incredibly durable. This also makes it resistant to mold and mildew. However, make sure it’s kept clean, otherwise, your grout might start to degrade. Glass is liable to scratch, so ensure you’re using non-abrasive materials and products, like soft sponges and wipes.

The rule tells you how to cut tile to install it in a corner. The 3/4/5 rule recommends that you should have 3 feet across on one straight line, four feet on the other perpendicular line, and 5 feet of length from the end of one of the lines to the other. You’re making a right triangle with the tile, and the hypotenuse (the line across from where the 3-foot lie and 4-foot line meet) should be 5 feet long.

The Belington, WV homeowners’ guide to backsplash installation services

From average costs to expert advice, get all the answers you need to get your job done.