Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Mauston, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Mauston, WI?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Mauston

Avatar for B&E Asphalt
B&E Asphalt
4.3(
19
)
Asphalt Paving - InstallGravel or Loose Fill Paving - Install, Spread or ScrapeAsphalt Paving - Install- For Business+3 more

Serving Mauston, WI and surrounding areas

Approved

In business since 1995

Free estimates

Emergency services offered

"Bob and his crew were very professional, and I’m very pleased with my new driveway. They were very respectful of my lawn and left everything in good order. They paid close attention to the areas where the asphalt joined my existing concrete and stone planter."
Asphalt menards
Menards
Menards
New Asphalt parkinglot
Sealcoating

+8

2 neighbors recently requested a quote
Recommended by50%of homeowners
State Wide Asphalt
4.5(
4
)
Asphalt Paving - InstallAsphalt Paving - Repair or PatchAsphalt Sealing+1 more

Serving Mauston, WI and surrounding areas

In business since 2019

Free estimates

"People are nice, family business. Small 2-3 man crew. They only have one truck, so I did end up with some cold joints in the asphalt and may have puddling. I was told I was getting 3" of asphalt, this is questionable as near the edges in some spot looks about 1.5". Some rough spots I hope it holds up. time will tell. don;t pay until they finish"
Response time3 days
Recommended by75%of homeowners
Showing 1-10 of 50
Asphalt Driveways questions, answered by experts

While some areas may allow for a slope of up to 20%, this is often the maximum slope for driveways, with a few exceptions of up to 25%. Other regions may have a maximum of 12%, 15%, or 18%, so check with your local building department to ensure you’re laying a driveway that is up to code for your location.

Overall, a paver driveway is considered the easiest to maintain because homeowners are able to do driveway repair one piece at a time without impacting the rest of the driveway. Unlike paved options, paver driveways contain individual stones that aren't physically connected. By comparison, you may need to reseal or redo a full asphalt driveway if just one portion sustains a significant crack.

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

Asphalt and tarmac are not the same thing. Traditional tarmac, short for tarmacadam, uses tar as a binder to hold crushed stone together. Asphalt uses bitumen—a byproduct of crude oil—to bind aggregate. Though tarmac was once a go-to for roads, asphalt has become the modern standard. And these days, most surfaces referred to as “tarmac” are actually asphalt. So, while the names may overlap, the key distinction lies in the binder—tar for tarmac and bitumen for asphalt.

The Mauston, WI homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.