Top-rated asphalt driveway pros.

Best asphalt driveway pros near Friendship, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Friendship, WI?

Select your specific project to find the pro for you.

Top-Rated Asphalt driveway pros in Friendship - Updated Nov 2026

B&E Asphalt
4.0(
14
)
Asphalt SealingAsphalt Paving - InstallAsphalt Paving - Install- For Business+3 more

Serving Friendship, WI and surrounding areas

Approved

In business since 1995

Free estimates

Credit card accepted

30 Years Experience \nYour satisfaction isn’t just a goal—it’s our promise. We pride ourselves on being more than just a provider; we are a partner you can trust. By combining thorough, high-quality work with a proactive approach to your concerns, we ensure every detail is handled with integrity and speed. We uphold the highest ethical standards so you can rest easy. Let’s get started—call us today! 608-567-9259 \n

Asphalt work
Asphalt work
Asphalt work
Asphalt work
Asphalt paving

+8

3 neighbors recently requested a quote
Recommended by72%of homeowners
Avatar for Beck's Excavating
Beck's Excavating
4.0(
2
)
Gravel or Loose Fill Paving - Install, Spread or Scrape

Serving Friendship, WI and surrounding areas

Approved

In business since 2019

Free estimates

Credit card accepted

"Leo was very accommodating, professional and personable through our entire project. His mantra is the job is not complete until we are completely happy with the outcome. He did and excellent job placing our 300+ foot gravel driveway and shed pad, ensuring it was just as we planned. We intend to engage him for future projects as we develop the property."
Excavation
Excavation
Excavation
Excavation
Excavation

+4

Response time4 days
Recommended by100%of homeowners
Avatar for B&E Asphalt
B&E Asphalt
4.3(
19
)
Asphalt Paving - InstallAsphalt Paving - Install- For BusinessAsphalt Paving - Repair or Patch+3 more

Serving Friendship, WI and surrounding areas

In business since 1995

Free estimates

Emergency services offered

"Bob and his crew were very professional, and I’m very pleased with my new driveway. They were very respectful of my lawn and left everything in good order. They paid close attention to the areas where the asphalt joined my existing concrete and stone planter."
Asphalt menards
Menards
Menards
New Asphalt parkinglot
Sealcoating

+8

Recommended by50%of homeowners
...
Showing 1-10 of 53
Asphalt Driveways FAQs, answered by experts

The driveway apron is a technical term referring to where a private driveway meets the public street. If there is a sidewalk in front of the house, the driveway apron is typically on the opposite side of the public sidewalk from the driveway itself.

Asphalt driveways last anywhere from 15 to 30 years, but if you don’t stay on top of repairs, you may find yourself spending extra to replace your driveway before its typical lifespan. Stay on top of repairing cracks and potholes by routinely inspecting your driveway once or twice a year. It’s a good idea to pressure wash your asphalt driveway at least once a year to keep it clean. Apply a sealer every one to five years, based on your climate.

Professionals restore the surface to a fresh, attractive finish by applying a new, even sealant layer.

There’s no single best asphalt grade—it all comes down to where and how it’s used. Highways and heavy-traffic roads need something tough, like polymer-modified asphalt (PMA) or Stone Matrix Asphalt (SMA). Local roads and parking lots rely on the Performance Graded (PG) system, chosen based on climate. A PG 64-28 mix, for example, handles a broad temperature range while simpler, more cost-effective mixes are typically enough for residential driveways. The best grade of asphalt depends on traffic, weather, and your budget, which is why a professional’s input is always a smart move before making a decision.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

The Friendship, WI homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.