Top-rated paving pros.

Get matched with top paving pros in Durand, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your paving service project in Durand, WI?

Select your specific project to find the pro for you.

Find Paving pros in Durand

Tru-Cut Lawn & Landscape
4.1(
11
)
Interlocking Pavers for Patios, Walks & Steps - Install

Serving Durand, WI and surrounding areas

In business since 2012

Free estimates

Credit card accepted

"h got the job done within a narrow window of time between the rain and their other projects. Though our project was small , they did it anyway. The only question we have is why they didn't install the border liner like they said they would. Don't know if they are done or not. We paid half done but haven't received a bill yet."
Response time2 days
Recommended by100%of homeowners
Showing 1-10 of 24
Paving Services questions, answered by experts

The most common causes of sunken pavers are poor base preparation and insufficient compaction. The problem could also be how your pavers were installed. If the soil beneath your patio or walkway wasn't compacted, it will pull pavers down as it settles. Additionally, using bare soil instead of making a paver bed with compacted gravel and sand can cause sinking over time. To fix sunken pavers, consider recompacting the base and addressing any drainage or erosion issues in the area.

Yes, pea gravel is good for driveways as long as your driveway isn’t built on a hill or any type of slope where it can slide. It’ll settle on a flat surface and create a suitable driveway over time, though some spreading initially will take place. If you're wondering how to make a gravel driveway in a high-rainfall area, using pea gravel could help you to cut down on costs needed for extra drainage solutions.

A driveway's lifespan varies by material. Asphalt driveways typically last 15 to 30 years, while concrete driveways last longer, between 20 and 50 years. The longevity of any driveway is affected by factors like extreme temperatures, heavy traffic, and the quality of maintenance. Regular upkeep, such as filling cracks, resealing the surface, and ensuring proper drainage, can help extend its life. For gravel driveways, regrading to fill in uneven areas every year or two is recommended.

Professional installers often include a deep layer of crushed gravel under permeable pavers to allow more runoff to soak through into the soil below. Many installations will include multiple layers of gravel, with coarser aggregate at the base and finer aggregate that sits on top of that bottom layer. Above the gravel, you’ll often find coarse sand that helps reduce paver shifting over time. Some permeable paver designs include a water collection system set into the gravel layer to route runoff to a safe area for disposal.

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

The Durand, WI homeowners’ guide to paving services

From average costs to expert advice, get all the answers you need to get your job done.