Top-rated concrete mudjacking pros.

Get matched with top concrete mudjacking pros in Amherst, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your concrete mudjacking project in Amherst, WI?

Select your specific project to find the pro for you.

Find Concrete mudjacking pros in Amherst

Avatar for Sure-Dry, LLC
Sure-Dry, LLC
3.8(
18
)
Concrete - Injection Leveling - MudjackingConcrete - Injection Leveling - Mudjacking - For Business

Serving Amherst, WI and surrounding areas

Approved

In business since 1994

Free estimates

Warranties offered

"Mike is great at the planning and cost estimate. He gets right to work and works efficiently, finishing in less time and at a lower cost than I had expected. And he does great work! I now have a well insulated garage, and can't thank Mike enough."
Sump Pump Installation
Waterproofing Basement Walls
Egress Window
Egress Window
Concrete Resurfacing

+18

Response time5 hrs
71 neighbors recently requested a quote
Recommended by60%of homeowners
AAE Concrete and Construction LLC
5.0(
1
)
Concrete - Injection Leveling - MudjackingConcrete - Injection Leveling - Mudjacking - For Business

Serving Amherst, WI and surrounding areas

Free estimates

Credit card accepted

AAE concrete and construction llc specializes in all things flatwork(stamped, colored, hard trowel finish, broomed). We also do offer some construction services such as decks, framing, and small remodels. We approach every job as of it was our own. No short cuts, done just the way it should be. No job nor too small AAE can handle them all.

Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+18

Response time4 days
Recommended by100%of homeowners
Z D Anderson Concrete
New to Angi
Concrete - Injection Leveling - Mudjacking - For Business

Serving Amherst, WI and surrounding areas

In business since 2022

Free estimates

Credit card accepted

We pride our company on reliability, great communication, integrity, and quality work. We are experts in our trade and will do our best to keep you as educated as we can on your particular task or project. We look forward to earning your business! Book with us online or feel free to give us a call today!

Concrete Mudjacking questions, answered by experts

Common issues with concrete that may require professional repair or resurfacing include cracks, spalling, uneven surfaces, and weather damage.

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The total drying time can vary depending on the size of the project. Because the slurry mixture contains cement, it needs to harden fully to prevent the concrete slab from shifting under added weight. You should avoid walking on the concrete or placing heavy items like furniture or vehicles on the surface until it has fully set. Your concrete contractor can provide a precise timeline. As a point of comparison, if you opt for polyjacking, the polyurethane foam can dry in minutes, but it's recommended to wait about an hour before use.

Yes, expanding foam (also known as polyurethane foam) can lift concrete. This approach, called polyjacking, involves injecting the foam rather than concrete slurry to fill voids and raise the concrete slab back into place. It’s often faster and requires smaller drill holes than traditional mudjacking, though it may come at a higher cost. Some contractors also prefer polyjacking over mudjacking for more damaged and delicate slabs.

There is no real alternative to underpinning, although mudjacking and polyjacking are other repair methods that can add support from underneath your foundation. Rather than placing supportive piers under your structure, these involve pumping a material under your slab to lift a sunken section back into its original position. Polyjacking, in particular, is sometimes a suitable solution for stabilization issues under slab foundations, but underpinning is often accepted as the best and most permanent solution.

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The exact time can vary depending on the size of the project. Because the slurry mixture contains cement, it must fully harden to ensure that added weight from walking, furniture, or vehicles won't shift the concrete slab. A professional contractor can advise you on when the surface is safe to use. For comparison, if you use polyjacking instead, the polyurethane foam can dry in just a few minutes, but it's best to wait about an hour before use.

The Amherst, WI homeowners’ guide to concrete mudjacking services

From average costs to expert advice, get all the answers you need to get your job done.