Top-rated concrete mudjacking pros.

Get matched with top concrete mudjacking pros in Tigerton, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your concrete mudjacking project in Tigerton, WI?

Select your specific project to find the pro for you.

Find Concrete mudjacking pros in Tigerton

Avatar for R&M Concrete Lifting
R&M Concrete Lifting
5.0(
4
)

Serving Tigerton, WI and surrounding areas

In business since 2024

Free estimates

Small jobs welcome

"The workers were friendly and cared about their work. They arrived on time and worked until dark. Never had home contractors more dedicated to their craft."
Driveway
Garage floor
Driveway
Driveway
Driveway

+1

Response time8 hrs
Recommended by100%of homeowners
Concrete Mudjacking questions, answered by experts

Mudjacking restores level surfaces, prevents further damage, and is more cost-effective than a full replacement.

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The total drying time can vary depending on the size of the project. Because the slurry mixture contains cement, it needs to harden fully to prevent the concrete slab from shifting under added weight. You should avoid walking on the concrete or placing heavy items like furniture or vehicles on the surface until it has fully set. Your concrete contractor can provide a precise timeline. As a point of comparison, if you opt for polyjacking, the polyurethane foam can dry in minutes, but it's recommended to wait about an hour before use.

A sinking foundation can be lifted, most often by installing piers to re-level and support the weight of the house. Depending on the cause and extent of the sinking, other methods to lift a foundation include underpinning and mudjacking. Consult a foundation repair pro to determine the best way to lift your sinking foundation. 

The polyurethane used for polyjacking will expand and cure in 15 to 30 minutes. After that point, your slab will be safe to walk on and even drive on in the case of a sidewalk or concrete driveway. Double-check with your concrete lifting specialist to confirm a curing timeline, as products can differ.

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The exact time can vary depending on the size of the project. Because the slurry mixture contains cement, it must fully harden to ensure that added weight from walking, furniture, or vehicles won't shift the concrete slab. A professional contractor can advise you on when the surface is safe to use. For comparison, if you use polyjacking instead, the polyurethane foam can dry in just a few minutes, but it's best to wait about an hour before use.

The Tigerton, WI homeowners’ guide to concrete mudjacking services

From average costs to expert advice, get all the answers you need to get your job done.