Top-rated concrete mudjacking pros.

Get matched with top concrete mudjacking pros in Marion, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your concrete mudjacking project in Marion, WI?

Select your specific project to find the pro for you.

Find Concrete mudjacking pros in Marion

Avatar for R&M Concrete Lifting
R&M Concrete Lifting
5.0(
4
)

Serving Marion, WI and surrounding areas

In business since 2024

Free estimates

Small jobs welcome

"The workers were friendly and cared about their work. They arrived on time and worked until dark. Never had home contractors more dedicated to their craft."
Driveway
Garage floor
Driveway
Driveway
Driveway

+1

Response time8 hrs
Recommended by100%of homeowners
Concrete Mudjacking questions, answered by experts

Most projects take 1-3 hours, with immediate usability after completion.

Concrete leveling can last anywhere from five to 10 years or more, and in some cases, it can be a permanent solution. The longevity depends on the method used and whether the underlying cause of the sinking is addressed. For example, mudjacking typically lasts five to 10 years, while polyjacking can last for 20 years or more. It's best to consult a professional for an accurate timeline based on your specific situation and any factors that could cause the issue to recur.

Trenching and boring are two distinct methods for installing underground utilities. Trenching involves digging a channel using equipment like an excavator, trencher, backhoe, or shovel. While it is a simpler process, it causes significant disruption to the surface, landscaping, and surrounding ecosystems.

Boring, also known as directional boring, is a less invasive alternative that uses a drill to create a tunnel for utility lines without disturbing the surface. This method is more precise and is ideal for installations that need to go underneath buildings, roads, or bodies of water. Although boring is less disruptive, it is generally more expensive than trenching.

A slurry of cement, sand, and water is injected beneath the concrete to lift and stabilize it.

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The exact time can vary depending on the size of the project. Because the slurry mixture contains cement, it must fully harden to ensure that added weight from walking, furniture, or vehicles won't shift the concrete slab. A professional contractor can advise you on when the surface is safe to use. For comparison, if you use polyjacking instead, the polyurethane foam can dry in just a few minutes, but it's best to wait about an hour before use.

The Marion, WI homeowners’ guide to concrete mudjacking services

From average costs to expert advice, get all the answers you need to get your job done.