Top-rated concrete mudjacking pros.

Get matched with top concrete mudjacking pros in Manawa, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your concrete mudjacking project in Manawa, WI?

Select your specific project to find the pro for you.

Find Concrete mudjacking pros in Manawa

Avatar for R&M Concrete Lifting
R&M Concrete Lifting
5.0(
4
)

Serving Manawa, WI and surrounding areas

In business since 2024

Free estimates

Small jobs welcome

"The workers were friendly and cared about their work. They arrived on time and worked until dark. Never had home contractors more dedicated to their craft."
Driveway
Garage floor
Driveway
Driveway
Driveway

+1

Response time8 hrs
Recommended by100%of homeowners
Concrete Mudjacking questions, answered by experts

The timeframe is generally a few hours, allowing for immediate use post-hydration, ensuring minimal disruption to surrounding activities.

The average cost for mudjacking is around $1,200, though prices can range from $300 to $3,400. On a per-square-foot basis, you can expect to pay between $3 and $8, with an average of about $5 per square foot. The final cost depends on several factors, including the square footage of the concrete, the type of slab, its accessibility, whether it is load-bearing, and the type of material used to lift it. Generally, lifting a driveway, small patio, or sidewalk is less expensive than lifting a slab foundation or garage floor.

The method involves lifting settled concrete using pressurized cement slurry via drilled holes. This solves uneven surfaces and prevents further settling.

Polyjacking and mudjacking can both be effective solutions for sinking concrete, but they have key differences. Polyjacking, which uses expanding polyurethane foam, is often considered a better option because the foam is significantly lighter than the cementitious material used for mudjacking. This reduced weight puts less pressure on the underlying soil and lowers the risk of future sinking. Polyjacking is suitable for any sinking concrete slab, while mudjacking is typically only recommended for non-structural concrete, such as sidewalks, patios, pool decks, and driveways. The primary drawback of polyjacking is its cost, which can be up to four times higher than mudjacking—as much as $25 per square foot compared to a maximum of about $6 per square foot for mudjacking.

The polyurethane used for polyjacking will expand and cure in 15 to 30 minutes. After that point, your slab will be safe to walk on and even drive on in the case of a sidewalk or concrete driveway. Double-check with your concrete lifting specialist to confirm a curing timeline, as products can differ.

The Manawa, WI homeowners’ guide to concrete mudjacking services

From average costs to expert advice, get all the answers you need to get your job done.